Among the various thermal properties, thermal conductivity of soils is one of the most important parameters to design a horizontal ground heat exchanger for ground-coupled heat pump systems. It is well known that the thermal conductivity of soil is strongly influenced by its density and water content because of its particulate structure. This paper evaluates some of the well-known prediction models for the thermal conductivity of particulate media such as soils along with the experimental results. The semi-theoretical models for two-component materials were found inappropriate to estimate the thermal conductivity of dry soils. It comes out that the model developed by Cote and Konrad provides the best overall prediction for unsaturated sands available in the literature. Also, a parametric analysis is conducted to investigate the effect of thermal conductivity, water content and soil type on the horizontal ground heat exchanger design. The results show that a design pipe length for the horizontal ground heat exchanger can be reduced with an increase in soil thermal conductivity. The current research concludes that the dimension of the horizontal ground heat exchanger can be reduced to a certain extent by backfilling materials with a higher thermal conductivity of solid particles.
There have been a number of water and sewer pipe breakdown reports followed by ground subsidence. Also, the excavating works for construction due to overcrowding of city have been common. Particularly, in urban areas ground becomes unstable because of the lowered lifeline sinkage followed excavation and backfilling. In order to solve the problem, some reinforcement works for ground by rod tamping or grouting have been applied. However, it is hard to predict when the buried utilities in underground will be damaged. Also, there is a limit for the underground exploration and investigation methods. Therefore, in this study, the estimated about the water soluble polymer pouch including poor mixed admixture which is designed to eliminate the dangerous factors. The reinforcement strength of this method was confirmed by verifying three points: meltiness in a certain period, water solubility in the ground water level, and characteristics of the pouch, which can be stored in daily conditions. It is also proved that this method allows to keep the ground from getting weakened in the installation of water and sewer pipe along with back filling materials.
Thermocondensation root canal filling technique have been used to fill accessary canals or to obtain homogeneous root caral fillings. But these thermocondensation technique inevitably produce heat in the canal which can be transmitted through the dentin and cementum and consequently damage periodontal ligamental cells and osteoblasts. In this study, System $B^{TM}$(Analytic technology, WA.D.S.A.) was used to evaluate the reaction of periodontal ligament tissue to "Continous Wave condensation technique" introduced by Buchanan, and the transmitted root surface temperature was measured according to measured root thicknesses. 12 Mandibular incisors of two adult dogs were used for the experiment. 6 controls were filled by lateral condensation technique with sealer.3 specimens were apically filled by Continuous Wave technique at $200^{\circ}C$ for 5 seconds and remaining 3 specimens were additionally backfilled using System $B^{TM}$(Analytic technology, WA.D.S.A.) was used to evaluate the reaction of periodontal ligament tissue to "Continous Wave condensation technique" introduced by Buchanan, and the transmitted root surface temperature was measured according to measured root thicknesses. 12 Mandibular incisors of two adult dogs were used for the experiment. 6 controls were filled by lateral condensation technique with sealer.3 specimens were apically filled by Continuous Wave technique at $200^{\circ}C$ for 5 seconds and remaining 3 specimens were additionally backfilled using System $B^{TM}$ at $100^{\circ}C$ for 20 seconds. Six weeks later, the dogs were sacrificed and the teeth stained with Hematoxylin and Eosin for histologic examination. 6 extracted human teeth were used to measure the transmitted temperature. After cutting off the crown, the canals were prepared and divided into 3 groups with root thickness of 1.5mm, 1.0mm, 0.5mm, 2 teeth in each group. Inside each root canal, System $B^{TM}$ was heated as with the temperature for the apically condensed and the back filled group, and the transmitted heat was measured on the external surface of the root. The temperature of System $B^{TM}$ heat spreader at $200^{\circ}C$ and $100^{\circ}C$ was also measured at root temperature. It can be concluded as follows: 1. In the thin area (200-$250{\mu}m$) of the root, root resorption could be seen even with heating at $200^{\circ}C$ for 5 seconds. 2. When the spreader was heated at $200^{\circ}C$ for 5 seconds and additionally at $100^{\circ}C$ for 20 seconds for backfill, all teeth showed root resorption regardless of their root thickness. 3. The transmitted external root surface temperature was higher as the root thickness decreased and as the heating time increased. In the thermocompaction technique using System $B^{TM}$, the spreader should be heated for the minimal time and used only in the apical area. The heated spreader shouldn't inserted to the binding point of the canal and backfilling should be done with other means of minimally heated gutta percha technique.
