• Title/Summary/Keyword: architectural plan

Search Result 1,163, Processing Time 0.027 seconds

A Plan for Establishing IOT-based Building Maintenance Platform (S-LCC): Focusing a Concept Model on the Function Configuration and Practical Use of Measurement Data (IOT 기반 건축물 유지관리 플랫폼 구축(S-LCC) 방안 : 기능구성과 계측 데이터 활용을 위한 개념 모델을 중심으로)

  • Park, Tae-Keun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.2
    • /
    • pp.611-618
    • /
    • 2020
  • The reliability of the results of LCC analysis is determined by accurate analytical procedures and energy data from which the uncertainty is removed. Until now, systems that can automatically measure these energy data and produce databases have not been commercialized. Therefore this paper proposes a concept model of an S-LCC platform that can automatically collect and analyze electric energy consumption data of equipment systems using the IOT, which is the core tool in the Fourth Industrial Revolution and operates the equipment system efficiently using the analyzed results. The proposed concept model was developed by the convergence of existing BLCS and IOT and was comprised of five modules: Facility Control Module, LCC Analysis Module, Energy Consumption Control Module, Efficiency Analysis Module, and Maintenance Standard Reestablishment Module. Using the results of LCC analysis deduced from this system, the deterioration condition of an equipment system can be identified in real-time. The results can be used as the baseline data to re-establish standards for the maintenance factor, replacement frequency, and lifetime of existing equipment, and establish new maintenance standards for new equipment. If the S-LCC platform is established, it would increase the reliability of LCC analysis, reduce the labor force for entering data and improve accuracy, and would also change disregarded data into big data with high potential.

A Study on Applying Information Framework for BIM Based WBS -Focusing on Civil Construction- (BIM기반의 WBS 구축을 위한 정보프레임워크 도입방안 연구 -토목사업의 적용을 중심으로-)

  • Nam, Jeong-Yong;Jo, Chan-Won;Park, So-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.770-777
    • /
    • 2017
  • Building information modeling (BIM) has been receiving attention as an integrated information model instead of CAD since the 2000s. BIM technology was first used in the architectural field and was later introduced to the civil engineering field. However, the government announced a plan for the application of BIM to 20% of all SOC projects from 2020, so the adoption of BIM technology is expected to accelerate. In order to successfully adopt BIM, a systematic structure should be supported for integrated design information and implementation technology. Also, it is important to establish the relationship between information systems because many complicated factors are intertwined in the construction industry. In this study, we propose a framework for constructing integrated information through identifying the information relations for introducing BIM in the civil engineering industry. We applied this framework to a bridge project to confirm its effectiveness. This study can be applied to the integrated management of the construction process and costs by introduction of a work breakdown structure (WBS) to BIM. In addition, this study is expected to contribute to the adoption of BIM in the civil engineering field through the proposal of information system standardization in this field.

Present Condition of Theft Loss at Construction Sites and a Situation Analysis of Prevention Measures (건설현장 절도 피해실태와 예방대책의 현황분석)

  • Jang, Dong Hyeok;Kim, Han Soo;Nguyen, Tan Khoa;Jung, Sung Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.64-73
    • /
    • 2015
  • The theft of construction equipments and materials at construction sites is one of the risk factors that may affect to the productivity as well as the progress of the project. However, managers of the construction site have paid little attention to the security measure, therefore the theft loss at construction sites has been occurred repeatedly every year. In this study the situation analysis has been carried out for the present condition of theft loss of construction equipments and materials as well as its prevention measure based on the questionnaire survey targeting field managers, experienced theft loss at the site, as a part of base study to set up a security measure of construction sites. The main content of this study is analyzing characteristics of theft loss and the degree of impact and risk by it at construction sites, then reviewing the direction of the prevention plan establishment for the future through the analysis of the importance and utilization level of prevention measures. The result of this study would give an opportunity to create an awareness against the theft loss at construction sites as well as can be utilized as a basic survey for the systematic development of concerned prevention measures.

A Study of the Establishment of Framework for Information Exchange based on IFC Model in Domestic Collaborative Design Environment (국내 협업 설계 환경에서의 IFC기반 정보 교환 프레임워크 구축에 관한 연구)

  • Shin, Joonghwan;Kwon, Soonwook;Lee, Kyuhyup;Choi, Sangduck;Kim, Jinman
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.24-34
    • /
    • 2015
  • As recent multilateral collaboration design system has been advanced, BIM based data exchange is a key factor for successful next generation building project. Even though many studies have been trying to set up a data compatibility system for collaboration, There are still a lot of problem in data exchange between design and engineering phase. Therefore, In this study, we analysis causes of problem for information exchange and suggest a IFC based Information exchange framework for improving BIM based design collaboration environment. In order to find out problems that hinder establishment of advanced open BIM information exchange, proper analysis about transition of process from current and to-be BIM based design collaboration process is important, at first. From analysis of main obstacles to information exchange, this research suggests solution plan using open API and IFC based BIM collaboration supporting system. The suggested open API solution named Integrity feedback system perform a role making up for weak point derived from IFC based data exchange. And main system suggestion about framework for IFC based information exchange reflect technological system support, requirement of function for collaboration including API/BCF plug-in.

