• 제목/요약/키워드: assessment of service life

Search Result 330, Processing Time 0.032 seconds

Basic Design of Software for Eco-Efficiency Assessment of Electric Motor Unit(EMU) (전동차 에코효율성 평가를 위한 S/W 기본설계)

  • Kim, Yong-Ki;Lee, Jae-Young;Seo, Min-Seok;Eun, Jong-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1253-1258
    • /
    • 2006
  • As a global effort to conservate the environment, life cycle assessment(LCA) which considers the environmental impact through the life cycle of a product, from acquiring of resources to scrapping, has been actively applied. The LCA is a tool to calculate quantitatively the environmental impacts caused by products or services through their life cycles. Eco-efficiency need that express value of environmental impact provision EMU and develops in two forms according to use target of Eco-efficiency as a tool that environmental impact of EMU. It is a strategic instrument which assists stakeholders to understand which products, processes or services to target with future investments and which are not by comparing economic and ecological values. The results stand for aggregated information on economical value and environmental impact. Also, In this method, it is important to derive EPI(Environmental Performance Index) and SPI(Service Performance Index) from the sources available. The following is used as one of Eco-efficiency tools to achieve the target performance of processes, products and services for designer or projector. According to the eco-efficiency methodology for EMU developed in this study, the user definition and the DB design were carried out as a basic design of eco-efficiency S/W.

  • PDF

Fatigue Life Assessment and Stress History Measurement of Steel Truss Railway Bridge occurring Fatigue Damages (피로손상이 발생한 강트러스철도교의 응력이력계측 및 피로수명평가)

  • 장동일;경갑수;조광현;홍성욱
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.1
    • /
    • pp.132-139
    • /
    • 2000
  • In this study, the fatigue life assessments of steel railway bridge in Japan National Railway were carried out. This railway bridge has been under in service from 1957, and fatigue damages were occurred at bead toe of upper part of vertical stiffeners of stringers, bead toes of scallop in lower part of vertical stiffeners in stringers and crossings of cross beams and stringers. From this study, a series of field tests were carried out by stress history measurement about above mentioned points. And as a results of stress histogram analysis, cummulative fatigue damage rate and fatigue life of these members should be calculate quantitatively. And from this estimation technique, cummulative fatigue damage rate and fatigue life of this railway bridge were strongly affected in passing tonage every year and the histories of live load.

  • PDF

Life Cycle Assessment of Korean Tilting Train eXpress for Environmental Declaration of Product(EDP) (환경성적표지 인증을 위한 한국형 틸팅열차의 전과정평가)

  • Lee, Hyun-Bae;Kim, Yong-Ki;Lee, Kun-Mo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.2262-2269
    • /
    • 2010
  • A recent Tilting train development operation for existing line high speed, already developed "Korean Tilting Train eXpress(bellow TTX)" and that doing demonstration of operation. And TTX are going to commercial service in 2012. They are preparing Environmental Declaration of Product(bellow EDP) for offering environmental impact of TTX to customer. EDP calculated environmental impact of target product's whole life cycle(raw material and manufacturing, distribution, use, end of life) more quantity for that improving environmental impact and then certification them, it is using for that estimate some part of existence of specific pollutants, GHGs, energy consumption and recycling ratio. In this study, 1) analyze the process of getting EDP, 2) satisfy common criteria and each criteria(plan) in the Product Category Rules(bellow PCRs) provided KEITI, 3) according to ISO 14044, implementation of LCA. 4) These results be shown Characterized Impact(bellow CI) about each life cycle stage and six impact categories(ARD, GWP, OD, AD, EU, POC).

  • PDF

The behaviour of strength and fatigue crack propagation of various steels in steel bridges (철강구조물 부재의 강도평가 및 피로균열진전거동)

  • Han, Seung-Ho;Kim, Jung-Kyu
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.21 no.10
    • /
    • pp.1694-1701
    • /
    • 1997
  • The residual safety assessment of steel structures, an important subject in practice, is given to much attention. Life prediction in the planning course of steel structures under fatigue loading is mainly based on fatigue design criteria resulting from S-N curves. But for any reason cracks have to be assumed due to fabrication failures or fatigue loading in service which can lead total fracture of structures. The life prediction can be carried out by means of fracture mechanics using Paris-Erdogan equation($da/dN=C {\cdot}{\Delta}K^m$). The paper presents results from charpy test to interpret transition behaviour of charpy energy($A_V$) in a wide temperature range and from constant-load-amplitude test to measure fatigue crack growth of various steels widely used in steel bridges since beginning of 20 centuries in Europe. In the normal service temperature range of steel bridges, the steel S355M shows higher maximum charpy energy($A_{Vmax}$) and lower transition temperature($T_{AVmax/2}$) than other steels considered. The C and m of Paris-Erdogan equation on the steels appear to be correlated, and to be affected by the R-ratios due to crack closure, especially at a low fatigue crack growth rate. Scanning electron microscopy analysis was carried out to interpret an influence of the crack closure effects on the correlation of C and m.

