• 제목/요약/키워드: apartment project

검색결과 339건 처리시간 0.022초

공동주택 건설 프로젝트의 성과관리를 위한 감리업무 데이터 적용성 분석 (Analysis of Applicability of Supervisory Data for Performance Evaluation of Apartment Housing Construction Projects)

  • 성유경;허윤경;김성환;이승우;강성미;박찬혁
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.359-360
    • /
    • 2023
  • As data management and analysis technology advances, there is active discussion on how to utilize data generated in construction projects. Among them, the materials produced during the supervision work are highly useful because their generation cycle and format are regulated according to relevant laws. In this study, we analyzed whether the data produced during the supervision work in the construction phase of apartment housing can be utilized for project performance management. First, this study identified key data necessary for performance management through FGI with experts in the field of apartment housing. Next, we collected supervisory data from the case project and identified whether the data was generated, its cycle, and storage format. As a result of the analysis, the supervisory data contained various information that could measure the performance of construction projects and had the advantage of standardized data. In the future, utilizing supervisory data is expected to enable effective performance management of apartment housing construction projects.

  • PDF

대구시 주거환경개선사업 현지개량지구의 실태에 관한 연구 (An Analysis of the On-site Improvement Area of Residential Environment Improvement Project in Daegu)

  • 김한수;김철수
    • 한국주거학회논문집
    • /
    • 제22권2호
    • /
    • pp.43-51
    • /
    • 2011
  • This study aims to analyze the on-site improvement area of residential environment improvement project based on research results derived from the on-site and questionnaire survey in case of Daegu. The main findings are as follows. First, residents complain about delay of project completion because a long time has been passed after on-site improvement area was designated. Experts and government officials agree that a new method of development is required. Second, future development should discriminate on-site improvement area according to its level of project completion. The area should be classified into project completion areas and on-going area, and new methods, such as redevelopment, apartment-housing construction method, should be allowed. Third, for better management of on-site improvement area, laws and regulations must be ready and government's will for improvement is crucial.

사회적 혼합아파트 거주자의 혼합유형 선호특성과 사회적 행태 연구 -서울시 은평뉴타운을 대상으로- (Preferences of Mixed Types in a Social Mix Apartment Community and It's Residents' Social Behavior - Focused on the first district in Eunpyeong New Town in Seoul -)

  • 이혜진;이연숙;이수진
    • KIEAE Journal
    • /
    • 제11권5호
    • /
    • pp.69-77
    • /
    • 2011
  • In order to solve social exclusion and segregation phenomenon and to realize social integration, the necessity of social combination and consensus has been presented and existing conception about the public lease apartment confronts a turning point due to the diversification of apartment supply system. With this social background, Eunpyeong New Town Project implemented by Seoul Metropolitan Government is the first example that supplied diverse apartments for social integration. Survey was made upon the residents aged 20 and over and living in combination apartments, lease apartments and common apartments for private ownership in the Enpyeong New Town Apartment Complex in section 1 area, and the survey sheets filled up by the respondents were collected by personal visits or by using specified gathering spots. Summary of study results is as follows: Firstly, regarding the combination method, respondents preferred the irregular combination of lease apartment units and common apartment units in the same apartment building at the top, analyzing by survey groups marked that residents of common apartment with initial ownership responded not to choose combination apartment complex or combination apartment in future. Secondly, the living consciousness with neighbors revealed that respondents were generally satisfied without difference between the residents of lease apartment and common apartment. As the demand and policies for diverse lease apartments are increasing recently, Eunpyeong New Town Project aimed for positive social integration and consensus will be evaluated as model case for social combination apartment in future. And it is necessary to introduce the policies that consider the differences in consciousness and interest of the residents among the lease apartments and common apartments.