Recycle Possibility of the Stone-Dust in Quarry as Subbase Layer Materials of the Road (도로 보조기층재로서 채석장 석분토의 재활용가능성 분석)

  • Kim, Kyeong-Su;Song, Young-Suk
    • The Journal of Engineering Geology
    • /
    • v.17 no.2 s.52
    • /
    • pp.279-287
    • /
    • 2007
  • An ore of stone obtained from quarry lose its about 60% such as the muck and the stone-dust during the process of making the architectural block, the crushed aggregate and so on. A part of the muck is only reutilized for the crushed aggregate as road pavement materials, while the most of the muck in the shape of powder is mixed with water and then it is deposited in a sludge tank. The muck in the shape of powder is called the stone-dust. If the stone-dust is discharged and sprayed, an ecosystem will have terrible damage because the seepage of surface water, the flow of ground water and the movement of air are not occurred smoothly by packing the void of soils. As the Waste Management Law (2003) in Korea, the stone-dust is sorted out the industrial waste and the most of that is dumped in ground. Therefore, the establishments of an efficient recycling plan are necessary through the improvement of engineering properties of the stone-dust. To investigate the possibility of recycle and improvement for the stone-dust, the stone-dust and natural soils are sampled from six quarries in Korea. The various soil tests are performed by use of the mixed soils with the stone-dust content ratio. As the result of various soil tests, the recycle possibility of the stone-dust is analyzed as subbase layer materials of the roads.

The Significance of Independence Park in Korean Landscape Architectural History (독립공원의 조경사적 의의)

  • Lee, Yoo-Jick
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.36 no.1
    • /
    • pp.103-115
    • /
    • 2008
  • This paper investigates the historical significance of Independence Park in Korean landscape architecture by examining the idea and goal, master plan and scheme, and meaning and limitation of the park The construction was announced in July and began with the Independence Arch in the middle of September, 1896. Dr. Philip Jaisohn (Suh Jai-Pil), Counselor of The Privy Office and president of the Independence newspaper, played an important role in park construction. He formally advised the arrangements and general planning of the park, but he actually played a leading role in the park as much as he designed and superintended the erection of the arch. He had the conception of a productive park for cultivating and experimenting with a variety of trees surrounding the monument. In terms of the history of Korean landscape architecture, Independence Park is important in that it is the first modem city park that was tried independently as part of the modernizing-Seoul project and the only park of which object and scheme were revealed. It also strengthens the roots of Korean modem landscape architecture by pushing Korean history of public parks into the prior time to Japanese colonial period and enriches the contents of Korean modem landscape architecture. Independence Park is the original realization of a public park because it was constructed with participation and donations from the planning stage to the construction and use. In addition, it is the goal and means to inspire the spirit of national independence and patriotism in Korean people and lead them to voluntary awakening, enlightenment, and participation. Independence Park, however, was not constructed according to Dr. Jaisohn's original intent due to the lack of funds and the rudimentary level of landscape construction technology. In addition, the location was too far from downtown and accessibility was very difficult. For these reasons, many do not consider the park as having been constructed. However, this kind of view must be changed. Other parks of the time were not detailed and decorated like typical western parks, but were left as public spaces. In other words, these parks should not be judged by comparing them to western parks. This is the same concept as that of the first parks of modem Korea being called 'park land.' These parks were more natural environments than planned gardens.

A Study on the Improving Speech Intelligibility of Emergency Broadcast Equipment in the Apartments (공동주택 내 비상방송설비의 음성명료도 실태 분석 및 재실자 인지성 개선방안 연구)

  • Oh, So-Young;Cho, Hyun-Min;Lee, Young-Ju;Lee, Min-Joo;Yoon, Myung-Oh
    • Fire Science and Engineering
    • /
    • v.32 no.4
    • /
    • pp.60-68
    • /
    • 2018
  • Due to the complicated plan structure of the apartment units and the improved room-to-room sound insulation performance, it is difficult to communicate and recognize the fire situation by emergency broadcast equipment. In this study, speech intelligibility was measured and analyzed for three types of apartment unit by emergency broadcast equipment on various measurement points. Simulations were also conducted to improve the speech intelligibility. As a result of field measurements 72, 84, and 101 Type were not satisfied with NFSC standard of 90 dBA at the point of 1 m distance from source. In addition, it was evaluated that 75 dBA and CIS 0.7 of NFPA standard was not satisfied at all measurement points except for the 72 Type at living room point with door opened condition. Based on the door opened condition of the bedroom, it satisfied the NFPA of 75 dBA and CIS 0.7 in each bedroom when more than 90 dBA was satisfied at the 1 m separation point provided in NFSC standard.

