• Title/Summary/Keyword: analytic hierarchy process method

Search Result 670, Processing Time 0.029 seconds

Deterioration Evaluation of Railway Line Segments for Budget Distribution (예산배분을 위한 철도선로구간의 노후도 평가)

  • Kim, Seong-Ho;Choi, Chan-Yong;Na, Hee-Seung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1802-1809
    • /
    • 2011
  • A distribution method of limited budget for rail line facility improvement is to use investment priorities of rail line segments based on their deterioration. In this paper we present an evaluation method of rail line segment deterioration which can be used to distribute limited budget. Rail line facilities include rail track, crossing, road bed, bridge, tunnel. These facilities deterioration and line shape can affect line segment deterioration. Deterioration evaluation method we present is a weighted sum of each component deterioration scores. The component weight can be obtained from experts using analytic hierarchy process.

  • PDF

A Study on the assessment of force improvement effectiveness of KNTDS (KNTDS의 전투력 상승효과 측정에 관한 연구)

  • 이수열;이재영
    • Journal of the military operations research society of Korea
    • /
    • v.27 no.2
    • /
    • pp.56-75
    • /
    • 2001
  • Most O4I Systems are considered as one of the major system in future Information Warfare. However, it is difficult to measure the effectiveness of force improvement when C4I System is used with other weapon systems, quantitatively. In this Paper, we propose a quantitative method to evaluate the force improvement effectiveness of KNTDS(Korea Naval Tactical Data System). This method utilized the Lanchester's equations and its applications. We also showed a numerical example based on a given scenario in a sea battle and the ASP(Analytic Hierarchy Process) Method is applied to verify its results.

  • PDF

Evaluations of Industrial Accident Prevention Program of Korea by using Analytic Hierarchy Process(AHP) method (AHP기법을 적용한 산업재해예방사업 심층평가 항목의 가중치 설정)

  • Lee, June-Hee;Jung, Pilkyun;Rhie, Jeongbae;Roh, Jaehoon;Won, Jong-Uk
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.4
    • /
    • pp.55-61
    • /
    • 2013
  • We undertook the quantitative evaluations of Industrial Accident Prevention Program (IAPP). The six parameters, such as relevance, efficiency, consistency, sustainability, effectiveness, coherence, were chosen by expert plenary sessions. Two stage of Analytic Hierarchy Process were used to determine the weighted value of assessment criteria. This expert plenary suggests that the six parameters and its weight values are useful for quantitative evaluations of IAPP. Additional researches regarding the real world application of this assessment tool should be initiated.

Method for Measuring Usability of Smart Television (스마트TV의 사용성 측정방법)

  • Byun, Dae-Ho
    • Journal of Digital Convergence
    • /
    • v.11 no.5
    • /
    • pp.31-39
    • /
    • 2013
  • Smart TV is a television set with internet capabilities, computing ability, and broadcasting service that increases user interactions. Usability has been regarded as one of the most important criteria for measuring and evaluating smart TV. To evaluate smart TV from the perspective of usability, we first need to develop a measurement model by determining the major factors affecting usability, which become a measurement the evaluation criteria of the model. The objective of this paper is to suggest an AHP(Analytic Hierarchy Process) model for measuring usability of smart TV. Factors affecting usability are described from the prior research. We show how the judgment data is acquired and the usability score is computed by an numerical example.

Comprehensive Evaluation of Impacts of Connecting Distributed Generation to the Distribution Network

  • Jin, Wei;Shi, Xuemei;Ge, Fei;Zhang, Wei;Wu, Hongbin;Zhong, Chengyuan
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.2
    • /
    • pp.621-631
    • /
    • 2017
  • In this paper, we study the various impacts of connecting distributed generation (DG) to the distribution network. The comprehensive evaluation index system (CEIS) of four hierarchies is established, considering economy, reliability and voltage quality, and the calculation methods of different indexes are presented. This paper puts forward an improved triangular fuzzy number analytic hierarchy process (ITFNAHP) to weight the second level indexes (SLI) and the third level indexes (TLI), and calculates the variation coefficient to weight the fourth level indexes (FLI). We calculate the comprehensive weight coefficients based on the weight coefficients of the SLI, TLI and FLI, and then calculate the comprehensive evaluation of satisfaction (CES) of different access schemes. On the basis of the IEEE 33-bus example system, simulations of the calculation methods and the comprehensive evaluation method are carried out under different DG access schemes according to the same total investment cost and the same permeability, respectively, and the simulation results are analyzed and discussed.

Regarding the Preliminary Feasibility Study of National R&D Program : With Focus on the Applicability of Theory of Attractive Quality (국가연구개발사업 예비타당성조사 제도의 평가방식에 대한 연구 : 매력적 품질이론의 적용 가능성에 대하여)

  • Yim, Sung-Min;Jung, Uk
    • Journal of Korean Society for Quality Management
    • /
    • v.42 no.2
    • /
    • pp.131-143
    • /
    • 2014
  • Purpose: This paper discusses the intrinsic assumption of one-dimensional relationship between the upper and lower levels in AHP(Analytic Hierarchy Process) for the Preliminary Feasibility Study of National R&D Program. This assumptions has not been questioned in academia and industry so far. Methods: This discussion is induced by understanding the Theory of Attractive Quality (Kano et al. 1984) and explains the limitation of AHP in the preliminary feasibility study of national R&D program. Results: In this paper, we propose a new questioning method based on two dimensional perspective, which is named as 2D-AHP (two dimensional AHP), to overcome the limitation. The main idea stems from the observation that the relationship between the upper and lower levels in AHP can vary depending on the subject of R&D. Conclusion: The two dimensional perspective pointed out in this paper should be more deeply studied in the field of MCDM(multi-criteria decision making) since it can be applied to the more general problems in human decision making.

