Schematic Estimation Process for Finishing Work using 3D Geometry-Knowledge Information (3차원 형상·지식정보를 활용한 마감공사 개산견적 프로세스)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.210-212
    • /
    • 2013
  • The construction cost estimates during the design phase becomes the standard to judge profitability and validity, and is very important in various decision-makings by project owner. However, since approximate costs are quoted when many parts are undecided in the early stage of project, differences are bound to occur between the construction cost calculated through approximate quotation and that put into construction actually. Also, since in existing quotation works, quantity calculations have been dependent on the staff's manual work, involving error potential, and thus differences are likely in quantity calculation depending on the quotation staff's method of calculation. In this study, the process of creating space model to deduce 3D geometry information for approximate quotation in association with knowledge information and the expression for calculation of finishing area were proposed.

  • PDF

Development of Automation Technology for Structural Members Quantity Calculation through 2D Drawing Recognition (2D 도면 인식을 통한 부재 물량 산출 자동화 기술 개발)

  • Sunwoo, Hyo-Bin;Choi, Go-Hoon;Heo, Seok-Jae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.227-228
    • /
    • 2022
  • In order to achieve the goal of cost management, which is one of the three major management goals of building production, this paper introduces an approximate cost estimating automation technology in the design stage as the importance of predicting construction costs increases. BIM is used for accurate estimating, and the quantity of structural members and finishing materials is calculated by creating a 3D model of the actual building. However, only 2D basic design drawings are provided when making an estimating. Therefore, for accurate quantity calculation, digitization of 2D drawings is required. Therefore, this research calculates the quantity of concrete structural members by calculating the area for the recognition area through 2D drawing recognition technology incorporating computer vision. It is judged that the development technology of this research can be used as an important decision-making tool when predicting the construction cost in the design stage. In addition, it is expected that 3D modeling automation and 3D structural analysis will be possible through the digitization of 2D drawings.

  • PDF

Stochastic Order Level Inventory System with Dependent Lead Times (제품인도기간에 함수인 확률적 주문수준 재고정책에 관한 연구)

  • Kim, Yeong-Min
    • Journal of Korean Society for Quality Management
    • /
    • v.14 no.1
    • /
    • pp.33-38
    • /
    • 1986
  • This paper deals with probabilistic order level inventory system which the quantity ordered at the end of the scheduling period is dependent on lead times. To find an optimal solution, pearson system of distributions is used to approximate the probability density function of the on-order quantity. An example is solved and sensitivity analysis is performed to examine the relation between lead times and the ordering quantity.

  • PDF

Higher Order Moments of Record Values From the Inverse Weibull Lifetime Model and Edgeworth Approximate Inference

  • Sultan, K.S.
    • International Journal of Reliability and Applications
    • /
    • v.8 no.1
    • /
    • pp.1-16
    • /
    • 2007
  • In this paper, we derive exact explicit expressions for the triple and quadruple moments of the lower record values from inverse the Weibull (IW) distribution. Next, we present and calculate the coefficients of the best linear unbiased estimates of the location and scale parameters of IW distribution (BLUEs) for different choices of the shape parameter and records size. We then use the higher order moments and the calculated BLUEs to compute the mean, variance, and the coefficients of skewness and kurtosis of certain linear functions of lower record values. By using the coefficients of the skewness and kurtosis, we develop approximate confidence intervals for the location and scale parameters of the IW distribution using Edgeworth approximate values and then compare them with the corresponding intervals constructed through Monte Carlo simulations. Finally, we apply the findings of the paper to some simulated data.

  • PDF

Economic production quantity with expontial deterioration

  • Hwang, Hark;Kim, Kap-Hwan
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.4 no.1
    • /
    • pp.53-58
    • /
    • 1979
  • Production lot sizing problem for a system with exponentially decaying inventory is considered. From the exact cost function developed under conditions of constant demand and no shortages permitted, an approximate optimal solution is derived. The formula is compared with those of the exact solution obtained from numerical procedure and other existing approximate solution. Finally some notable properties of the formula are investigated and shown to be consistent.

  • PDF

An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

FIXED POINT THEOREMS FOR GENERALIZED CONTRACTIVE FUZZY MAPPINGS

  • Jeong, Jae-Ug
    • Journal of applied mathematics & informatics
    • /
    • v.9 no.1
    • /
    • pp.433-440
    • /
    • 2002
  • In this paper, we first prove the existence of fixed points for fuzzy mappings that satisfy a certain contractive condition. Also, we give a fixed point theorem for generalized contractive fuzzy mapping by using Caristi's by fixed point theorem.

Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage (사업기획단계에서의 현수교의 물량추정을 위한 모델연구)

  • Park, Weon-Tae;Chun, Kyoung-Sik
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.4
    • /
    • pp.24-29
    • /
    • 2015
  • Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.

The Analysis of the Seepage Quantity of Reservoir Embankment using Stochastic Response Surface Method (확률론적 응답면 기법을 이용한 저수지 제체의 침투수량 해석)

  • Bong, Tae-Ho;Son, Young-Hwan;Noh, Soo-Kack;Choi, Woo-Seok
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.3
    • /
    • pp.75-84
    • /
    • 2013
  • The seepage quantity analysis of reservoir embankment is very important for assessment of embankment safety. However, the conventional analysis does not consider uncertainty of soil properties. Permeability is known that the coefficient of variation is larger than other soil properties and seepage quantity is highly dependent on the permeability of embankment. Therefore, probabilistic analysis should be carried out for seepage analysis. To designers, however, the probabilistic analysis is not an easy task. In this paper, the method that can be performed probabilistic analysis easily and efficiently through the numerical analysis based commercial program is proposed. Stochastic response surface method is used for approximate the limit state function and when estimating the coefficients, the moving least squares method is applied in order to reduce local error. The probabilistic analysis is performed by LHC-MCS through the response surface. This method was applied to two type (homogeneous, core zone) earth dams and permeability of embankment body and core are considered as random variables. As a result, seepage quantity was predicted effectively by response surface and probabilistic analysis could be successfully implemented.

Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit - (조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 -)

  • Jung, Un-Soo;Choi, Key-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.97-111
    • /
    • 2012
  • This study aims to find a proper construction cost calculation method by comparing unit prices of cost estimate in landscape construction among other public ordering construction projects. There were 7 out of 12 items from the actual work cost in the first half of 2011 were compared. The 12 items were classified as landscape Architectural construction and the 7 items were the approximate standard. As applied construction types, the comparable 35 items out of the 80 actual work cost items applied to 5 sites were compared to the unit price of the standard quantity per unit in March 2011, which was the approximate standard. Actual construction rate of the 7 items in the category of landscape sector was 104.86% for each item and 92.09% as a total construction cost. The high actual construction rate was caused by the high rate of seed spray depending on the status of applying rocks. However, there were more fundamental reasons for the cost generated from aslope treatment for grass and seed spray. So, it requires more detailed regulations on the modification factors for each soil type, the standard and needs to improve theillogical standard quantity per unit system. Actual construction rate of the 35 items in the applied sectors of civil engineering and architecture was 78.65% for each item and 71.31% (70.17%) as a total construction cost. This shows that actual unit cost cannot reflect actual cost structurally and standard quantity per unit system lacks practicality in terms of construction due to thelabor force. 85.1~91.2 % actual construction rate announced by the Ministry of Land and Maritime Affairs referred to the newly switched items. So the result was estimated as actual construction rate. This requires supplementation after verification in order to make the actual work cost produce at a proper rate. Also, standard quantity per unit system needs complementation with these actual data and so on.