• Title/Summary/Keyword: a series of mining pits

Search Result 2, Processing Time 0.018 seconds

Experimental Study on the Adjustment Processes of a Series of Mining Pits in the Dredged Channels (준설하천에서 직렬로 배열된 웅덩이의 적응에 관한 실험적 연구)

  • Jang, Chang-Lae;Lee, Gi-Ha
    • Korean Journal of Ecology and Environment
    • /
    • v.44 no.4
    • /
    • pp.385-395
    • /
    • 2011
  • The adjustment processes and responses of a series of mining pits by sand or gravel mining were investigated by laboratory experiments. The filling processes of the two pits were affected by the bars developed in the upstream of the channel. However, the bars were not developed and the bed was degradated in the downstream of the pits due to little sediment flow, which was trapped in the pits. The submerged angle of repose in the pits was nearly constant when the pits were being filled. After the filling processes of the pits were finished, the pit was speedily filled with sediment, and the bed was aggradated and migrated with speed. However, the angle of repose decreased. As the distance between the upstream pit and the downstream pit increased, the bed of the pit downstream was tailcutted and degradated. The migration speed of the pit decreased. However, the dimensionless pit depth increased as the distance between the pits increased. The dimensionless pit depth increased with time.

An Interactive Planning and Scheduling Framework for Optimising Pits-to-Crushers Operations

  • Liu, Shi Qiang;Kozan, Erhan
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.1
    • /
    • pp.94-102
    • /
    • 2012
  • In this paper, an interactive planning and scheduling framework are proposed for optimising operations from pits to crushers in ore mining industry. Series of theoretical and practical operations research techniques are investigated to improve the overall efficiency of mining systems due to the facts that mining managers need to tackle optimisation problems within different horizons and with different levels of detail. Under this framework, mine design planning, mine production sequencing and mine transportation scheduling models are integrated and interacted within a whole optimisation system. The proposed integrated framework could be used by mining industry for reducing equipment costs, improving the production efficiency and maximising the net present value.