Free Spanning of Offshore Pipelines by DNV

  • CHOI HAN SUK
    • Journal of Ocean Engineering and Technology
    • /
    • v.19 no.2 s.63
    • /
    • pp.47-52
    • /
    • 2005
  • This paper introduces a procedure for free span and fatigue analysis of offshore pipelines per DNV-RP-F105, 2002. The new method includes the axial force and deflection load in pipelines. The screening criteria were established to calculate the allowable span lengths in the new design codes. The screening criteria allows a certain amount of vortex-induced vibration due to wave and current loading. However, the induced pipe stresses are very small and usually below the limit stresess of typical S-N curves. In contrast, the conventional criteria did not allow any vortex-induced vibration in the free span of pipelines. Thus, the screening criteria yields reduced allowable span lengths. A simplified procedure was established to calculate the fatigue damage due to long-term current distribution. The long-term current statistics was assumed with a 3-parameter Weibull distribution. The fatigue damage was estimated for the span lengths obtained from the screening criteria for various conditions. Sample calculations show the effect of axial force for various boundary conditions. Comparisons with conventional criteria are included.

Load Redistribution of Prestressed Concrete Girder Bridges during the Bearing Replacement

  • Park, Sun-Kyu;Kim, Hyeong-Yeol;Kim, Jung-Hyuk
    • KCI Concrete Journal
    • /
    • v.11 no.3
    • /
    • pp.141-151
    • /
    • 1999
  • In the replacement of bearing system of bridges, the jacking work to secure work spaces may cause damage of the superstructure, hence the behavior of superstructure by the jacking force must be considered. Especially, in prestressed concrete I-type girder bridges, considering the stress concentration at the girder and the load redistribution of superstructure, the allowable jacking force and jacking sequence have to be determined. In this study, an analytical method is proposed to calculate the jacking force and overall jacking sequence for the replacement of bearing system without any damage to the superstructure. The stress concentration at the girder and load redistribution of the deck due to jacking force are considered to compute the allowable jacking force for each girder and overall jacking sequence for girders in the deck. Using the solution algorithm developed in this study, the optimum jacking sequence and required jacking force for the prestressed concrete I-type gilder bridge having the standard sections are calculated.

  • PDF

Effect of Unequal Settlement on Damage of Resilient Sleepers on Concrete Ballast (콘크리트도상 방진침목의 파손에서 부등침하가 미치는 영향)

  • Kim, Jin-Il;Lee, Jee-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.2 s.74
    • /
    • pp.80-88
    • /
    • 2006
  • In the present study damage behavior of resilient sleepers on concrete ballasts is analyzed. Cracks of resilient sleepers in a railway track system are concentrated on inside of blocks to which the tie bars are connected. Finite element analysis is performed by dividing a block into the straight section and the curved section according to the load condition of the resilient sleeper, and limited the interpretation within the range of resilience. In addition, the value of stress obtained from the interpretation was compared with the allowable stress of concrete to determine the safety. According to the result of numerical analysis, compared with the stress before unequal settlement, the tensile stress of the inside of the block increased significantly after the settlement considering the entire block, and the tensile stress of this part exceeded the allowable stress of concrete, so was undesirable in terms of safety. In reality, the arrangement of tensile stiffeners inside blocks connected to tie bars is improper in the design of resilient sleepers, and when unequal settlement occurs, tensile stress increases on this part and consequently causes cracking damage. It is necessary to arrange wire meshes or tensile reinforcing bars in a structurally safe way to reinforce the inside of blocks on which cracks are concentrated.

Damage controlled optimum seismic design of reinforced concrete framed structures

  • Gharehbaghi, Sadjad
    • Structural Engineering and Mechanics
    • /
    • v.65 no.1
    • /
    • pp.53-68
    • /
    • 2018
  • In this paper, an innovative procedure is proposed for the seismic design of reinforced concrete frame structures. The main contribution of the proposed procedure is to minimize the construction cost, considering the uniform damage distribution over the height of structure due to earthquake excitations. As such, this procedure is structured in the framework of an optimization problem, and the initial construction cost is chosen as the objective function. The aim of uniform damage distribution is reached through a design constraint in the optimization problem. Since this aim requires defining allowable degree of damage, a damage pattern based on the concept of global collapse mechanism is presented. To show the efficiency of the proposed procedure, the uniform damage-based optimum seismic design is compared with two other seismic design procedures, which are the strength-based optimum seismic design and the damage-based optimum seismic design. By using the three different seismic design methods, three reinforced concrete frames including six-, nine-, and twelve-story with three bays are designed optimally under a same artificial earthquake. Then, to show the effects of the uniform damage distribution, all three optimized frames are used for seismic damage analysis under a suite of earthquake records. The results show that the uniform damage-based optimum seismic design method renders a design that will suffer less damage under severe earthquakes.