Improvement Directions for the G-SEED System from the Resident's Perspective - Focused on Certification Assessment Criteria for Apartment Buildings -

  • Choi, Yeo Jin;Lhee, Sang Choon
    • KIEAE Journal
    • /
    • v.14 no.4
    • /
    • pp.19-26
    • /
    • 2014
  • The building section is providing immediate causes for global climate change problems since it takes about 50% of carbon emission, 20~50% of waste discharge, 33% of energy consumption, 40% of resource use, and 17% of water consumption. So, many countries over the world have developed and implemented green building certification systems to assess sustainable performances of buildings since the early 1990s. In korea, the green building certification system to induce the diffusion of sustainable buildings was first introduced in 2002 and developed as an improved version of the G-SEED(Green Standard for Energy and Environmental Design) system in 2013 after major revisions of related legislations. This research conducts a survey targeting residents on an apartment building that was certified as green building and examines the importance of assessment criteria on apartment buildings to certify green buildings using the Analytic Hierarchy Process(AHP) method. And it proposes a new direction on certification assessment standards from the resident's prospective. As a result, assessment criteria such as indoor environment, ecological environment, energy & environment pollution, and maintenance management among 7 main ones turned out important on assessing the G-SEED system for apartment buildings, while criteria such as material & resource, water circulation management, and land use & transportation did relatively unimportant.

Reliable monitoring of embankment dams with optimal selection of geotechnical instruments

  • Masoumi, Isa;Ahangari, Kaveh;Noorzad, Ali
    • Structural Monitoring and Maintenance
    • /
    • v.4 no.1
    • /
    • pp.85-105
    • /
    • 2017
  • Monitoring is the most important part of the construction and operation of the embankment dams. Applied instruments in these dams should be determined based on dam requirements and specifications. Instruments selection considered as one of the most important steps of monitoring plan. Competent instruments selection for dams is very important, as inappropriate selection causes irreparable loss in critical condition. Lack of a systematic method for determining instruments has been considered as a problem for creating an efficient selection. Nowadays, decision making methods have been used widely in different sciences for optimal determination and selection. In this study, the Multi-Attribute Decision Making is applied by considering 9 criteria and categorisation of 8 groups of geotechnical instruments. Therefore, the Analytic Hierarchy Process and Multi-Criteria Optimisation and Compromise Solution methods are employed in order to determine the attributes' importance weights and to prioritise of instruments for embankment dams, respectively. This framework was applied for a rock fill with clay core dam. The results indicated that group decision making optimizes the selection and prioritisation of monitoring instruments for embankment dams, and selected instruments are reliable based on the dam specifications.

Risk management applicable to shield TBM tunnel: II. Risk analysis methodology (쉴드 TBM 터널에 적용 가능한 리스크 관리: II. 리스크 분석 방법)

  • Hyun, Ki-Chang;Min, Sang-Yoon;Moon, Joon-Bai;Jeong, Gyeong-Hwan;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.6
    • /
    • pp.683-697
    • /
    • 2012
  • In this paper, a risk analysis methodology applicable to shield TBM tunnels was studied. Fault Tree Analysis (FTA) was utilized to identify all risk items and to calculate the probability of failure of each item and Analytic Hierarchy Process (AHP) was used to obtain the impact of each risk item. Finally, a risk level of each risk item can be assessed. Developed methodology is applied to a Seoul subway site in which EPB shield tunnel method was utilized and it was found that risk analysis results matched reasonably well with field data.

A Relative Importance Evaluation for the Perception of Managers on the Comprehensive Rural Village Development Project using Analytic Hierarchy Process (계층분석과정(AHP)을 활용한 권역단위 종합정비사업 사무장 의식의 상대적 중요도 평가)

  • Jang, Dong-Heon
    • Journal of Korean Society of Rural Planning
    • /
    • v.21 no.1
    • /
    • pp.41-50
    • /
    • 2015
  • In this study, the relative importance for the perception of managers on the comprehensive rural village development projects was evaluated using the AHP method. The fields for evaluation were 4 fields including human relationships, working conditions, work compensation and work burnout. Also, the relative importance for the perception of managers and priority order were analyzed through 15 evaluation items. The analysis result shows that the human relationships among 4 fields were regarded as the most important field, followed by work compensation, working conditions and work burnout. Also, the relationship with the chairperson for the human relationships, continuity of employment for the working conditions, salary for work compensation, and mental stress for work burnout were considered respectively as the most important item. Also, salary among all evaluation items was considered as the most important item for the relative importance, followed by continuity of employment, relationship with village residents and mental stress. However, work load, consulting firms, impersonal treatment and the relations between the administration showed relatively low importance and priority order. It is considered that this analysis result will be used as important preliminary data for establishing the role of manager in the comprehensive rural village development project.