• Title/Summary/Keyword: assembling

Search Result 690, Processing Time 0.024 seconds

Applicability estimation for cable assembling method of shield tunnel using field test construction (현장 조립 시험시공을 통한 쉴드터널 강연선 체결 기술의 적용성 평가)

  • Kim, Dong-Min;Ma, Sang-Joon;Lee, Young-Sub
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.1
    • /
    • pp.11-23
    • /
    • 2015
  • In this study, the new segment assembling method using cable tensible force was developed to improve the problem of bolt assembling method of shield tunnel. In the field test construction, cable assembling method reduced the assembling time of segment in comparison with bolt assembling method because of guide role of segment shear-key. In the result of measuring the necessary time for segment assembling process, it took 420sec to assemble one segment in bolt method and 400sec to assemble one segment in cable method, but in case of using the cable automatic feeder, it could reduce the necessary time as 60sec in comparison with bolt assembling method. The cable automatic system modeling using BIM, that connected shield TBM also will be utilized in the area of design TBM, excavation plan, method process understanding, construction management and so on.

Effect on the Compliance of Spindle -Bearing System by the Assembling Tolerance (축-베어링계의 컴플라이언스 특성에 미치는 조립공차의 영향)

  • 이강재;서장력;이선규
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1995.10a
    • /
    • pp.995-999
    • /
    • 1995
  • In spindle-bearing system, the displacement characteristics of the bearing by the load applied on the spindle are affected greatly by the assembling tolerance between the spindle and housing assembled to support the bearing. Also in spindle system of rotational operation, the compliance characteristic of the bearing is expected to be varied frequently by the thermal deformation of the spindle and the housing. To predict the thermal deformation of the spindle including heat generation of the bearing, we need to examine the effect on the compliance of spindle-bearing system by the assembling tolerance. In this paper, we proposed the load-displacement relation expression considering the effect which the variation of contact pressure due to the radial directional assembling tolerance between the bearing and the housing influences on the axial and radial directional displacement characteristics of the bearing. Furthermore, for several assembling systems of bearings and housings having all different assembling tolerances, we proposed a method to predict exactly the variation of the bearing preload which is sensitive to the thermal deformation by showing the propriety with experimental results.

  • PDF

A FEASIBILITY STUDY ON THE NUMERICAL PRE-ASSEMBLY SIMULATION USING 3D LASER SCANNING MEASUREMENT

  • Kyoungmin Kim ;Seok Kim ;Chan-Hyuk Park ;Kyong Ju Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1193-1198
    • /
    • 2005
  • The pre-assembly takes a large portion of the fabrication cost of steel bridges. In order to save the fabrication cost through the improvement of the conventional pre-assembling process, this research investigates a numerical pre-assembly simulation as an alternative to current pre-assembling process. The 3D laser scanning was utilized in site and measuring data for steel box were analyzed. The productivity of pre-assembly simulation system is compared with the conventional pre-assembling system. This paper identifies feasibility on the alternative pre-assembling process and then proposes the scheme of the pre-assembly simulation system development satisfying the current pre-assembly inspection of standards.

  • PDF

Depth Evaluation from Pattern Projection Optimized for Automated Electronics Assembling Robots

  • Park, Jong-Rul;Cho, Jun Dong
    • IEIE Transactions on Smart Processing and Computing
    • /
    • v.3 no.4
    • /
    • pp.195-204
    • /
    • 2014
  • This paper presents the depth evaluation for object detection by automated assembling robots. Pattern distortion analysis from a structured light system identifies an object with the greatest depth from its background. An automated assembling robot should prior select and pick an object with the greatest depth to reduce the physical harm during the picking action of the robot arm. Object detection is then combined with a depth evaluation to provide contour, showing the edges of an object with the greatest depth. The contour provides shape information to an automated assembling robot, which equips the laser based proxy sensor, for picking up and placing an object in the intended place. The depth evaluation process using structured light for an automated electronics assembling robot is accelerated for an image frame to be used for computation using the simplest experimental set, which consists of a single camera and projector. The experiments for the depth evaluation process required 31 ms to 32 ms, which were optimized for the robot vision system that equips a 30-frames-per-second camera.

