• 제목/요약/키워드: assembly works

검색결과 109건 처리시간 0.018초

A Fundamental Study for Creating 3D CG Animation of an Assembly Work

  • Yamanaka, Hiroki;Matsumoto, Toshiyuki;Shinoda, Shinji;Niwa, Akira
    • Industrial Engineering and Management Systems
    • /
    • 제11권2호
    • /
    • pp.188-195
    • /
    • 2012
  • This paper presents a new mode of expressing a 3D assembly work for creating a 3D CG animation without judgment by human from minimal required information. In the field of manufacturing, there are favorable movements in the utilization of 3D CAD for 3D simulation to shorten lead time for product development and pre-production. But simulating an assembly work has troubles to need huge quantity of manually input data. This paper discusses what minimal necessary information for creating 3D CG animations of assembly works is, focusing on the features of assembly works. Furthermore, a new mode of expressing a 3D assembly work is proposed as "state/change transition diagrams" (SCTD), which express arbitrary scenes in an assembly work as "state" and describe a sequential assembly work with "state" and "change", and the outline of its stepwise generation algorithm is also described. SCTD can be converted to a 3D CG animation of an assembly work without judgment by human. This paper focuses on the creating 3D CG animation of assembly works which workers use only their both hands.

쿠마 켄코의 건축에 나타나는 목재 접합방식에 관한 연구 (A Study on Wooden Assembly Methods Appeared in Kuma, Kengo's Works)

  • 엄희춘;백승연;박진호
    • 한국실내디자인학회논문집
    • /
    • 제24권4호
    • /
    • pp.14-22
    • /
    • 2015
  • This study deals with a comparative analysis of wooden assembly methods between Japanese traditional architecture and Kuma, Kengo's works. Kuma, Kengo has known as an architect who pursues Japanese architectural traditions with integrated solutions for built and natural environments, and expresses a deep commitment to unexpected use of materials such as stone and wood with the clarity of structural solutions. Accordingly, his architecture focuses on the appreciation of the spatial relationship with the surrounding, its local characters, and the selection of materials. This article first examines two of wooden assembly methods that have been shown in Japanese traditional architecture such as 'two-way system' and 'one-way system'. And then, Kuma, Kengo's wooden assembly methods in his works are analyzed and compared in relation to Japanese wooden assembly methods to find out similarities and differences between them. Then, it concludes that Kuma, Kengo's approach is not only relying on the methods of Japanese traditional architecture, but also exploring creative ways beyond traditional assembly methods.

2D 비전과 3D 동작인식을 결합한 하이브리드 실시간 모니터링 시스템 (Hybrid Real-time Monitoring System Using2D Vision and 3D Action Recognition)

  • 임종헌;성만규;이준재
    • 한국멀티미디어학회논문지
    • /
    • 제18권5호
    • /
    • pp.583-598
    • /
    • 2015
  • We need many assembly lines to produce industrial product such as automobiles that require a lot of composited parts. Big portion of such assembly line are still operated by manual works of human. Such manual works sometimes cause critical error that may produce artifacts. Also, once the assembly is completed, it is really hard to verify whether of not the product has some error. In this paper, for monitoring behaviors of manual human work in an assembly line automatically, we proposes a realtime hybrid monitoring system that combines 2D vision sensor tracking technique with 3D motion recognition sensors.

신경회로망기법에 의한 조립작업시간의 추정 및 라인밸런싱을 고려한 조립순서 추론 (On the Generation of Line Balanced Assembly Sequences Based on the Evaluation of Assembly Work Time Using Neural Network)

  • 신철균;조형석
    • 대한기계학회논문집
    • /
    • 제18권2호
    • /
    • pp.339-350
    • /
    • 1994
  • This paper presents a method for automatic generation of line balanced assembly sequences based on disassemblability and proposes a method of evaluating an assembly work time using neural networks. Since a line balancing problem in flexible assembly system requires a sophisticated planning method, reasoning about line balanced assembly sequences is an important field of concern for planning assembly lay-out. For the efficient inference of line balanced assembly sequences, many works have been reported on how to evaluate an assembly work time at each work station. However, most of them have some limitations in that they use cumbersome user query or approximated assembly work time data without considering assembly conditions. To overcome such criticism, this paper proposes a new approach to mathematically verify assembly conditions based on disassemblability. Based upon the results, we present a method of evaluating assembly work time using neural networks. The proposed method provides an effective means of solving the line balancing problem and gives a design guidance of planning assembly lay-out in flexible assembly application. An example study is given to illustrate the concepts and procedure of the proposed scheme.

조립라인의 밸런싱을 고려한 자동 조립 순서 추론 (Generation of Robotic Assembly Aequences with Consideration of Line Balancing Using a Simulated Annealing)

  • 홍대선;조형석
    • 제어로봇시스템학회논문지
    • /
    • 제1권2호
    • /
    • pp.112-118
    • /
    • 1995
  • In designing assembly lines, it is required that the lines should not only meet the demand of the product, but also minimize the assembly cost associated with the line. For such a purpose, numerous research efforts have been made on either the assembly sequence generation or the assembly line balancing. However, the works dealing with both the research problems have been seldom reported in literature. When assembly sequences are generated without consideration of line balancing, additional cost may be incurred, because the sequences may not guarantee the minimum number of workstations. Therefore, it is essential to consider line balancing in the generation of cost-effective assembly sequences. To incorporate the two research problems into one, this paper treats a single-model and deterministic (SMD) assembly line balancing (ALB) problem, and proposes a new method for generating line-balanced robotic assembly sequences by using a simulated annealing. In this method, an energy function is derived in consideration of the satisfaction of assembly constraints, and the minimization of both the assembly cost and the idle time. Then, the energy function is iteratively minimized and occasionally perturbed by the simulated annealing. When no further change in energy occurs, an assembly sequence with consideration of line balancing is finally found. To show the effectiveness of the proposed scheme, a case study for an electrical relay is presented.