ANALYSIS AND IMPROVEMENT OF FINISHING WORK PROCESS FOR COST MANAGEMENT (FOCUSED ON INDOOR FINISHING WORK OF APARTMENT)

  • Hoon-Ku Lee;Yoon-sun Lee;Ja-Young Yoon;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.711-720
    • /
    • 2007
  • Apartment housing in the Korean domestic construction industry has had various and high-quality finishing work since the enforcement of price deregulation in 1998. Before the enforcement of price deregulation, feasibility studies of housing projects have not had particular difficulties as uniform description of finishing work items were reflected and finishing work cost also was equalized. However, the recent distinction of finishing work based on the same floor plan brings about project cost variation, along with many effects on construction management due to project cost increment. Accordingly, this paper suggests the improved plan of cost management to control the feasibility study result consistently during the life cycle of a project through an analysis based on cost management phase due to cost blackout, appearing at the commencement of a project, cost gradation caused by high-quality finishing work item, and cost reduction due to the degradation of finishing work after analysis of current apartment construction process focused on finishing work using the IDEF process analysis technique.

  • PDF

OFF-SITE MANUFACTURE OF APARTMENT BUILDINGS

  • Neville Boyd
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.304-310
    • /
    • 2011
  • The populations of major cities in Australia are increasing rapidly and facing an acute housing shortage. Traditional apartment procurement techniques involve lengthy lead-times and factory-based, or offsite manufactured (OSM) multi-storey apartment buildings may offer the opportunity to help fulfill the need by significantly reducing build times. Other advantages of OSM may include superior quality, low weight ratios, economies of scale achieved through repetition of prefabricated units, use on infill sites, sustainable design standards and better occupational health and safety. There are also positive labour and training implications, which may help to alleviate an industry-wide shortage of skills through use of semi-skilled labour. Previous uncertainties about the adoption of offsite due to the high capital costs and perception issues were generally based on pre-cast concrete structures, which are quite a different building type in terms of flexibility, construction, delivery and finishes. Identification of drivers and constraints assists in the determination of current industry status, allows for a benchmark to be established and future opportunities and directions for OSM to be determined.

  • PDF

공동주택 리모델링 사업 분담금 산정의 문제점 및 개선방안 (Improved Methods of Cost Sharing in Apartment Remodeling Projects)

  • 김정원;이동진;이민주;이지형
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.184-185
    • /
    • 2019
  • The purpose of this study is to suggest the improved methods for cost sharing in apartment remodeling projects. Case studies on apartment remodeling projects with different plan type were analyzed and compared. Cost sharing estimated by 'proportional rate method' shows similar results estimated by 'return on investment method' in case of similar area ratio of existing plan to remodeling plan. Otherwise cost sharing estimated by 'proportional rate method' shows great differences comparing the results estimated by 'return on investment method'. Although return on 'proportional rate method' is widely used, it is not proper to estimate cost sharing when each householder's contribution for the project varies, such as considerable differences area ratio of existing plan to remodeling plan. Improved cost sharing method is needed taking into account project contribution and characteristics.

  • PDF

A COMPOSITE FRAME CONCEPT FOR THE LONG LIFE OF APARTMENT BUILDINGS

  • Sungho Lee;Sunkuk Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.111-116
    • /
    • 2011
  • Consumers demand an increasing variety of requirements for the residential space as the quality of life improves. However, many apartment buildings with the bearing wall structure cannot meet such demands in Korea. A lot of construction resources are squandered and wastes are created as this type of residential buildings is reconstructed. The life of apartment buildings needs to be extended on the basis of easy remodeling of internal space in order to overcome the limits of the bearing wall structure. This research project aims to propose the Rahmen composite frame concept for the long life of apartment buildings. The Rahmen composite frame is expected to have better structural performance, constructability and economic feasibility than the bearing wall structure.

