• 제목/요약/키워드: bi-directional corrugated structure

검색결과 4건 처리시간 0.024초

두 방향 주름구조를 내부구조로 하는 금속 샌드위치 판재의 제작 및 성형 (Fabrication and forming of metallic sandwich plates with bi-directional corrugated inner structure)

  • 성대용;정창균;심도식;양동열;김지용;김종호;정완진
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 2006년도 춘계학술대회 논문집
    • /
    • pp.281-284
    • /
    • 2006
  • Metallic sandwich plates with hi-directional inner structure are important new structures for forming applications. Bi-directional corrugated inner structures with less than 25% of relative density are fabricated by piecewise sectional forming process and then bonded with two face sheets by adhesive bonding. Drawing and U-bending experiments have performed and shown that the radius of curvature of sandwich plates is 75mm and sandwich plates are bended 90 degrees without collapse of inner structures. Bi-directional inner structures are suggested to improve formability of sandwich plates for bending and drawing.

  • PDF

물결모양 구조를 갖는 광대역 슬롯 안테나 (Wideband Slot Antenna with Corrugated Structure)

  • 김태원;윤성준;이희재;최재훈
    • 한국전자파학회논문지
    • /
    • 제27권1호
    • /
    • pp.14-19
    • /
    • 2016
  • 본 논문에서는 물결모양 구조를 갖는 광대역 슬롯 안테나를 제안하였다. 제안된 안테나는 물결모양 슬롯 구조를 가지는 접지면과 마이크로스트립 급전선으로 이루어져 있다. $70{\times}70{\times}1.6mm$의 한정된 크기에서 제안된 안테나는 물결모양 슬롯 구조를 통해 전류의 경로를 길게 하여 보다 동작주파수를 낮추었으며, 광대역의 대역폭을 갖는다. 안테나의 측정된 10 dB 반사손실 대역폭은 2,180 MHz(2.5~4.68 GHz)이며, 중심주파수 3.59 GHz에서 비대역폭 60.7 %를 가진다. 제안된 안테나는 전방향성 방사 패턴을 가지며, 측정된 이득과 평균효율은 3.48~5.83 dBi, 81.55 %의 값을 갖는다.

Push-out test on the one end welded corrugated-strip connectors in steel-concrete-steel sandwich structure

  • Yousefi, Mehdi;Ghalehnovi, Mansour
    • Steel and Composite Structures
    • /
    • 제24권1호
    • /
    • pp.23-35
    • /
    • 2017
  • Current form of Corrugated-strip connectors are not popular due to the fact that the two ends of this form need to be welded to steel face plates. To overcome this difficulty, a new system is proposed in this work. In this system, bi-directional corrugated-strip connectors are used in pairs, and only one of their ends is welded to the steel face plates on each side. The other end is embedded in the concrete core. To assemble the system, common welding devices are required, and welding process can be performed in the construction sites. By performing the Push-out test under static loading, the authors experimentally assess the effects of geometric parameters on ductility, failure modes and the ultimate shear strength of the aforesaid connectors. For this purpose, sixteen experimental samples are prepared and investigated. For fifteen of these samples, one end of the shear connectors is welded to steel face plates, and the other end is embedded in the concrete. Another experimental sample is prepared in which both ends are welded to the steel face plates. According to the achieved results, several relations are proposed for predicting the ultimate shear strength and load vs. interlayer slip (load-slip) behavior of corrugated-strip connectors. Moreover, these formulas are compared with those of the well-known codes and standards. Accordingly, it is concluded that the authors' relations are more reliable.

Geotechnical Engineering Progress with the Incheon Bridge Project

  • Cho, Sung-Min
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.133-144
    • /
    • 2009
  • Incheon Bridge, 18.4 km long sea-crossing bridge, will be opened to the traffic in October 2009 and this will be the new landmark of the gearing up north-east Asia as well as the largest & longest bridge of Korea. Incheon Bridge is the integrated set of several special featured bridges including a magnificent cable-stayed girder bridge which has a main span of 800 m width to cross the navigation channel in and out of the Port of Incheon. Incheon Bridge is making an epoch of long-span bridge designs thanks to the fully application of the AASHTO LRFD (load & resistance factor design) to both the superstructures and the substructures. A state-of-the-art of the geotechnologies which were applied to the Incheon Bridge construction project is introduced. The most Large-diameter drilled shafts were penetrated into the bedrock to support the colossal superstructures. The bearing capacity and deformational characteristics of the foundations were verified through the world's largest static pile load test. 8 full-scale pilot piles were tested in both offshore site and onshore area prior to the commencement of constructions. Compressible load beyond 30,000 tonf pressed a single 3 m diameter foundation pile by means of bi-directional loading method including the Osterberg cell techniques. Detailed site investigation to characterize the subsurface properties had been carried out. Geotextile tubes, tied sheet pile walls, and trestles were utilized to overcome the very large tidal difference between ebb and flow at the foreshore site. 44 circular-cell type dolphins surround the piers near the navigation channel to protect the bridge against the collision with aberrant vessels. Each dolphin structure consists of the flat sheet piled wall and infilled aggregates to absorb the collision impact. Geo-centrifugal tests were performed to evaluate the behavior of the dolphin in the seabed and to verify the numerical model for the design. Rip-rap embankments on the seabed are expected to prevent the scouring of the foundation. Prefabricated vertical drains, sand compaction piles, deep cement mixings, horizontal natural-fiber drains, and other subsidiary methods were used to improve the soft ground for the site of abutments, toll plazas, and access roads. Light-weight backfill using EPS blocks helps to reduce the earth pressure behind the abutment on the soft ground. Some kinds of reinforced earth like as MSE using geosynthetics were utilized for the ring wall of the abutment. Soil steel bridges made of corrugated steel plates and engineered backfills were constructed for the open-cut tunnel and the culvert. Diverse experiences of advanced designs and constructions from the Incheon Bridge project have been propagated by relevant engineers and it is strongly expected that significant achievements in geotechnical engineering through this project will contribute to the national development of the longspan bridge technologies remarkably.

  • PDF