• Title/Summary/Keyword: automated planning

Search Result 246, Processing Time 0.024 seconds

BIM-based Lift Planning Workflow for On-site Assembly in Modular Construction Projects

  • Hu, Songbo;Fang, Yihai;Moehler, Robert
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.63-74
    • /
    • 2020
  • The assembly of modular construction requires a series of thoroughly-considered decisions for crane lifting including the crane model selection, crane location planning, and lift path planning. Traditionally, this decision-making process is empirical and time-consuming, requiring significant human inputs. Recently, research efforts have been dedicated to improving lift planning practices by leveraging cutting-edge technologies such as automated data acquisition, Building Information Modelling (BIM) and computational algorithms. It has been demonstrated that these technologies have advanced lift planning to some degree. However, the advancements tend to be fragmented and isolated. There are two hurdles prevented a systematic improvement of lift planning practices. First, the lack of formalized lift planning workflow, outlining the procedure and necessary information. Secondly, there is also an absence of a shared information environment, enabling storages, updates and the distribution of information to stakeholders in a timely manner. Thus, this paper aims to overcome the hurdles. The study starts with a literature review in combination with document analysis, enabling the initial workflow and information flow. These were contextualised through a series of interviews with Australian practitioners in the crane-related industry, and systematically analysed and schematically validated through an expert panel. Findings included formalized workflow and corresponding information exchanges in a traditional lift planning practice via a Business Process Model and Notation (BPMN). The traditional practice is thus reviewed to identify opportunities for further enhancements. Finally, a BIM-based lift planning workflow is proposed, which integrates the scattered technologies (e.g. BIM and computational algorithms) with the aim of supporting lift planning automation. The resulting framework is setting out procedures that need to be developed and the potential obstacles towards automated lift planning are identified.

  • PDF

An automated process planning 8 die design using expert system for blanking or piercing of irregular shaped sheet metal products (불규칙성 박판제품의 프로그래시브 다이설계를 위한 자동화된 CAD시스템)

  • Kim, J. H.;Kim, C.;Choi, J. C.;Kim, B. M.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1995.10a
    • /
    • pp.214-218
    • /
    • 1995
  • Much labor, an exceedingly long lead time, and the skills of experienced engineers are required for press tool design. To reduce such problems, several CAD systems for blanking or piercing have been developed. This paper describes a computer-aided design for blanking or piercing of irregularly shaped sheet metal products. An approach to the system is based on knowledge base rules. The process planning & die design system is designed by considering several factors, such as complexity of blank geometry, punch profile, and availability of press equipment and standard parts. Therefore, after checking a production feasibility for irregular shaped sheet metal products, this system which is implemented strip layout module can carry out a process planning and generate the strip layout in graphic forms. Also this system implemented die layout module can carry out a die design for each process which is obtained form the result of an automated process planning and generate parts and assembly drawing of a die set.

  • PDF

Automation of block assignment planning using a diagram-based scenario modeling method

  • Hwang, In Hyuck;Kim, Youngmin;Lee, Dong Kun;Shin, Jong Gye
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.6 no.1
    • /
    • pp.162-174
    • /
    • 2014
  • Most shipbuilding scheduling research so far has focused on the load level on the dock plan. This is because the dock is the least extendable resource in shipyards, and its overloading is difficult to resolve. However, once dock scheduling is completed, making a plan that makes the best use of the rest of the resources in the shipyard to minimize any additional cost is also important. Block assignment planning is one of the midterm planning tasks; it assigns a block to the facility (factory/shop or surface plate) that will actually manufacture the block according to the block characteristics and current situation of the facility. It is one of the most heavily loaded midterm planning tasks and is carried out manually by experienced workers. In this study, a method of representing the block assignment rules using a diagram was suggested through analysis of the existing manual process. A block allocation program was developed which automated the block assignment process according to the rules represented by the diagram. The planning scenario was validated through a case study that compared the manual assignment and two automated block assignment results.

A Study on the Survey of the Automated Underwear Manufacture in Jeonbuk Area (전북지역 내의류 생산자동화에 대한 실태 조사 연구)

  • Lee, Jin-Hee
    • Korean Journal of Human Ecology
    • /
    • v.9 no.1
    • /
    • pp.107-116
    • /
    • 2000
  • The purpose of this study was to suggest the data of base for automated underwear manufacture by analyzing the technology of the automated underwear manufacturing facilities in the area of Jeonbuk with a focus on Jeonju and Iksan. The case study samples were 6 underwear firms. The results were as follows : 1. Automated underwear manufacturing systems in the area of JeonBuk introduced over the entire period between 1990 and 1997. Most of Their production type was multi-kind and small-quantity production. 2. They were using Gerber, Assyst, Lectra, Microdynamics and Investronica systems as the CAD/CAM system, of which the Gerber system was mostly used by them. 3. In the stage of production planning and in the stage of preparation for production, most of them realized automation, but in the stage of main production, every firm did not realize automation. In most cases, they used both the stage of mechanization and the stage of unit process automation.

  • PDF

Setup Planning for Computer Aided Fixture Planning System (치구계획의 자동화를 위한 작업준비계획)

  • Cho, Kyu-Kab;Jeong, Yeong-Deug
    • IE interfaces
    • /
    • v.5 no.1
    • /
    • pp.3-14
    • /
    • 1992
  • This paper deals with the development of setup planning for Automated FIXture planning system(AFIX) which selects setups, setup sequence and operation sequence in each setup according to the machining mode. In AFIX, part type considered is prismatic workpiece that use the 3-2-1 locating system as the general structure of the fixture. The heuristic algorithms selecting setup and setup sequence are based on DDR(Degree of Dimensional Relationship), AMV(Admissible Misalignment Value) and machining sterategy and feature attributes. A case example is given to illustrate the performance fo AFIX.