  • PDF

공동주택 개발 사업의 비용분석을 위한 시스템 다이내믹스 모델 개발 연구 (Development of a System Dynamics Model for Cost Analysis of Housing Development Projects)

  • 김근우;윤석헌
    • 한국건축시공학회지
    • /
    • 제11권3호
    • /
    • pp.221-228
    • /
    • 2011
  • 본 연구에서는 아파트 개발 사업의 타당성 분석을 위한 시스템다이내믹스 모델을 개발하고 사례연구를 수행하고자 하였다. 연구에서는 기존의 아파트개발 사업 사례와 연구 프로젝트 자료들을 근거로 현금흐름 구성요소들을 도출하였고, 시스템사고 방법과 시스템다이내믹스 모델을 사용하여 이들 요소의 상호 영향관계를 찾고자 노력하였다. 연구에서는 모델을 정의하고 분석하기 위해 Vensim이라는 시스이내믹스 소프트웨어를 사용하였다. 이렇게 도출된 모델을 검증하기 위해 사례 연구를 진행하였으며, 사례연구 결과 연구에서 개발한 모델이 실제 프로젝트에 적용이 가능할 것으로 판단되었다. 연구에서 도출된 모델은 아파트 개발사업자들이 프로젝트의 초기단계에 프로젝트 파이낸싱과 관련한 의사결정에 도움이 될 수 있을 것으로 판단된다.

맞춤형 공동주택 프로젝트의 업무단계별 낭비요인 분석 (The Analysis of Waste Factors for Business Phases on Customized Apartment Project)

  • 최정임;이기석;정성호;송영웅;최윤기
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.146-156
    • /
    • 2013
  • 최근 맞춤형 공동주택이 수요자의 다양한 요구의 반영을 통해 공동주택시장에서 나타나고 있다. 수요자 측면에서 맞춤형 공동주택은 수요자의 다양한 선택권을 최대한 보장한다는 장점이 있는 반면, 공급자인 건설사입장에서는 현장 관리요소의 증가, 공기지연 증대 등의 문제점이 있다. 이러한 문제점은 맞춤형 공동주택 업무에 대한 체계적인 고찰의 부족과 불가피하게 발생되는 고객요구에 대한 업무대응 방안의 부재, 사업수행 경험부족 등에서 기인한 것으로 판단된다. 따라서 본 연구에서는 맞춤형 공동주택 프로젝트의 활성화를 위해 업무를 수행함에 있어서 효율성을 저하시키는 낭비요인을 도출하였다. 이를 위해 전문가 자문 및 설문을 통해 프로젝트 단계별 수행절차 및 주체를 분석하고 정의하였으며, 무다방법론을 통해 각 단계별 낭비요인을 도출하고, AHP를 통해 각 단계별 낭비요인을 분석하였다. 도출결과 각 단계별로 발생되는 낭비요인 중 고객의 요구사항 및 수정에 의해 발생되는 설계변경 및 부적절한 프로세스가 우선순위가 높은 것으로 나타났다. 본 연구의 결과는 유사 프로젝트 수행시 발생되는 낭비요인에 대한 대응방안을 제공할 것이며, 불필요한 공기 단축 및 비용발생을 줄이는데 기여할 것이다.

Time Shortening of Structural Framework of High-rise Apartment Housing for the Urgent Project Area: Focused on the Cases of Insufficient Time or Delayed Projects

  • Bang, Jong-Dae;Lee, Do-Heun;Chun, Young-Soo;Park, Ji-Young;Lee, Bum-Sik;Jun, Myoung-Hoon
    • 토지주택연구
    • /
    • 제2권4호
    • /
    • pp.355-365
    • /
    • 2011
  • Construction duration is very important as a factor which comprises three axises of construction management with quality and cost in construction project. In general project condition, construction duration is optimized while minimizing construction cost and securing required quality. However, in case of insufficient project time duration or delayed projects, project progress management is different from those of normal projects. These project areas need solutions to complete work within a given completion day. To time shortening the current duration of each typical floor of structural framework in apartment construction is investigated, and a basic time schedule planning for typical floor of structural framework in normal projects is planned. This study proposed 3 ways for time shortening of urgent project or insufficient construction duration project. Also, This study proposed detailed time shortening method and technical solution conditions while time is shortened.