The Influence of Assembling Errors on the Performance of the Rotor Supported by Active Magnetic Bearings (조립오차가 능동 자기베어링으로 지지된 축의 성능에 미치는 영향)

  • Kim, Dae-Gon;Kim, Kyung-Woong
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.20 no.12
    • /
    • pp.3909-3916
    • /
    • 1996
  • Magnetic bearing is the machine element that supports the shaft without mechanical contact using the magnetic force induced by permanent magnet of electromagnet. Active magnetic bearing system is composed of sensor, controller, power amplifier, and electromagnet. If all the elements were dieal, shaft position could be controlled to sensor resolution, Because each elements inreal system have mechanical and electricla losses and nonlinearity, it is impossible to attain the desired performance using general control algorithm. So far it has been studied on improvement of the control algorithm of the electric characteristics of each elements. Another factors to affect shaft behavior are the manufacturing errors due to machine work, and assembling errors due to accumulate manufacturing errors of the radial magnetic bearing. This paper describes that the shaft behavior due to accumulate manufacturing errors and asymmetric bolting. This paper describes that the shaft behavior due to assembling errors of the radial bearings donot affect the rotaitonal accuracy of the shaft. But when the amplitude of the assembling errors increasees over the certain value, the bearing can not support the shaft properly.

Systematic review of self-assembling peptides as topical agents for treatment and prevention of gastrointestinal bleeding

  • Andrei Voiosu;Monica State;Victor Dragan;Sergiu Vaduva;Paul Balanescu;Radu Bogdan Mateescu;Theodor Voiosu
    • Clinical Endoscopy
    • /
    • v.57 no.4
    • /
    • pp.454-465
    • /
    • 2024
  • Background/Aims: Gastrointestinal bleeding is a significant and potentially lethal event. We aimed to review the efficiency and safety of self-assembling peptides for the treatment and prevention of gastrointestinal tract bleeding. Methods: We conducted a systematic search for studies describing the endoscopic use of self-assembling peptides for treatment or prevention of bleeding in the gastrointestinal tract in a parallel, independent fashion. The primary outcomes were rates of successful initial hemostasis, delayed bleeding, and rebleeding. The secondary outcomes were adverse events and ease and volume of gel used. Results: Seventeen studies were analyzed. Overall success rate of self-assembling peptides in gastrointestinal bleeding was 87.7% (38%-100%), regardless of etiology or associated treatments. Rebleeding rate ranged from 0% to 16.2%, with a mean of 4.7%, and overall delayed bleeding rate was 5% (range, 0%-15.9%). Only three adverse events were reported in a pooled number of 815 patients. The volume of gel used varied (0.43 to 3.7 mL) according to indication and type of bleeding. Conclusions: The limited available data on the use of self-assembling peptides in gastrointestinal endoscopy suggest a high efficiency and good safety profile.

A Study on the Enablers and Barriers of BIM-based Assembling Collaboration for Designers' Communication and Socio-Psychological Mechanisms (BIM기반의 어셈블링 협업이 설계자 간의 의사교환과 사회심리학적 기제에 미치는 효과와 한계에 관한 연구)

