• 제목/요약/키워드: architectural unit

검색결과 602건 처리시간 0.025초

가변적 평면이 가능한 컨테이너 모듈형 조립식 공동주택의 건축계획 (Variable apartment building planning by using combinable container house module)

  • 조태흠;진경일
    • KIEAE Journal
    • /
    • 제17권4호
    • /
    • pp.95-100
    • /
    • 2017
  • Purpose: Now a day, Most of the residential house in Korea consists of apartment buildings. However, in the case of old apartment buildings, dwelling environment condition depends on management effort by residents. But we can't rebuild or restructure only old single dwelling unit in apartment buildings. And we can't move every single dwelling unit in the apartment building. Therefore, this study suggests a prototype of combinable container dwelling module apartment. Method: The method of research is exploring the case of previously constructed containers. Based on the case, This study suggests prototypes to create a variable apartment design with dwelling container units. Based on the prototype, various combinations are proposed to produce various types of dwelling space. Finally, this study makes an example plan for the apartment by using the container unit modules. Results: This study suggests combinable container apartment building prototypes. And it may be a fundamental study of changing the apartment building concept.

도로 주행 시험을 통한 모듈러 유닛의 진동 특성 분석 (Analysis of Vibration Characteristics of Modular Unit by Road Test)

  • 곽명근;백정훈;설욱제
    • 대한건축학회논문집:계획계
    • /
    • 제35권1호
    • /
    • pp.29-35
    • /
    • 2019
  • The unit modular system is a type of prefabricated construction method that completes the building by uniting the modular units on site by transporting the unit module structure manufactured in the factory to the site. Since the unit module structure is not only the frame but also the finished form including the inner and outer materials, it is most likely to be brought into the field. Therefore, not only the damage of the inner and outer materials but also deformation of frame structure due to the vibration generated during the transportation of the vehicle, And it is necessary to take appropriate methods when transporting the module structure. However, there are no methods to prevent modular structure damage due to vehicle vibration in domestic and foreign modular transportation guidelines or standards. In this study, we investigate the vibrations during the vehicle transportation of the module structure through the road driving test, identify the vibration frequency characteristics of the vehicle through FFT analysis, and propose a vibration reduction methods for module transportation.

노후 공동주택 리모델링 계획안 거주민 선호도 연구 (A Study on the Residents' Preference on Apartment Remodeling Proposals)

  • 최재필;최준호;백수연;염수
    • 대한건축학회논문집:계획계
    • /
    • 제35권6호
    • /
    • pp.13-20
    • /
    • 2019
  • This study analyzes the residents' preference of apartment unit remodeling proposals for the 3-bay old apartments built in the 1st phase New Town. The remodeling unit plans were previously developed for a 3-bay large-sized unit plan (over 85m2) and a 3-bay medium-sized unit plan (60~85m2). Surveys and interview were conducted with the residnets of the two apartment complexes in Bundang. The contents of the questionnaire consisted of the preferred plan, the reason for the preference, the improvement factors, etc. A total of 88 questionnaires were received. It was found that two-thirds of respondents favored the general 3LDK format, where living rooms and kitchens were located in the middle of the front and rear bay. The one-third of the respondents favored a plan combining the living room and the kitchen in the front. It was also found that the limitation of the remodeling unit plan caused by the location of existing bearing walls should be carefully considered, and that many residents asked additional storage space.

Expansion ratio estimation of expandable foam grout using unit weight

  • WooJin Han;Jong-Sub Lee;Thomas H.-K. Kang;Jongchan Kim
    • Computers and Concrete
    • /
    • 제33권4호
    • /
    • pp.471-479
    • /
    • 2024
  • In urban areas, appropriate backfilling design is necessary to prevent surface subsidence and subsurface cavities after excavation. Expandable foam grout (EFG), a mixture of cement, water, and an admixture, can be used for cavity filling because of its high flowability and volume expansion. EFG volume expansion induces a porous structure that can be quantified by the entrapped air content. This study observed the unit weight variations in the EFG before and after expansion depending on the various admixture-cement and water-cement ratios. Subsequently, the air content before and after expansion and the gravimetric expansion ratios were estimated from the measured unit weights. The air content before expansion linearly increased with an increase in the admixture-cement ratio, resulting in a decrease in the unit weight. The air content after the expansion and the expansion ratio increased nonlinearly, and the curves stabilized at a relatively high admixture-cement ratio. In particular, a reduced water-cement ratio limits the air content generation and expansion ratio, primarily because of the short setting time, even at a high admixture-cement ratio. Based on the results, the relationship between the maximum expansion ratio of EFG and the mixture ingredients (water-cement and admixture-cement ratios) was introduced.

The Integrated Design Optimization Technique for Spatial Structures

  • Lee, Sang-Jin
    • Architectural research
    • /
    • 제14권1호
    • /
    • pp.19-26
    • /
    • 2012
  • The technique of integrated design optimization is proposed to design spatial structures. Various element technologies such as topology optimization, layout editing and size optimization processes are used in an integrated manner to improve the performance of spatial structures. In order to demonstrate the present technique, a unit spatial structure is optimized and numerical results are described here.