Journal of Korean Tunnelling and Underground Space Association
/
v.24
no.6
/
pp.637-658
/
2022
TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.
Journal of Korean Tunnelling and Underground Space Association
/
v.21
no.1
/
pp.93-113
/
2019
The behavior of the 3 hinged precast arch structure was investigated by comparing field measurements with numerical analyses performed for precast lining arch structures, which are widely used for the open-cut tunnel. According to the field measurements, the maximum vertical displacement occurred at the crown with upward displacements during the backfilling up to the crown of the arch and downward displacements at the backfill height above the crown. The final crown displacement was 19 mm upward from the original position. The horizontal displacement at the sidewall, which had a maximum horizontal displacement, occurred inward of the arch when compacting the backfill up to the crown and returned to the original position after completing the backfill construction. According to the analysis of displacement measurements, economical design is expected to be possible for precast arch structures compared to rigid concrete structures due to ground-structure interactions. Duncan model gave good results for the estimation of displacements and deformed shape of the tunnel according to the numerical analyses comparing with field measurements. The earth pressure coefficients calculated from the numerical analyses were 0.4 and 0.7 for the left and the right side of the tunnel respectively, which are agreed well with the eccentric load acting on the tunnel due to topographical condition and actual field measurements.
Due to population growth and industrial development, the amount of industrial waste is increasing every year. In particular, in a thermal power plant using finely divided coal, a large amount of coal ash is generated after combustion of the coal. Among them, fly ash is recycled as a raw material for cement production and concrete admixture, but about 20% is not utilized and is landfilled. Due to the continuous reclamation of such a large amount of coal ash, it is required to find a correct treatment and recycling plan for the coal ash due to problems of saturation of the landfill site and environmental damage such as soil and water pollution. In recent years, the use of a fluid embankment material that can exhibit an appropriate strength without requiring a compaction operation is increasing. The fluid embankment material is a stable treated soil formed by mixing solidifying materials such as water and cement with soil, which is the main material, and has high fluidity before hardening, so compaction work is not required. In addition, after hardening, it is used for backfilling or filling in places where compaction is difficult because higher strength and earth pressure reduction effect can be obtained compared to general soil. In this study, the possibility of use of fluidized soil using high water content cohesive soil and coal ash is considered. And it is intended to examine the flow characteristics, strength, and bearing capacity characteristics of the material, and to investigate the effect of reducing the earth pressure when applied to an underground burial.
Woo-Jin, Han;Seung-Ju, Jang;Sang-Soo, Bae;Seung-Yup, Jang;Myung-Seok, Bang
Journal of the Korean Geosynthetics Society
/
v.21
no.4
/
pp.41-53
/
2022
In the excavation work like blasting/excavator work bordering on the urban railway, the dynamic safety of railway structures like tunnel, open-cut box structure and elevated bridge was investigated by numerical analysis in this study. The practically presented criteria on influential zones at the blasting work in the construction industry was numerically checked in cases of the precise vibration-controlled blasting (type II) and the small scale vibration-controlled blasting (type III) and it was shown that the criteria on blasting work methods needed to be supplemented through continuous field tests and numerical analyses. The influence of excavation vibration by mechanical excavators was especially investigated in case of earth auger and breaker. The numerical analysis of tunnel shows that the criteria on vibration velocities from the regression analysis of field test values was conservative. The amplification phenomenon of excavating vibration velocity was shown passing through the backfilling soil between the earth auger and the open-cut box structure. It was shown that the added-vibration on the superstructure of elevated bridge was occurred at the bottom of pile like earthquake when the excavator vibration was arriving at the pile toe. The systematic and continuous research on the vibration effect from excavating works was needed for the safety of urban railway structures and nearby facilities.