Effects of Long-Term Harbor Shutdown and Temporal Operational Stoppage upon Optimal Design of Vertical Breakwater Caisson (장기간의 항만 폐쇄와 일시적 운영 중단이 직립 방파제 케이슨의 최적 설계에 미치는 영향)

  • Suh, Kyung-Duck;Kim, Deok-Lae;Kim, Kyung-Suk
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.19 no.2
    • /
    • pp.113-127
    • /
    • 2007
  • In this study, a model to calculate the expected total construction cost is developed that simultaneously considers the rehabilitation cost related to the sliding of the caisson, the economic damage cost due to harbor shutdown in the event of excessive caisson sliding, and the economic damage cost due to temporal operational stoppage by excessive wave overtopping. A discount rate is used to convert the damage costs occurred at different times to the present value. The optimal cross-section of a caisson is defined as the cross-section that requires a minimum expected total construction cost within the allowable limit for the expected sliding distance of the caisson during the lifetime of the breakwater. Two values are used for the allowable limit: 0.3 and 0.1 m. It was found that the economic damage cost due to harbor shutdown by excessive caisson sliding is more critical than the rehabilitation cost of the caisson or the economic damage cost by excessive wave overtopping in the decision of the optimal cross-section. In addition, the optimal cross-section of the caisson was shown to be determined by the allowable limit for the expected sliding distance rather than the minimum expected total construction cost as a larger value is used for the threshold sliding distance of the caisson for harbor shutdown.

Variability of plant risk due to variable operator allowable time for aggressive cooldown initiation

  • Kim, Man Cheol;Han, Sang Hoon
    • Nuclear Engineering and Technology
    • /
    • v.51 no.5
    • /
    • pp.1307-1313
    • /
    • 2019
  • Recent analysis results with realistic assumptions provide the variability of operator allowable time for the initiation of aggressive cooldown under small break loss of coolant accident or steam generator tube rupture with total failure of high pressure safety injection. We investigated how plant risk may vary depending on the variability of operators' failure probability of timely initiation of aggressive cooldown. Using a probabilistic safety assessment model of a nuclear power plant, we showed that plant risks had a linear relation with the failure probability of aggressive cooldown and could be reduced by up to 10% as aggressive cooldown is more reliably performed. For individual accident management, we found that core damage potential could be gradually reduced by up to 40.49% and 63.84% after a small break loss of coolant accident or a steam generator tube rupture, respectively. Based on the importance of timely initiation of aggressive cooldown by main control room operators within the success criteria, implications for improvement of emergency operating procedures are discussed. We recommend conducting further detailed analyses of aggressive cooldown, commensurate with its importance in reducing risks in nuclear power plants.

A Study on the Fatigue Strength and Allowable Stress of INVAR(Fe-36% Ni) Steel Lap Joint Applied to Cargo Containment of LNG Carrier (LNG선용 INVAR(Fe-36%Ni)강 Lap 이음부의 피로강도와 허용응력에 관한 연구)

  • 한명수;한종만;한용섭
    • Journal of Welding and Joining
    • /
    • v.12 no.1
    • /
    • pp.102-115
    • /
    • 1994
  • This paper is to evaluate the fatigue strength of lap joints of materials applied to LNG carrier cargo containment of GAZ-TRANSPORT(GT) type, which was welded by manual and automatic TIG welding process. The thicknesses of lapped members were 1.5mm/1.5mm or 1.5mm/0.7mm in Invar to Invar joint, and 1.5mm/8.0mm in Invar to stainless steel joint, respectively. These lap joints were mainly applied to the membrance fabrication of GT-LNG carrier. Fatigue tests of Invar/Inar lap joints were conducted under the stress ratio R=0 at room temperature. The effect of mean stress and cumulative fatigue damage on the allowable stress of Invar lap joint was evaluated on the basis of test results. Fatigue test was also conducted on Inver/Stainless steel lap joints welded by automatic TIG process without filler metals. The fatigue test of the joint was carried out under the same conditions as those of Invar/invar lap joints. The fatigue strength of the joint welded without filler metal was comparable to those welded with filler metal quoted from reference. The fatigue strength of Invar/stainless steel lap joint was only dependent on the lap throat thickness, and not on the welding process. Based on test results, the applicability of TIG welding process without filler metal in Invar/stainless steel lap joint was reviewed by controlling welding variables to assure the valid throat thickness of lap joints.