Monitoring and Risk Assessment of Pesticide Residues in Pre-harvest Fresh Ginseng (Panax ginseng C. A. Meyer) in Chungbuk Province in 2019 (충북지역 생산단계 수삼 중 잔류농약 모니터링 및 위해성 평가(2019))

  • Song, Tae Hwa;Lee, Young Wook;Youn, Taek Han;Park, Eun A;Shim, Eun Sun;Lee, Ju Hee;Kyung, Kee Sung
    • Korean Journal of Environmental Agriculture
    • /
    • v.40 no.2
    • /
    • pp.118-126
    • /
    • 2021
  • BACKGROUND: It is very important to monitor the residual characteristics of pesticides in pre-harvest fresh ginseng to ensure consumer safety. METHODS AND RESULTS: Forty-eight fresh ginseng samples were collected from 8 ginseng-growing fields 10 days before harvest and pesticide residues in fresh ginseng with and without rhizome (head of ginseng) and rhizome were analyzed for 320 pesticides by using GC-MS/MS and LC-MS/MS. As a result of the pesticide residue analysis, the number of pesticides detected from the fresh ginseng with rhizome, that without rhizome and rhizome were 26, 25, and 40, respectively, indicating that high number of pesticides found in rhizome, compared with the other parts. Pyraclostrobin was detected with the highest frequency in all samples, reaching to 21.2% in fresh ginseng with rhizome, 16.8% in that without rhizome, and 14.8% in rhizome. CONCLUSION: The residue levels of pesticides detected did not exceed their maximum residue limits, in spite of residual data in fresh ginseng before harvest. The amounts of the estimated daily intakes of all the detected pesticides were found to be from 0.018 to 1.818% of their acceptable daily intakes, indicating that concentrations of pesticides detected from fresh ginseng with and without rhizome collected before harvest do not pose the immediate health risks.

Persistence and Degradation Pattern of Acequinocyl and Its Metabolite, Hydroxyl-Acequinocyl and Fenpyroximate in Butterburs (Petasites japonicus Max.)

  • Leesun Kim;Geun-Hyoung Choi;Hyun Ho Noh;Hee-Dong Lee;Hak-won Lee;Kee Sung Kyung;Jin-Ho Ro
    • Korean Journal of Environmental Agriculture
    • /
    • v.42 no.2
    • /
    • pp.93-103
    • /
    • 2023
  • Persistence and degradation patterns of acequinocyl and its metabolite, hydroxyl-acequinocyl (acequinocyl-OH) and fenpyroximate in butterburs (Petasites japonicus Max.) were investigated after pesticide application. Butterburs, one of the minor crops in South Korea, was planted in two plots (plot A for double and plot B for single application) in a greenhouse. Butterburs samples were also planted in a separate plot without pesticide treatment, as the control. A commercial pesticide containing acequinocyl and fenpyroximate was applied to the foliage of butterburs at hourly intervals after dilution. Recoveries of acequinocyl and acequinocyl-OH were 78.6-84.7% and 83.7-95.5%, respectively; the relative standard deviation of the two compounds were less than 5%. The method limit of quantification was 0.01 mg/kg. The total (Ʃ) acequinocyl residues in butterburs reduced by 96.0% at 14 days and 75.9% at 7 days, in plot A and B, respectively, after final pesticide applications. The biological half-life (DT50) of Ʃ acequinocyl and fenpyroximate, calculated using the dissipation rate, was 3.0 days and 4.0 days, respectively. These data were used to set up maximum residue and safe standard levels when the pesticides are applied to control pests during butterbur cultivation. Risk assessment results showed that the maximum % acceptable daily intake was 7.74% for Ʃ acequinocyl and 0.16% for Ʃ fenpyroximate. The theoretical maximum daily intake of Ʃ acequinocyl and fenpyroximate was 26.3% and 35.8%, respectively. In conclusion, the concentrations of Ʃ acequinocyl and fenpyroximate in butterburs pose no significant health risks to Koreans.

