Subway widely used as a major mean of public transportation both at home and abroad contributes to ease chronic traffic congestion in cities. However, subway operating expense is expected to increase continuously because subway requires vast amount of money at the construction stage, huge sum of maintenance cost is spent during operation, and passenger needs for more convenient facilities is increasing. on the contrary to enormous operating expenses, fare that is occupying most of operating income doesn't come up to its prime cost causing chronic operating deficit. It is urgent to prepare fare system improvement measures to increase operating income in order to resolve financial difficulty of a subway operating organization. Therefore, the current study analyzed present condition and problems of subway fare system, and suggested improvement measures such as improvement of fare adjustment procedure, improvement of free-ride system, diversification of ticket, etc.
Proceedings of the Korean Institute of Building Construction Conference
/
2019.05a
/
pp.78-79
/
2019
A construction project with a total construction cost of over 10 billion KRW should be evaluated whether construction works are appropriately executed. The evaluation is carried out on quality management, process management, construction management, safety management, environmental management. The implementation period is within 60 days after completion of construction of the construction, from the time when the construction rate of the construction work has progressed by more than 90% to the construction cost. However, the participating construction engineers should prepare the evaluation within the period according to the evaluation criteria, but there are difficulties in preparation for the evaluation due to the reasons such as the change of engineers in charge and loss of data. Therefore, this study proposes the procedure of construction evaluation and adjusts timing of construction evaluation.
Journal of Construction Engineering and Project Management
/
v.7
no.3
/
pp.15-25
/
2017
The existence of material price volatility in construction projects puts forward substantial risks for all parties involved. Depending on the parties involved in the project, type of contracts, and state of the market various risk management strategies are practiced by contracting parties to manage project risks related to price volatility. Unfortunately, in many cases companies fail to select an adequate approach to better manage volatilities of material prices due to the lack of a decision support system to aid in the selection of an appropriate strategy based on the project characteristics. The aim of this study is to identify critical project factors and align them to documented strategies to manage price volatility based on an extensive literature review and industry interviews. This study found Integrated Project Delivery (IPD) as the ideal strategy with respect to project duration; quantitative risk management methods with respect to the cost; and Price Adjustment Clauses (PAC) with respect to the risk allocation, as the top price volatility management strategies.
Pharmacogenetics is opening a new era of precision medicine in psychiatry. Drug-metabolizing enzymes are characterized by genetic polymorphisms, which render a large portion of variability in individual drug metabolism. Dose adjustment based on pharmacogenetics knowledge is a first step to translate pharmacogenetics into clinical practice. However, diverse factors including cost-effectiveness should be addressed to provide clinical recommendation. To address current challenges in pharmacogenetics testing in psychiatry, this review provides an update regarding genotyping (SNP analysis, array, and next-generation sequencing), genotype-phenotype correlations, and cost-effectiveness. The current updates on pharmacogenetics in psychiatry will provide guidance for both clinician and researchers to have a consensus in harmonizing efforts to advance the pharmacogenetics field in a part of precision medicine in psychiatry.
The primary purpose of ITQ (individually transferable quota) is to reduce the overcapitalization problem in the open-access fishery. It has been argued that the least cost-efficient vessels under ITQ may exit first from the fishing by selling their quotas, thereby also reducing the excess capital. The purpose of this paper is to provide a case when ITQ may prompt the exit of less cost-inefficient vessels in the presence of irreversible exit cost which is proportional to the cost-inefficiency. Real option model is adopted in order to analyze the source of hysteresis associated with fishery exit decision. By linking the interaction between vessels' adjustment costs, cost-efficiency of harvest and uncertainty of fishery return, we show that cost-inefficient vessels will not exit always first from the fishery in contrast to the conventional wisdom. Relevant policy implications is discussed.
Chung, Seol Hee;Lee, Hye Jin;Oh, Ju-yeon;Woo, Kyung suk;Kim, Han sang
Health Policy and Management
/
v.25
no.2
/
pp.107-117
/
2015
Background: The purpose of this study is to analyze the cost for the denture treatment in accordance with the government's plan to expand the National Health Insurance coverage for dental prothesis from July 1, 2012. Methods: We developed the draft of classification of the treatment activities based on the existing researches and expert's review and finalized the standard procedures through confirming by Korean Dental Association. We also made the list of input at each stage of treatments. We conducted survey of 100 dental clinics via post from April 4 to May 20 in 2011 and 37 clinics took part in the survey. The unit of cost calculation is the process from the first visit for denture treatment to setting of denture and adjustment. The manufacturing process performed by dental technician was not included in the cost analysis. Results: The process for the complete denture treatment was classified with 10 stages. The partial denture treatment was classified with 8 stages. The treatment time per each denture is about 5.6 hours for complete dentures and about 6.6 hours for partial dentures. The treatment cost were from 591,108 won to 643,913 won for complete denture and from 670,219 won to 738,840 won for partial denture in 2011, depending on the location, type of the clinics and the types of physician's income. Conclusion: This study shows the example of cost analysis for the treatment to set the fee schedule. Measures to get representative and accurate information need to be made.