Nguyen, The Bao;Lee, Chul-Ho;Choi, Hang-Seok;Kim, Sang-Gyun
Journal of the Korean Geotechnical Society
/
v.24
no.11
/
pp.121-131
/
2008
In constructing a slurry trench cutoff wall, bentonite-water slurry is used to secure the stability of sidewalls during excavation before the wall is completed by backfilling. Unexpectedly, a thin but relatively impermeable layer called filter cake can be formed on the excavation surface, which significantly influences the result of slug test analysis in the cutoff wall if not considered. This study is to examine the effect of filter cake on evaluating hydraulic conductivity of the vertical cutoff wall through slug test analysis with the aid of the verified numerical program Slug_3D. The no-flux boundary conditions were adopted in Slug_3D to simulate the filter cake on the interface between the wall and the natural soil. A new set of type curves were built for applying the type curve method. New modification factors were obtained for using the modified line-fitting method. With consideration of filter cake, the type curve method and the modified line-fitting method were adopted to reanalyze the case study taken from EMCON (1995). The previous results achieved by Choi and Daniel (2006) without consideration of filter cake were compared with the present results obtained in this paper. The comparison emphasizes the necessity of considering filter cake when analyzing slug test results in vertical cutoff walls.
Melvin B. Diaz;Sang Seob Kim;Gyung Won Lee;Kwang Yeom Kim;Changsoo Lee;Jin-Seop Kim;Minseop Kim
Geomechanics and Engineering
/
v.34
no.4
/
pp.449-459
/
2023
The design and development of underground nuclear waste repositories should cover the performance evaluation of the different components such as the construction materials because the long term stability will depend on their response to the surrounding conditions. In South Korea, Gyeonju bentonite has been proposed as a candidate to be used as buffer and backfilling material, especially in the form of blocks to speed up the construction process. In this study, various cylindrical samples were prepared with different dry density and water content, and their physical and mechanical properties were analyzed and correlated with X-ray CT observations. The main objective was to characterize the samples and establish correlations for non-destructive estimation of physical and mechanical properties through the utilization of X-ray CT images. The results showed that the Uniaxial Compression Strength and the P-wave velocity have an increasing relationship with the dry density. Also, a higher water content increased the values of the measure parameters, especially for the P-wave velocity. The X-ray CT analysis indicated a clear relation between the mean CT value and the dry density, Uniaxial Compression Strength, and P-wave velocity. The effect of the higher water content was also captured by the mean CT value. Also, the relationship between the mean CT value and the dry density was used to plot CT dry densities using CT images only. Moreover, the histograms also provided information about the samples heterogeneity through the histograms' full width at half maximum values. Finally, the particle size and heterogeneity were also analyzed using the Madogram function. This function identified small particles in uniform samples and large particles in some samples as a result of poor mixing during preparation. Also, the μmax value correlated with the heterogeneity, and higher values represented samples with larger ranges of CT values or particle densities. These image-based tools have been shown to be useful on the non-destructive characterization of bentonite samples, and the establishment of correlations to obtain physical and mechanical parameters solely from CT images.
Journal of Korean Tunnelling and Underground Space Association
/
v.12
no.1
/
pp.75-85
/
2010
The focus of this study is to evaluate the field applicability of the newly developed inorganic thixotropic-grout in various ways. In order to do this, the volume stability and the permeability of the inorganic thixotropic-grout have been measured and compared to the existing silica type grouts. In addition, the filling capability of the grout into the tail void has been evaluated through both an experiment with a miniature tail-void filling equipment and a test filling at the shield TBM construction site. The volume loss of the inorganic thixotropic-grout after a 14 day-curing under the atmosphere condition was appeared to be minimal. The excellent waterproofing ability of the inorganic thixotropic-grout was confirmed through a permeability test. The toxicity of the inorganic thixotropic-grout has been evaluated through a toxicity test of aquatic fishes (KS M 0111) and the pH value of the liquid eluviated from inorganic thixotropic-grout was measured as an average of 8.0 and a fatality rate of goldfish after 96 hours was 10% or so. The existence of harmful heavy metals in the liquid eluviated from the inorganic thixotropic-grout has been also examined through an atomic absorption spectroscopy (AAS) test. Any of harmful heavy metals were not detected and the detected level of $Cr^{6+}$ and Cd was far below the standard. Based on both an experiment with a miniature tail-void filling equipment and a test filling at the shield TBM construction site, the filling ability of inorganic thixotropic-grout into the tail void was proved to be excellent.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.