Optimization of Water Reuse System under Uncertainty (불확실성을 고려한 하수처리수 재이용 관로의 최적화)

  • Chung, Gun-Hui;Kim, Tae-Woong;Lee, Jeong-Ho;Kim, Joong-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.2
    • /
    • pp.131-138
    • /
    • 2010
  • Due to the increased water demand and severe drought as an effect of the global warming, the effluent from wastewater treatment plants becomes considered as an alternative water source to supply agricultural, industrial, and public (gardening) water demand. The effluent from the wastewater treatment plant is a sustainable water source because of its good quality and stable amount of water discharge. In this study, the water reuse system was developed to minimize total construction cost to cope with the uncertain water demand in future using two-stage stochastic linear programming with binary variables. The pipes in the water reuse network were constructed in two stages of which in the first stage, the water demands of users are assumed to be known, while the water demands in the second stage have uncertainty in the predicted value. However, the water reuse system has to be designed now when the future water demands are not known precisely. Therefore, the construction of a pipe parallel with the existing one was allowed to meet the increased water demands in the second stage. As a result, the trade-off of construction costs between a pipe with large diameter and two pipes having small diameters was evaluated and the optimal solution was found. Three scenarios for the future water demand were selected and a hypothetical water reuse network considering the uncertainties was optimized. The results provide the information about the economies of scale in the water reuse network and the long range water supply plan.

Quantitative Fire Risk Assessment and Counter Plans Based on FDS and GIS for National Road Bridges (FDS와 GIS를 이용한 교량 화재 위험도의 정량적 평가 및 적용방안)

  • Ann, Ho June;Park, Cheol Woo;Kim, Yong Jae;Jang, Young Ik;Kong, Jung Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.6
    • /
    • pp.185-195
    • /
    • 2017
  • In recent years, unexpected bridge fire accidents have increased because of augmenting the number of traffic volumes and hazardous materials by the increment in traffics and distribution business. Furthermore, in accordance with the effort of using the under space of bridges, the ratio of occupied by combustible materials like oil tanker or lorry has been increased. As a result, the occurrence of bridge fire has been growing drastically. In order to mitigate the accident of bridge fire, risk assessment of bridge fire has been studied, however, practical risk models considering safety from users' viewpoints were scarce. This study represented quantitative risk assessment model applicable to national road bridges in Korea. The primary factors with significant impacts on bridge fire accidents was chosen such as clearance height, materials of bridges, arrival time of fire truck and fire intensity. The selected factors were used for Fire Dynamics Simulation (FDS) and the peak temperature calculated by FDS in accordance with the fire duration and fire intensity. The risk assessment model in bridge fire reflected the FDS analysis results, the fire damage criteria, and the grade of fire truck arrival time was established. Response plans for bridge fire accidents according to the risk assessment output has been discussed. Lastly, distances between bridges and fire stations were calculated by GIS network analysis. Based on the suggested assessment model and methodology, sample bridges were selected and graded for the risk assessment.

Development on Classification Standard of Drought Severity (가뭄심도 분류기준의 개선방안 제시)

  • Kwon, Jinjoo;Ahn, Jaehyun;Kim, Taewoong
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.2
    • /
    • pp.195-204
    • /
    • 2013
  • As drought is phenomenon of nature with unavoidability and repeated characteristic, it is necessary to plan to respond to it in advance and construct drought management system to minimize its damage. This study suggested standard for classification of drought, which is appropriate for our nation to respond to drought by assessing drought severity in the regions for this study. For data collection, 61 locations were selected - the locations keep precipitation data over 30 years of observation. And data for monthly precipitation for 37 years from 1973 were used. Based on this, this study classified unified drought interval into four levels using drought situation phases which are used in government. For standard for classification of drought severity fit to our nation, status of main drought was referred and these are classified based on accumulated probability of drought - 98~100% Exceptional Drought, 94~98% Extreme Drought, 90~94% Severe Drought, 86~90% Moderate Drought. Drought index (SPI, PDSI) was made in descending order and quantitative value of drought index fit to standard of classification for drought severity was calculated. To compare classification results of drought severity of SPI and PDSI with actual drought, comparison by year and month unit were analyzed. As a result, in comparison by year and comparison by month unit of SPI, drought index of each location was mostly identical each other between actual records and analyzed value. But in comparison by month unit of PDSI for same period, actual records did not correspond to analyzed values. This means that further study about mutual supplement for these indexes is necessary.