  • PDF

Shaping and assembly of structural systems of pocket foundations with prefabricated columns

  • Grzegorz Ludwik Golewski
    • Structural Engineering and Mechanics
    • /
    • 제92권3호
    • /
    • pp.307-317
    • /
    • 2024
  • Pocket foundations are usually used under precast RC columns of steel or RC flyovers and industrial halls. Pocket foundations is a specific type of foundation in which, apart from standard calculations concerning the fulfilment of the limit states in the base of the footing, the problems related to the appropriate design of its walls in the pocket are also important. The aim of the article is, therefore, to draw attention to the specificity of pocket foundation design-which are part of the structural systems in the hall buildings-and to present the main problems that may arise during their construction at individual stages, including guidelines for checking the correctness of the conducted assembly works. The following article describes the main requirements for the construction of pocket foundations with particular attention to the type of surface present inside the pocket. The main problems related to the pocket foundations construction are also presented and the methodology of assembling the precast columns in the footings is described. In the manuscript, it was also discussed how to check and control the correctness of the skeleton installation works in hall buildings in order to prevent too large deviations in the assembled structure.

수정 BOM 을 이용한 조립제품의 표준시간 산출 (Determining Standard Times of Assembly Products using A Modified BOM)

  • 엄광용;이문규
    • 산업공학
    • /
    • 제11권3호
    • /
    • pp.103-114
    • /
    • 1998
  • This paper suggests a computer software system which generates standard times for assembly products. The system called "computer aided logical system for standard times(CALS4ST)" incorporates a modified bill of materials, BOM4ST(BOM for standard time) to deal with auxiliary operations which are not directly related to parts and assemblies listed in the standard BOM. Typical examples of the operations include inspection, adjustment, and repairing works to be done before or after assembly operations. Once standard time data bases for both the part assembly operations and the auxiliary operations are set up, the system relates the BOM4ST to the standard time data bases so as to calculate the standard time for a assembly part concerned. According to the structure of parts and auxiliary operations in the BOM4ST, their standard times stored in the data bases are to be sequentially added up considering the specified assembly-operation characteristics. To illustrate the feasibility of the system, the case study of L company is provided.

  • PDF

가정배달 노인급식서비스 작업공정관리 모형개발을 위한 PERT-Type System의 적용 (Application of a PERT-Type System on Work Management in Home-Delivered Meals Service Program for Elderly)

  • 양일선;채인숙;유일근
    • Journal of Nutrition and Health
    • /
    • 제34권6호
    • /
    • pp.701-714
    • /
    • 2001
  • The purpose of this study was to apply a PERT-type system, a combination of the project evaluation and review technique(PERT) and critical path method(CPM) on the employees' work time management of flood preparation, assembly, transportation and cleaning in home-delivered meals program for elderly The resources allotment heuristic program was developed by considering the number of employees and cooking utilities, being limited resources of home- delivered meals program. This program could assign the employees to perform the works included in flood preparation, assembly, transportation ind cleaning. Critical path and activities ware identified by PERT-type system on the basic of work time investigation in five senior centers. Work sheets were invented to perform the work by the shortest path with flexible employees'maximum flow As a result of the work time investigation, the most prevalent activities were ones of preparation in center C and E. Besides, the preparation(over fifty percent) was the most proportion among flood preparation, assembly, transportation and cleaning in center C and E. Critical path and activities of 'C'center were cucumber in sauce preparation path and assembly, wrapping in assembly path and case delivery in transportation path. Critical path and activities of 'E'center were Pan-fried Potato Preparation Path and assembly, case covering, wrapping in assembly Path. The work sheet invented by the heuristic program and PERT-type system reduced the work completion time and man hours in both centers.

  • PDF

양면 조립라인 밸런싱을 위한 할당규칙 (An Assignment Rule for Balancing Two-sided Assembly Lines)

  • 이태옥;김여근
    • 산업공학
    • /
    • 제10권2호
    • /
    • pp.29-40
    • /
    • 1997
  • This paper considers two-sided (left and right side) assembly lines which are often used, especially in assembling large-sized products such as trucks and buses. A large number of exact algorithms and heuristics have been proposed to balance one-sided lines. However, little attention has been paid to balancing two-sided assembly lines. This paper presents an efficient assignment rule for balancing two-sided assembly lines. The rule involves maximizing relatedness and slackness between works. We first investigate the characteristics of two-sided line balancing and devise new measures for the balancing. We in this rule assign workstations a set of tasks rather than an unit task at a time. a priority rule of assigning the sets is proposed. Extensive computational experiments are carried out to make the performance comparison between the proposed rule and existing ones. The computational results show that our rule is promising in solution quality.

  • PDF