  • PDF

A Study on the Automated Process Planning System for Cold Forging of Non-axisymmetric Parts (비축대칭 제품의 냉간단조 공정설계시스템에 관한 연구)

  • Lee, Bong-Gyu;Jo, Hae-Yong;Gwon, Hyeok-Hong
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.19 no.2
    • /
    • pp.195-202
    • /
    • 2002
  • An automated process planning system for cold forging of non-axisymmetric parts of comparatively simple shape was developed in this study. Programs for the system have been written with Visual LISP in the AutoCAD using a personal computer and are composed of four main modules such as input module, shape cognition and shape expression module, material diameter determination module and process planning module. The design rules and knowledges for the system are extracted from the plasticity theories, handbook, relevant reference and empirical knowledge of field experts. Generally, in forging, only front view is needed for expression of axisymmetric parts, but non-axisymmetric parts need front and plane view. At the plane, this system cognizes the external shape of non-axisymmetric, parts - number of sides of regular polygon and radius of a circle circumscribing the polygon of n sides. At the front view, the system perceives diameter of axisymmetric portions and height of primitive geometries such as polygon, cylinder, cone, concave, convex, etc.

A study on operation method of handling equipments in automated container terminals (자동화 컨테이너터미널에서 운송 장비의 운영방안에 관한 연구)

  • 이상완;최형림;박남규;박병주;권해경;유동호
    • Proceedings of the Korea Society of Information Technology Applications Conference
    • /
    • 2002.11a
    • /
    • pp.296-303
    • /
    • 2002
  • The main subject to become a hub port is automation. The automated container terminal has already operated in advanced ports and it has been planned for the basic planning and operation design in domestic case. The key of automated container terminal is effective operation of both ATC(automated transfer crane) and AGV(automated guided vehicle) which is automated handling equipments. This is essential to poductivity of automated container terminal. This study suggests the most optimal method of equipment operation in order to minimize loading time using each three types of effective ATC operation methods and AGV dispatching rules in automated container terminals. As the automated equipment operation causes unexpected deadlocks or interferences, it should be proceeded on event-based real time. Therefore we propose the most effective ATC operation methods and AGV dispatching rules in this paper. The various states occurred in real automated container terminals are simulated to evaluate these methods. This experiment will show the most robust automated equipment operation method on various parameters(the degree of yard re-marshaling, the number of containers and the number of AGVs)

  • PDF

A study on operation method of handling equipments in automated container terminals (자동화 컨테이너터미널에서 운송 장비의 운영방안에 관한 연구)

  • 이상완;최형림;박남규;박병주;권해경;유동호
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 2002.11a
    • /
    • pp.296-303
    • /
    • 2002
  • The main subject to become a hub port is automation. The automated container terminal has already operated in advanced ports and it has been planned for the basic planning and operation design in domestic case. The key of automated container terminal is effective operation of both ATC(automated transfer crane) and AGV(automated guided vehicle) which is automated handling equipments. This is essential to productivity of automated container terminal. This study suggests the most optimal method of equipment operation in order to minimize loading time using each three types or effective ATC operation methods and AGV dispatching rules in automated container terminals. As the automated equipment operation causes unexpected deadlocks or interferences, it should be proceeded on event-based real time. Therefore we propose the most effective ATC operation methods and AGV dispatching rules in this paper. The various states occurred in real automated container terminals are simulated to evaluate these methods. This experiment will show the most robust automated equipment operation method on various parameters(the degree of yard re-marshaling, the number of containers and the number of AGVs)

  • PDF

A Computerized Model Development for Plant Layout Planning and Economic Analysis (컴퓨터를 이용한 공장설계 및 경제성 분석 Model 개발연구)

  • 이상도;김정자;송서일;하정진;이상원;서순근;박구현;정중희
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.6 no.8
    • /
    • pp.1-11
    • /
    • 1983
  • This study is consists of two parts. First, we analyzed two construction algorithms; CORELAP( Computerized Relationship Layout Planning) and ALDEP (Automated Layout Design Program). And we made a New Relationship Layout Planning overcoming the defaults of CORELAP and ALDEP. Second, we described the only improvement algorithm CRAFT(Computerized Relative Allocation of Facilities Technique). And we modified the CRAFT, which is considering the economic evaluation.

  • PDF

Preliminary design of a production automation framework for a pyroprocessing facility

  • Shin, Moonsoo;Ryu, Dongseok;Han, Jonghui;Kim, Kiho;Son, Young-Jun
    • Nuclear Engineering and Technology
    • /
    • v.50 no.3
    • /
    • pp.478-487
    • /
    • 2018
  • Pyroprocessing technology has been regarded as a promising solution for recycling spent fuel in nuclear power plants. The Korea Atomic Energy Research Institute has been studying the current status of equipment and facilities for pyroprocessing and found that existing facilities are manually operated; therefore, their applications have been limited to laboratory scale because of low productivity and safety concerns. To extend the pyroprocessing technology to a commercial scale, the facility, including all the processing equipment and the material-handling devices, should be enhanced in view of automation. In an automated pyroprocessing facility, a supervised control system is needed to handle and manage material flow and associated operations. This article provides a preliminary design of the supervising system for pyroprocessing. In particular, a manufacturing execution system intended for an automated pyroprocessing facility, named Pyroprocessing Execution System, is proposed, by which the overall production process is automated via systematic collaboration with a planning system and a control system. Moreover, a simulation-based prototype system is presented to illustrate the operability of the proposed Pyroprocessing Execution System, and a simulation study to demonstrate the interoperability of the material-handling equipment with processing equipment is also provided.