A Study on the Modeling of PoF Estimation for Probabilistic Risk Assessment based on Bayesian Method (확률론적 위험도평가를 위한 베이지안 기반의 파손확률 추정 모델링 연구)

  • Kim, Keun Won;Shin, Dae Han;Choi, Joo-Ho;Shin, KiSu
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.41 no.8
    • /
    • pp.619-624
    • /
    • 2013
  • To predict the probabilistic service life, statistical factors should be included to consider the uncertainty of parameters. Generally the probabilistic analysis is one of the common methods to account the uncertainty of parameters on the structural failure. In order to apply probabilistic analysis on the deterministic life analysis, it would be necessary to introduce Probability of Failure(PoF) and conduct risk assessment. In this work, we have studied probabilistic risk assessment of aircraft structures by using PoF approach. To achieve this goal, the Bayesian method was utilized to model PoF estimation since this method is known as the proper method to express the uncertainty of parameters. A series of proof tests were also conducted in order to verify the result of PoF estimation. The results from this efforts showed that the PoF estimation model can calculate quantitatively the value of PoF. Furthermore effectiveness of risk assessment approach for the aircraft structures was also demonstrated.

Development of a Web-based Fatigue Life Evaluation System for Primary Components in a Nuclear Power Plant (원자력발전소 1 차 계통 주요기기에 대한 웹기반 피로수명평가 시스템 개발)

  • Seo, Hyong-Won;Lee, Sang-Min;Choi, Jae-Boong;Kim, Young-Jin;Choi, Sung-Nam;Jang, Ki-Sang;Hong, Sung-Yull
    • Proceedings of the KSME Conference
    • /
    • 2003.04a
    • /
    • pp.279-284
    • /
    • 2003
  • A nuclear power plant is composed of a number of primary components. Maintaining the integrity of these components is one of the most critical issues in nuclear industry. In order to maintain the integrity of these primary components, a complicated procedure is required including regular in-service inspection, failure assessment, fracture mechanics analysis, etc. Also, experts in different fields have to co-operate to resolve the integrity issues on the basis of inspection results. This integrity evaluation process usually takes long, and thus, is detrimental for the plant productivity. Therefore, an effective safety evaluation system is essential to manage the integrity issues on a nuclear power plant. In this paper, a web-based fatigue life evaluation system for primary components in nuclear power plant is proposed. This system provides engineering knowledge-based information and concurrent and collaborative working environment through internet, and thus, is expected to raise the efficiency of integrity evaluation procedures on primary components of a nuclear power plant.

  • PDF

Development of Fitness for Service Evaluation Programs (기간설비 사용적합성 평가 프로그램 개발)

  • Park, Young-Jae;Yun, Kang-Ok;Chang, Yoon-Suk;Kim, Young-Jin;Cho, Kyung-Shik
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.160-165
    • /
    • 2004
  • An effective integrity evaluation system is essential to manage the fitness for service issues on infra-structure because the evaluation processes usually take long times and are detrimental for productivity point of view. In this paper, the key structures and procedures of four integrity evaluation programs which have been developed based on currently available codes and standards are described. The proposed programs are not only flexible to adopt advances in fitness for purpose type assessment methodologies but also convenient for field engineers. The developed programs which will be unified as an integrity evaluation system are expected to play a prominent role for integrity evaluation of major infra-structure.

  • PDF

An Analysis on the Current Status of Maintenance System for Introducing the Asset Management System of Power Generation Companies (발전시설물의 자산관리체계 구축을 위한 전산시스템 개발)

  • Park, Jeonggwon;Yoon, Hyeongseok;Kim, Changhak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.41-49
    • /
    • 2021
  • Domestic maintenance strategies are shifting from safety assessment to performance assessment, and related systems and laws are being restructured to meet those criteria. In order to introduce asset management based on performance evaluation, related evaluation methods such as performance measures and level of service should be made to evaluate performance according to the characteristics of the structure, but these are not well-prepared in Korea. In this study, we present a computerized model and system for implementing asset management that introduces techniques such as performance evaluation, life cycle cost analysis, performance measures, and level of service in conjunction with existing maintenance and safety diagnosis procedures. The features of this system consist of three modules to enable separate operations of existing maintenance, safety management and asset management. The system is designed to be used as a reference for public institutions to introduce asset management in the future.