  • PDF

Strain-based Damage Evaluation of Specimens under Large Seismic Loads (대형 지진하중에 대한 시편의 변형률기반 손상평가)

  • Kweon, Hyeong Do;Heo, Eun Ju;Lee, Jong Min;Kim, Jin Weon
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.14 no.2
    • /
    • pp.24-31
    • /
    • 2018
  • In this paper, specimen tests with simulated large seismic conditions have been carried out to investigate damage characteristics such as structural deformation and crack initiation under seismic loading. The mechanical behavior of the specimens is predicted by numerical simulations and the strain-based damage evaluations are performed. Finite element analyses of the specimens under the simulated seismic loading at room and operating temperatures were carried out for low alloy steel and stainless steel materials. Peak strain amplitude, cumulative fatigue damage and cumulative strain limit damage are calculated considering the nature of cyclic loading. In all cases, the allowable damage criteria are exceeded at the time of observing cracks visually in the tests. Therefore, it is confirmed that the material behavior due to the large seismic loads can be predicted by the numerical method and the structural damage of the materials can be evaluated conservatively based on the strain criteria.

Analysis of Long-Term Performance of Geogrids by Considering Interaction among Reduction Factors (감소계수 상호영향을 고려한 지오그리드의 장기성능 해석)

  • Jeon, Han-Yong;Kim, Yuan-Chun;Jang, Yeon-Soo
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.7
    • /
    • pp.55-65
    • /
    • 2012
  • Total reduction factor that is used when calculating allowable tensile strength of geogrids is made by multiplying the installation damage reduction factor ($RF_{ID}$), chemical degradation reduction factor ($RF_D$), and creep reduction factor ($RF_{CR}$) etc. In case of a model estimating allowable tensile strength considering reduction factor over the short-term tensile strength of geogrids, it has a limit of not considering interaction force between reduction factors. Junction strength comes to be reduced by installation damages or chemical degradation in the same way as tensile strength. Single junction test method cannot properly test damaged samples and shows large deviations as it does not consider scale effect. Besides, regarding calculating shear strength, no reasonable study on reduction factors was conducted yet. Therefore, in this study, reduction factors that may affect the long-term performance of geogrids were revaluated considering various conditions and accurate long-term allowable tensile strength was calculated considering interrelation between reduction factors. Creep results after installation damage and chemical resistance test showed lower value than calculated value according to GRI GG-4. After the installation damage test and the chemical resistance test, the reduction factor of junction strength was less than that of tensile strength. Shear strength before and after installation damage showed no change or increase.

Effect of Surface Contaminants Remained on the Blasted Surface on Epoxy Coating Performance and Corrosion Resistance

  • Baek, Kwang Ki;Park, Chung Seo;Kim, Ki Hong;Chung, Mong Kyu;Park, Jin Hwan
    • Corrosion Science and Technology
    • /
    • v.5 no.1
    • /
    • pp.27-32
    • /
    • 2006
  • One of the critical issues in the coating specification is the allowable limit of surface contaminant(s) - such as soluble salt(s), grit dust, and rust - after grit blasting. Yet, there is no universally accepted data supporting the relationship between the long-term coating performance and the amount of various surface contaminants allowed after grit blasting. In this study, it was attempted to prepare epoxy coatings applied on grit-blasted steel substrate dosed with controlled amount of surface contaminants - such as soluble salt(s), grit dust, and rust. Then, coating samples were subjected to 4,200 hours of cyclic test(NORSOK M-501), which were then evaluated in terms of resistance to rust creepage, blistering, chalking, rusting, cracking and adhesion strength. Additional investigations on the possible damage at the paint/steel interface were carried out using an Electrochemical Impedance Spectroscopy(EIS) and observations of under-film-corrosion. Test results suggested that the current industrial specifications were well matched with the allowable degree of rust, whereas the allowable amount of soluble salt and grit dust after grit blasting showed a certain deviation from the specifications currently employed for fabrication of marine vessels and offshore facilities.