  • Hong, Seung-Wan;Jeong, Yongwook
    • Journal of KIBIM
    • /
    • v.7 no.1
    • /
    • pp.36-44
    • /
    • 2017
  • While previous studies argue that BIM-based assembling collaboration promotes the communication and process management among participants in architectural design projects, it is still unknown which communication and socio-psychological factors are more and less activated in use of BIM-based collaboration. To investigate this research aim, in authentic BIM-used architectural retrofitting projects, the participants (N=36) collaborated and assessed the communication factors on (1) perceiving design results, (2)understanding partners'design intention, (3) proposing and converging opinions, the interpersonal design process management factors on (1) managing design process, (2) managing collaboration schedule, and the complementedness factors on (1) understanding partners' expertise, and comradeship. Statistical analyses reveal that the factor relevant to perceiving design results is better activated than the other factors (p<0.05), but all other factors are not much activated compared to perceiving design results. Deduced from the previous BIM studies and interviews, a reason roots in the shared forms and semantics of BIM. The shared semantics represent collaborators' information and allow the participants to perceive design changes explicitly. Meanwhile, BIM-based assembling collaboration is limited to represent observable, experience-able processes of design, and thus, several key socio-psychological factors, such as proposing and converging opinions and managing design process, are less activated.

A Study on Shield Tunnel Assembling System Using a Cable and Island-Type Shear Key (강연선과 아일랜드타입 전단키를 이용한 쉴드터널 체결기술 연구)

  • Ma, Sang-Joon;Lee, Young-Sub;Kim, Dong-Min
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.3
    • /
    • pp.17-25
    • /
    • 2015
  • In this study, a new segment assembling method using cable tensible force and island-type shear key was developed to improve the problems of bolt assembling method of shield tunnel. The bolting system and island-type shear key system were compared to analyze the mechanical behavior that occurs in the segment. The study results obtained from structural investigation and numerical analysis technique showed that the shear strength of island-type shear key is higher than that of the bolt system. With the increase of the tensile strength, it is expected that the stability of the segment will be secured.

Implementation of Concurrent Engineering for Large Assembly Design: Part(II) -Developmen of a Digital Mock-Up System for Reducin Design Changes- (부품수가 많은 조립체 설계를 위한 동시공학의 구현: Part (II) -설계 변경을 줄이기 위한 Digital Mocj-Up 시스템의 개발-)

  • 정융호
    • Korean Journal of Computational Design and Engineering
    • /
    • v.2 no.2
    • /
    • pp.103-110
    • /
    • 1997
  • In the development of large complex assembly, most design changes are from the following reasons.: 1) insufficient consideration of assembling sequence of downstream process. 2) interference and fit-up of related parts. 3) initial design changes which are not completely resolved. In order to reduce the first reason of above, the assembly-centric modeling methodology was proposed in the part (1) of the thesis. In this part (2), a Digital Mock-Up system, which is a tool to build a virtual mock-up in design stage, has been developed in order to prevent the other two reasons. The system can build a virtual assembly in various ways as followings.: 1) assembling parts which are located in user defined envelope. 2) assembling parts with the specified disciplines. 3) assembling parts that are selected in the part list. It can also make an assembly by the combination of above methods. In addition to that, it has the functions to read/write the virtual assembly and to explode parts of the assembly in desired direction. With the virtual assembly, engineers can design interference free parts without making physical mock-up. The system has been implemented with Oracle database management system in CATIA environment.

  • PDF

A Study on Maintainability Improvement for Underwater Weapon Training Vehicle (수중무기 훈련탄의 정비성 향상방안 연구)

  • Jeong, Jinseob
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.16 no.2
    • /
    • pp.111-117
    • /
    • 2013
  • In this paper, we have proposed novel technique to improve maintainability for training vehicle of underwater weapon system. In case of under water weapon, the fire procedure is related with operation of expulsion system in submarines. So the submarine crews should practice the complex fire procedure of weapon system by using training vehicle, which is safer and cheaper than operational weapon. After emitted from submarine, the training vehicle rise to the surface and should be withdrawn from the sea. The recovered training vehicle is transported to maintenance depot and pass through the recycling procedure including disassembling the vehicle, data acquisition & analysis, battery charge, replacing expandable components, testing the captive equipment, and assembling the vehicle. The disassembling & assembling of training vehicle which is composed of watertight section or airframe, is time-consuming work. So in this paper, we have studied the elements of recycling procedure and propose the method to exclude the assembling & disassembling work for maintainability improvement.