• Title/Summary/Keyword: apartment management system

Search Result 309, Processing Time 0.027 seconds

Investigating the Impact of Project Management on Construction Defects in Housing Projects: With a Focus on Project Manager Experience (프로젝트 관리가 공동주택 건설의 하자 발생에 미치는 영향: 프로젝트 매니저 경험의 조절효과를 중심으로)

  • Young-Jun Lee;Seung-Chul Kim;Minjeong Oh;Sungyong Choi
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.209-220
    • /
    • 2023
  • Recently, defects that occurred during the construction of apartment houses have become a social issue. Defects in apartment houses lead to waste of resources and economic loss, causing psychological and physical damage to customers, and a decrease in reliability and financial loss to construction companies. The purpose of this study was to analyze the impact of defect occurrence according to the difference in project management level in the apartment housing construction stage, and to investigate the extent to which the project manager's experience affects the defect occurrence rate. For the empirical analysis of the study, statistical analysis was conducted using data collected from 130 actual projects. The results of the analysis showed that schedule management, cost management, and quality management had a positive effect on reducing the defect occurrence rate in the execution stage of apartment housing construction, while human resource management productivity had a negative effect. This study theoretically demonstrated the importance of project management, and in practice, showed that schedule management, cost management, and quality management should be faithfully performed in the execution stage to reduce the rate of defects after project completion. It was also suggested that hiring an experienced project manager would help reduce project defects.

Development of PDA and Web-based System for Quality Inspection and Defect Management of Apartment Housing Project (PDA 및 웹 기반의 공동주택 품질점검 밀 하자관리 시스템의 개발)

  • Oh Se-Wook;Kim Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.140-150
    • /
    • 2005
  • Recently, quality inspection and defect management have been considered as one of the major issues for increasing customer satisfaction and corporate image in domestic construction industry. However, the quality inspection and defect management have not been performed systematically because of insufficient field managers, the excessive amount of documents, complicated work process and difficulty in communicating construction information. Therefore, the field manager could not perform the quality inspection and defect management work in time as well as the reliability of recorded quality and defect data was decreased. The primary objective of this study is to propose a quality inspection and defect management system using information technology which enables field managers to efficiently gather the information of defection in apartment housing. It is anticipated that the effective use of the proposed system would be able to imp개ve communication among the related participants and systematically accumulate data that might be used in similar construction projects.

SWOT Analysis on development to User-Oriented Smart Information Management System of defect in Apartment Building (사용자 중심의 스마트 하자정보관리 시스템 개발을 위한 SWOT 분석)

  • Kim, Beop-Su;Park, Jun-Mo;Kim, Ok-Kyue;Seo, Deok-Seok;Choi, Jeong-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.5-6
    • /
    • 2011
  • Defect dispute has been a continuous claim that concerning a apartment building. However, objective standard of judgment is inadequate to solve defect dispute. Furthermore, it need to scientific evidence that composited standard of judgment. This evidence has a necessary to collect a data for a long time and systematically analyze. Therefore, it need to develop smart information management system, in this study, it review user-oriented condition as swot analysis.

  • PDF

A Study on The Conflict Management for Apartment Reconstruction Project (공동주택 재건축사업의 갈등관리에 관한 연구)

  • Lee, Ro-Na;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.467-470
    • /
    • 2008
  • Apartment Reconstruction project causes lots of conflicts among stakeholders who don't have professional knowledge on a complicated work-flow In case these conflicts occur, the project might not be well by the damage passed to parties, and so the project cost might be increased, the project might be delayed and hazy as well if the conflicts are not resolved quickly. However, the damage would be indirectly and directly brought to the main parties in apartment reconstruction project because the conflicts aren't managed. Thus, an effective conflict assessment should be preceded, and a process and a system for managing the conflicts should be developed to prevent and settle the conflicts. The purpose of this study classifies the conflicts which are occurred on each phase of the project based on principal facts, and presents the process to develop conflict management system through conflict assessment to each stakeholder.

  • PDF

A Study on the Residential Energy Management of Apartment in the District Heating Area (지역난방 아파트의 난방 관리 실태에 관한 연구)

  • 최남숙
    • Journal of Families and Better Life
    • /
    • v.7 no.1
    • /
    • pp.79-95
    • /
    • 1989
  • Household energy consumption had influenced on the ecological system's environment. Household's exceeding energy consumption requires the development of resources and the risk. Thus this study attempted to find the household heating management, The purpose of this study was to investigate the household's heating management in the area of district heating. The major finding were; 1) The district heating was accepted positively and the benefit of this system was utilized very well in the household. 2) Variances in heating energy consumption was explained by the family size at October, residential period at October and November and the temperature of living room at October, November and December. 3) Compaired to central heating apartment, the low heating expenditure was characterize in the household of 4-5 persons, nuclear family at October, moderated heating control, using extra heating facilities at November. An in the December, that household was that husband has graduated college, temperature of the living room was some cold, and house wives was the full-time homemaker.

