• Title/Summary/Keyword: bar placing

Search Result 34, Processing Time 0.031 seconds

A Study on the Improvement of Erection Bar Detailing in Domestic Building Construction (국내 건축물 조립용 철근 배근현황 및 개선방안에 관한 연구)

  • Jung, Hyeon-Ok;Cho, Hun-Hee;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.39-46
    • /
    • 2009
  • The erection bar is defined as the assistant bar used to fix the position of the reinforcing steel as the reinforcing steel is placed on site. As the erection bar do not bear the structural load and is not showed in the structural drawings, it is not managed importantly. But as chair bars in mat footing is used in large quantities to support the upper main bars, the detailing standards need to be suggested. and some erection bar is placed by experience of the fabricator and placer. Therefore, in this study, a survey about the erection bars was conducted to the reinforcement detailer, the fabricator and placer of domestic construction industry. 11 placing drawings is analyzed to find out the problems of detailing and the quantities of the erection bars. According to the analysis of the survey, the erection bar details in placing drawings were not standardized, and some erection bars are omitted in placing drawings. The improvement in the erection bar detailing was sought by analyzing the results of the survey.

Automated Bar Placing Model Generation for Augmented Reality Using Recognition of Reinforced Concrete Details (부재 일람표 도면 인식을 활용한 증강현실 배근모델 자동 생성)

  • Park, U-Yeol;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.3
    • /
    • pp.289-296
    • /
    • 2020
  • This study suggests a methodology for automatically extracting placing information from 2D reinforced concrete details drawings and generating a 3D reinforcement placing model to develop a mobile augmented reality for bar placing work. To make it easier for users to acquire placing information, it is suggested that users takes pictures of structural drawings using a camera built into a mobile device and extract placing information using vision recognition and the OCR(Optical Character Registration) tool. In addition, an augmented reality app is implemented using the game engine to allow users to automatically generate 3D reinforcement placing model and review the 3D models by superimposing them with real images. Details are described for application to the proposed methodology using the previously developed programming tools, and the results of implementing reinforcement augmented reality models for typical members at construction sites are reviewed. It is expected that the methodology presented as a result of application can be used for learning bar placing work or construction review.

Mobile Augmented Reality for Teaching Bar Placing (철근 배근 교육을 위한 증강현실 컨텐츠 개발)

  • Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.5
    • /
    • pp.471-477
    • /
    • 2018
  • The purpose of this study is to develop an mobile augmented reality for students to learn bar placing work, which is increasingly utilized in the construction field. In order to improve the understanding of the structural drawing, a structural drawing is used as a marker image, and an augmented reality is realized by superimposing a virtual 3D bar placing model that is placed according to the structural drawing on the screen. In addition to the 3D modeling, the contents are developed so as to help students to learn the interpretation method of 2D drawings, the development and splices of reinforcing steel, bar fabricating practice according to KCI structural concrete design code, and the process of bar placing. The results show that the augmented reality is positively evaluated in terms of interface style, perceived usefulness, perceived ease of use, perceived enjoyment, attitude toward using, and intention to use. The augmented reality is worth to be introduced because it has advantages of visualization and interaction in terms of education.

Development of Support System in Preparing Placing Drawings for the Improvement of Efficiency of Reinforcing Steel Works

  • Hyeon-Yong Park;Tai-Kyoung Kang;Yoo-Sub Lee;Hun-Hee Cho;U-Yeol Park;Hyun-Oak Jung;Kyo-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1370-1376
    • /
    • 2009
  • Reinforcing steel works should be carefully controlled by the construction manager considering the severe fluctuation of the price of reinforcing steel bars and for the safety of structure in building constructions. In particular, preparing rebar placing drawings needs more effort and time than before because of the emergence of higher and more complicated buildings. Moreover, the experience of field engineers or foremen (fabricators or detailers) in preparing placing drawings gives rise to the differences in fabricated bar type and quantity of bars used. To address these problems, this study proposed the support system in preparing placing drawings for reinforcing steel works efficiency. In the near future, if this system can be made available on the web, multiple end-users will be able to share the result; the efficiency of rebar supply chain management will also be improved.

  • PDF

Field Investigation Study of WWF Placing for the Apartment Building Construction (구조용 용접철망을 적용한 아파트 구조물의 시공성에 관한 연구)

  • 안경수;김상연;윤영호;양지수;이리형
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.04a
    • /
    • pp.657-662
    • /
    • 1997
  • In these day, there have been shortage of construction workers and an increase of labor cost in our county. In order to overcome these problems, prefabricated and mechanized system of bar placing have been used in the construction fields. As a part of this tendency, welded wire fabric(WWF) reinforcement were studied several years ago. In this study, the required working hour. the labor power and the construction process of WWF reinforcement for the apartment building slabs are reported. From the result of field investigations, it is showed that the WWF reinforcement facilitates the field placing and the working time of WWF placing is saved, and then the labor cost of WWF reinforcement is less than that of the conventional bar reinforcement.