Proceedings of the Korean Statistical Society Conference
/
2004.11a
/
pp.179-184
/
2004
Statistical process control (SPC) and engineering process control (EPC) are based on different strategies for process quality improvement. SPC reduces process variability by detecting and eliminating special causes of process variation, while EPC reduces process variability by adjusting compensatory variables to keep the quality variable close to target. Recently there has been need for an integrated process control (IPC) procedure which combines the two strategies. This article considers a scheme that simultaneously applies SPC and EPC techniques to reduce the variation of a process. The process disturbance model under consideration is an IMA(1,1) model with a location shift. The EPC part of the scheme adjusts the process, while the SPC part of the scheme detects the occurrence of a special cause. For adjusting the process repeated adjustment is applied by compensating the predicted deviation from target. For detecting special causes the two kinds of exponentially weighted moving average (EWMA) control chart are applied to the observed deviations: One for detecting location shift and the other for detecting increment of variability. It was assumed that the adjustment of the process under the presence of a special cause may change any of the process parameters as well as the system gain. The effectiveness of the IPC scheme is evaluated in the context of the average cost per unit time (ACU) during the operation of the scheme. One major objective of this article is to investigate the effects of the process parameters to the ACU. Another major objective is to give a practical guide for the efficient selection of the parameters of the two EWMA control charts.
The amount of solar irradiation obtained by a photovoltaic (PV) solar panel is the major factor determining the power generated by a PV system, and the array tilt angle is critical for maximizing panel radiation acquisition. There are three types of PV systems based on the manner of setting the array tilt angle: fixed, semi-fixed, and tracking systems. A fixed system cannot respond to seasonal solar altitude angle changes, and therefore cannot absorb the maximum available solar radiation. The tracking system continually adjusts the tilt angle to absorb the maximum available radiation, but requires additional cost for equipment, installation, operation, and maintenance. The semi-fixed system is only adjusted periodically (usually seasonally) to obtain more energy than a fixed system at an overall cost that is less than a tracking system. To maximize semi-fixed system efficiency, determining the optimal tilt angle adjustment schedule are required. In this research, we conducted a simulation to derive an optimal operation schedule for a semi-fixed system in Seoul, Korea (latitude $37.5^{\circ}$). We implemented a solar radiation acquisition model and PV genereation model on MATLAB. The optimal operation schedule was derived by changing the number of tilt angle adjustments throughout a year using a Dynamic Algorithm. The results show that adjusting the tilt angle 4 times a year was the most appropriate. and then, generation amount of PV system increased 2.80% compared with the fixed system. This corresponds to 99% compared to daily adjustment model. This increase would be quite valid as the PV system installation area increased.
Objectives This study aims to develop Korean Medicine Clinical Pathway (CP) based on Clinical Practice Guideline of carpal tunnel syndrome to improve quality of treatment and reduce medical cost to maximize the quality of patient management. Methods A draft version of CP for carpal tunnel syndrome is developed by expert agreement and a prospective case study was carried out based on the draft CP. Twenty experts working at various medical institution answered validity verification survey of developed CP. Fifteen patients enrolled in the prospective case study answered survey on demand and satisfaction. Qualification and adjustment process of the draft CP was conducted based on results of both surveys. Results Final version of CP for carpal tunnel syndrome is confirmed after qualification and adjustment on the draft version. Conclusions CP for carpal tunnel syndrome will provide patients with standardized, high-quality Korean medicine treatment and also reduce financial burden of health insurance by reducing medical cost.
This study analyzes the cost fluctuation between cost in contract stage and cost in adjustment stage in defense R&D project. This research shows that certain costs hold with the cost fluctuation and their degree of influence. The results of first analysis show that 13 out of 17 costs have a relationship with the cost fluctuation. The estimate of direct labor cost is positive and significant at the 0.1% level(direct labor = 1.022, t = 38.355). The estimate of amount of cost paid to subcontractor is positive and significant at the 1% level(amount paid to subcontractor = 0.942, t = 51.894). The results of second analysis show that all the direct costs have a relationship with the cost fluctuation(The fact that cost system is focused on direct labor cost is a consideration in this analysis). The estimate of direct labor cost is positive and significant at the 0.1% level(direct labor = 2.014, t = 21.787). The estimate of amount of cost paid to subcontractor is positive and significant at the 0.1% level(amount of cost paid to subcontractor = 1.068, t = 15.636). This finding supports a proposal theory that cost system is focused on direct labor cost through actual proof analysis and an inducement that amount of cost paid to subcontractor is a way to reduce the R&D cost.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.