1950년대 싱가포르 공공주택에서 오픈 스페이스의 다양화와 근린의 형성에 관한 연구 (A Study on Diversification of Open Space and Formation of Neighborhood at the Singapore Public Housing in 1950s)

  • 우동선;탁충석
    • 건축역사연구
    • /
    • 제24권4호
    • /
    • pp.19-28
    • /
    • 2015
  • This study examines the Singapore public housing supplied by Singapore Improvement Trust (SIT) in the 1950s. Focused on the Princess Elizabeth estate and Princess estate of Queenstown, this study surveys their construction backgrounds, site plans, unit plans, architectural designs and meanings. The Princess Elizabeth estate was the model estate for workmen's flats. This estate showed mixed blocks of flats arranged around a large quadrangled open space for children. The Princess estate was a neighborhood of Queenstown, Singapore's the first new town. At this Estate, there were some new architectural occurrences departing from the Tiong Bahru Estate. Those are the appearance of high-rise typology, and the increased specificity in the functions of open spaces. Thus the open space became to get hierarchy, and divided an estate to small neighborhood units. For the SIT, open space is synonymous with the improvement of urban environment. Through the purposeful creation of open space, the SIT intended to solve the problem of sanitation and to make a neighborhood unit which can be pleasant place for regional community.

Operation Results and Utility of Dynamic Pricing Response Control-Applied VRF System in Summer Season

  • Kim, Min-seok;Lee, Je-hyeon;Song, Young-hak
    • Architectural research
    • /
    • 제19권3호
    • /
    • pp.71-77
    • /
    • 2017
  • Dynamic pricing refers to a system in which a tariff varies, according to a level of charging and applied time depending on time change. The power billing system used in the Korean Electric Power Corporation (KEPCO) is based on time of use (TOU) pricing, which is one of the dynamic pricing systems. This paper aimed to determine the operational results of a variable refrigerant flow system, to which a new control algorithm was applied, in order to respond to dynamic pricing, in summer and the utility of the new control. To do this, real measured data was acquired from a VRF system installed in a building for educational purposes, where dynamic pricing was applied for about 100 days during summer time. At the maximum load operation time period in TOU, the new control minimized operation within the indoor comfort range, an increase in refrigerant evaporation temperature in the indoor unit and the number of revolutions in a compressor in the outdoor unit was limited. As a result, power usage was decreased by 11%, and the operational cost by 14.6%. Furthermore, measurement results using the Predicted Mean Vote (PMV) model, that represented satisfaction of thermal environment, showed that 82.8% to 90.4% of the occupants of the building were satisfied during operation when the new control was applied.

지역거점 공공병원 병동부의 시설기준 변화와 건축계획 개선에 관한 연구 (A Study on the Changes of Facility Guidelines and Improvement of Architectural Planning on the Wards in the Public District General Hospitals)

  • 김기연;최광석
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제24권3호
    • /
    • pp.7-15
    • /
    • 2018
  • Purpose: The purpose of this study is to suggest the improvement of the architectural planning of public hospitals by analyzing the contents of the architectural planning and the trend of the recent ward planning. Methods: The study method was the drawing analysis of the wards in the public hospitals where facilities were improved including the ward-related literature survey. The scope of the study was the general wards. Results: As a result of the study, the area composition of the ward area, the number of beds per nursing unit, the floorplan types, and the unit space planning which is included the room composition, the room size, the bed clearance areas, and the improvements of the nursing space were suggested. Implications: The result of this research would be useful as a reference to design nurse area in the wards.

수직면 일사량을 고려한 초고층 건축물 적용 Unit형 BIPV 설계 방안에 관한 연구 (A Study on the Unit Type BIPV Design Method for Super-Tall Building Concentrating on the Solar Irradiance Incident on the Building Facades)

  • 류춘덕;서영석;오민석;김회서
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2011년도 추계학술발표대회 논문집
    • /
    • pp.370-375
    • /
    • 2011
  • BIPV시스템 분야는 다른 PV 적용 기술 분야에 비해 빠르게 성장하고 있으나 소형 건축물 위주로 적용되었으며, 초고층 건축물과 같이 수직적으로 높은 건축물의 외부환경조건에 대응하기 위한 BIPV의 적용 방안은 현재까지 연구되어지지 않았다. 국내의 경우 선진국에 비해 초고층 건축물에 대한 BIPV시스템 적용기술은 아직 초기 연구단계에 불과하다. 초고층 건축물의 고유의 특징을 고려하여 초고층 건축물 파사드에 입사하는 일사량의 분포가 균일하지 않을 것이라고 예측하고 실측을 진행하였으며, 실측 결과의 분석을 통하여 초고층 건축물에서의 BIPV시스템 최적 설계방안을 제시하였다. 결론적으로 본 연구에서는 초고층 건축물의 외벽에 입사하는 일사량을 고려한 Unit형 BIPV설계 방안을 제시하였으며, 특히, 측정된 일사량 데이터를 활용하여 초고층 건축물에 적합한 인버터의 선정의 대안을 제시하였다.

  • PDF

DEVELOPMENT OF A WEB-BASED COST AND DURATION MANAGEMENT SYSTEM FOR MEGA-PROJECTS

  • Chang-Taek Hyun;Run-Zhi Jin;Myoung-Jin Son;Seung-Yoon Shin
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.510-515
    • /
    • 2011
  • Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.

  • PDF