  • PDF

Fundamental Study on Visualization of Bar Placing Records Using Augmented Reality (증강현실을 활용한 배근 이력 가시화 방안에 관한 기초적 연구)

  • Park, U-Yeol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.126-127
    • /
    • 2018
  • Rebar work is important in terms of cost and process of reinforced concrete construction along with formwork and concrete construction, and the quality of reinforced concrete construction has a great influence on the safety and durability of the structure. Therefore it is important to thoroughly inspect the steel reinforcement after casting the concrete because it is difficult to confirm the actual condition of the reinforcement. The purpose of this study is to develop an augmented reality system to visualize the records of bar placing work, which is increasingly utilized in the construction field. In order to improve maintenance of reinforced concrete, this study suggests a plan to effectively manage the drawing information including the structural drawing, the placing drawing, and the photographed image at the construction and inspection stage, and develop a system that utilizes augmented reality technology that can display the state of the inside of a concrete structure by superimposing it on actual environment.

  • PDF

A Study on the Improvement of Reinforcing Bar Detailing (국내 철근공사 배근상세 개선방안에 관한 연구)

  • Park, U-Yeol;Kim, Baek-Jung;Jung, Hyun-Ok;Yun, Seok-Heon;Cho, Hun-Hee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.83-90
    • /
    • 2008
  • The reinforcing steel process is composed of the development of placing drawing, cutting and bending, and the placement and fabrication of the reinforcement, and is participated in by reinforcement detailer, the fabricator and placer. Because the reinforcing steel process-from estimating and rebar detailing, to production, material tracking, billing, and general accounting-is conducted by many participant, reinforcement details based on building code and reinforcing bar detailing standards are essential. The process, however, holds some problems. Building code has been revised recently, and the utilization of placing drawings was proved to be low, and the reinforcement estimating in early stage of the process is below what is required for placement. Therefore, in this study, a survey was conducted to the reinforcement detailer, the fabricator and placer of domestic construction industry. According to the analysis of the survey, the reinforcement details on site was not standardized. The improvement in reinforcing steel detailing standards was sought by analyzing the results of the survey including reinforcement constructability.

Temperature Rise of Steel bars Located in a Gang Form Before Placing Concrete During Hot Weather Condition (서중환경시 갱폼 거푸집 내부 철근의 온도변화)

  • Kim, Kyoung-Hoon;Son, Ho-Jung;Lim, Chun Keun;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.11-12
    • /
    • 2012
  • This study investigates the temperature rise of reinforcement bars located in the middle of the form (for reinforcement concrete) during hot weather condition. The temperature was measured for three consecutive days before placing concrete. Test results showed that the temperature started to increase at 7:00 AM before sun rised, and peaked at around 2:00 PM. It was found that the thinner the diameter of a reinforcement bar, the higher is the speed of temperature rise and drop of the bar. The peak level of temperature for D13, D19, D25 and D32 was 54.4℃, 55.2℃, 56.4℃ and 60.2℃, respectively.

  • PDF

An Experimental Study on the Blocking Performance Considering Construction Joint of Placement (콘크리트 이어붓기 시공에 있어 차단성에 관한 실험적 연구)

  • 김은호;정덕우;한민철;류현기;한천구
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.257-260
    • /
    • 2002
  • This study is intended is to analyze the blocking performance with variation of the gap of bar and kinds of metal lath for construction joint when placing concrete. According to the results, passing ratio of concrete increases with increase of vibrating time. In the case of W/C 50%, when blocking concrete with bar of D10 and D20 which the gap of bar is below 200mm, or metal lath, passing ratio of concrete is below 10%, so blocking performance is favorable. In the case of W/B 30%, while concrete does not flow out without vibration at slump 21mm, concrete flows out at some degree before vibration at slump flow 65mm and then, as 5 seconds passes after first vibration, final passing ratio shows about 85~90%. When blocking concrete by bar D10 of the gap 20mm, bar D20 of the gap 10mm and metal lath, it is thought that concrete can be blocked effectively because final passing ratio is below 10%.

  • PDF

Finite Element Analysis of Exterior R.C. Beam-Column Joints Containing Headed Bars utilized for Enhanced Seismic Performance (Headed bar를 사용한 외부 철근 콘크리트 보-기둥 접합부의 강화된 내진 성능에 대한 유한요소해석)

  • Bang, Suk;Lee, Joo-Ha;Yoon, Young-Soo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.506-509
    • /
    • 2004
  • This paper proposes Headed bar as reinforcement of beam-column joint, and proves seismic performance and reduction of reinforcement congestion. In these case, the use of Headed bars have obvious advantages. The greatest benefit of using Headed bars is not only improved structural performance of beam-column joints, but also the ease of fabrication, construction, and placement. Three-dimensional finite element analysis model is compared with test program which was fulfilled by the proposed model with Headed bar. Also, the plastic hinge region is relocated to the center of the longitudinal beam length according to the strong column-weak beam design philosophy, so Headed bar is used as the joint reinforcement. Therefore, this paper presents results of a computer analysis of a practical solution for relocating potential beam plastic hinge regions by the placing of straight - Headed bar.

  • PDF