  • PDF

Attitude of resident to the management of multihousing - In case of aparment and raw houses, multi-family houses (공동주택 거주자의 주거관리의식 - 서울시 아파트와 연립, 다세대 주택을 중심으로 -)

  • 강순주
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 1994.05a
    • /
    • pp.37-44
    • /
    • 1994
  • The purpose of this research is to present necessity of manament system establishment and policy direction for fundmental data, understanding management reality and problem, comparing resident's management attitude to related variables in apartment and raw houses multi-family houses. The major finding were as follows : 1) The management attitude of Apartment inhabitant is very highm especially the attitude of maintenance management is the higest. But they disagree with the raise of management cost necessary to maintenance management. 2) The management attitude of Raw multi-family houses inhbitant is especially high, the maintenance management demand for safety and community-life contol attitude, resident's mutual cooperation is especially high, they think much of autonomy management, desire to achieve under more sysemnatic plan.

  • PDF

A Study on the Assessment and Performance Indicator Criteria for Repair Convenience of Apartment Building (I) - Private sector - (공동주택 수리용이성 주택 성능등급 인정 실태연구(I) - 전용공간을 중심으로 -)

  • Lim, Seok-Ho;Ji, Jang-Hun;Kim, Soo-Am
    • Journal of the Korean housing association
    • /
    • v.20 no.6
    • /
    • pp.47-56
    • /
    • 2009
  • Housing Performance Rating Indication System was started in 2006. The aim of Housing Performance Rating Indication is to provide the guideline of housing performance. Repair Convenience is similar to Remodeling. Remodeling has been paid more attention as an alternative for reconstruction. Especially, now the actual house supply is facing almost 100%, it is time to keep and maintenance management of apartment buildings, and ultimately it will expand the Long life housing. Especially consumers has to have a right to select apartment buildings by comparing performance of house. For construction companies, they need a performance code that standardized by government, so they can provide a Certain performing house. This study examines data which has been obtained from the recent application of Housing Performance Rating Indication System and Repair Convenience category is main concern. Findings from the study will provide vital information in improving current Housing Performance Rating Indication System.

A Study of Risk Analysis on Apartment Reconstruction Projects (공동주택 재건축사업의 리스크 분석에 관한 연구)

  • Lee Lo-Na;Woo Kwang-Min;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.232-235
    • /
    • 2004
  • The apartment reconstruction project is making some problems, such as delay of lack specialty, conflict between project owners and cost increasing etc. The enforcement process of project are very complicated, the term of project is long and too many project owners are participating. For this reasons. it is always in the face of uncertainty. To promote the reconstructing project successfully. we need to make risk management process to get rid of uncertain factors which occur in forwarding the reconstructing project This study has for its objects. First, suggest the best way of risk analysis to manage risk factors systematically and efficiently recognized in The Apartment reconstruction protect. Second, furnish basic data to build the risk managing system of The apartment reconstructing project.

  • PDF

A Study on the Actual Condition Survey of Apartment Rebar Work (공동주택 철근공사의 실태조사에 관한 연구)

  • Lee, Taick-Oun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.71-79
    • /
    • 2008
  • The rebar work is very related to the safety and durability of the building. Recently, the rebar work is produced some serious problems due to the lack of skillful crafts-man and the rising cost of rebar materials. Many papers have dealt with the rebar work of the manufacturing system in plants with a view to improvement those problems. But, the research on the rebar work of the manufacturing system in field is in a insignificant condition. This study presents the following improvement schemes as a result. First, the education strengthening for evaluation on practical affairs, second, the reinforcement of drawing & management in shop drawing and finally the simplification of apartment rebar work in slab. Also, this paper aims at advancing apartment rebar work by the actual condition survey in slab work. The further research will be needed about the whole structure parts such as foundation, wall, girder and rebar truss-deck plate as one of the improvement methods.

An Analysis on the Effect of Pressure System Installation on the Pipeline to Identify Pressurized Water and Self-inspection Ease in Apartment Building (아파트에 설치하는 옥내소화전 압력계 설치가 배관의 가압수 식별 및 자체점검 용이성 간의 영향 분석)

  • Son, Joo-Dal;Kong, Ha-Sung
    • Journal of the Korea Safety Management & Science
    • /
    • v.22 no.1
    • /
    • pp.33-44
    • /
    • 2020
  • This study analyzed how the installation of a pressure gauge in the indoor fire hydrant of an apartment building affected identifying pressurized water in the pipe, making it easier to conduct internal inspection on the fire suppression system, and ensuring reliability of fire suppression. The following are the study's results: First, identifying pressurized water in the indoor firefighting pipe had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This implies that a higher level of identification of pressurized water in the indoor firefighting pipe had a positive impact on improving the installation and use of a pressure gauge in the indoor fire hydrant. Second, making it easier for the fire safety officer to inspect the fire suppression system had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This suggests that if it becomes easier for the apartment building's stakeholder to conduct internal inspection or the firefighting facility manager to carry out inspection on the fire suppression system, it would have a positive effect on the installation of a pressure gauge in the indoor fire hydrant. Finally, ensuring reliability in fire suppression had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This implies that if it becomes easier to identify pressurized water in the indoor firefighting pipe, for the fire safety officer to conduct internal inspection, or for the firefighting facility manager to carry out inspection in accordance with the fire suppression system's internal inspection requirements, it would increase reliability in fire suppression, making it more necessary to install a pressure gauge in the indoor fire hydrant.