Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.17
no.6
/
pp.60-65
/
2003
In this paper, we analyzed theoretically design requirement of a clamp-type optical current transformer(COCT)head, and manufactured a COCT head based on design requirement. Also, we measured and analyzed the current of conductor, and change of optical power and sensitivity with incidence angle of light using COCT head, and demonstrated the feasibility of manufactured COCT through those experiments.
Journal of international Conference on Electrical Machines and Systems
/
v.3
no.3
/
pp.331-338
/
2014
When large penetration of the distributed generators (DGs) such as photovoltaic (PV) systems is growing up in grid system, it is important to quickly prevent islanding caused by power system fault to ensure electrical safety. We propose a novel active method for islanding prevention by harmonic injection synchronized with the exciting current harmonics of the pole transformer to avoid mutual interference between active signals. We confirm the validity of the proposed method by performing the basic tests of islanding by using a current source superimposed the harmonic active signal. Further, we carry out the simulation using PSCAD/EMTDC, and verify the fast islanding detection.
Kim, Dong-Su;Park, Nam-Ok;Kim, Chul-Hwan;Ryu, Jae-Nam
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.10
/
pp.1727-1732
/
2010
The Current transformer is classified measuring CT and protective CT for their purpose. The measuring CT is required to retain a specified accuracy over the normal range of load currents, but the protective CT must be capable of providing an adequate output over wide range of fault condition. Therefore, the protective CT must determine the transient performance during fault condition. This paper measured peak instantaneous error of the TPY class CT to determine the transient performance directly and indirectly and studied the test results.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.48
no.6
/
pp.342-348
/
1999
A new welding machine which adopts zero voltage and zero current switching(ZVZCS) full bridge(FB) DC-DC converter is proposed. The proposed ZVZCS FB DC-DC converter uses auxiliary transformer to obtain ZCS for leading leg. It has capability of controlling load current even in short circuit condition and is suitable for arc welding machines. The power rating of the auxiliary transformer is about one 5th to one 10th of the main transformer. Experimental results for 10KW prototype are shown to verify the principle of operation.
The Transactions of the Korean Institute of Electrical Engineers C
/
v.53
no.4
/
pp.213-217
/
2004
A current transformer(CT) used for the estabilishment of high current national standard, has generally very small ratio error and phase angle error. Both the errors of CT depend critically on the external burden used. When both the ratio and phase angle errors at two different burdens including zero burden are known, those at any other burdens are calculated theoretically. The theoretical values are well consistent with the experimental results within the $82{\times}10$-6, implying the measurement system of CT in KRISS is well maintained.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.48
no.3
/
pp.226-233
/
1999
Protective relay for transformer operates in general by comparing with the differential current and the restraint current. These kinds of currents are changed on magnitude and phasor during the fault according to winding type and vector group. This paper presents the differential and restraint currents and operational principle of differential protective relay for two-winding and three-winding transformer with graphical mode. It is developed using MATLAB for and educational purpose on engineer related in power system and protection in university and power utility including large factory.
By this time, Diode Rectifier or SCR has been used to gain DC Voltage for Electrolysis Power. Generally DC Voltage is produced from rectifier shall be transformed before rectifier using step-down transformer to obtain adaptable DC Voltage, rectifier output. In the same way, rectifier using SCR shall obtain output voltage after step-down voltage through transformer and control of the SCR firing angle. Transformer shall be used for this two methods to adjust the voltage. But the size and weight of the transformer are increased in accordance with the increase of capacity, and the hardships are accompanied in workspace or transportation. Besides, only the value of input voltage is possible to be regulated, and the expectation of current control is almost impossible during Electrolysis. This study has conducted Design and Simulation to reduce the size and weight of transformer and to be enable voltage and current control of Electrolysis power through high-speed switching using Inverter, Electronics device.
The digital substations are being built based on the IEC 61850 network. The cooperation and protection of power system are becoming more intelligent and reliable in the environment of digital substation. This paper proposes a novel method to prevent the malfunction caused by the Transformer Magnetizing Inrush Current(TMIC) using the IEC 61850 based data sharing between the IEDs. To protect a main transformer, the current differential protection(87T) and over-current protection(50/51) are used generally. The 87T IED applies to the second harmonic blocking method to prevent the malfunction caused by the TMIC. However, the 50/51 IED may malfunction caused by the TMIC. To solve that problem, the proposed method uses a GOOSE inter-lock signal between two IEDs. The 87T IED transmits a blocking GOOSE signal to the 50/51 IED, when the TMIC is detected. The proposed method can make a cooperation of digital substation protection system more intelligent. To verify the performance of proposed method, this paper performs the real time test using the RTDS (Real Time Digital Simulator) test-bed. Using the RTDS, the power system transients are simulated, and the TMIC is generated. The performance of proposed method is verified in real-time using that actual current signals. The reaction of simulated power system responding to the operation of IEDs can be also confirmed.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.17
no.1
/
pp.54-60
/
2003
Feeding traction loads from the public power system may lead to some current and voltage unbalance and consequently affects the operation of its energy-supply system and other equipment connected with it. This paper introduces an analysis of the current unbalance caused by the demands of an electric railway on a public power system. And the results with compensator and without compensator are simulated, and eventually the formula about the current unbalance is suggested. The Scott-connected transformer is adopted in Korea National Railway System. So Scott-connected transformer among the various transformer connection schemes is analyzed in this paper. Also, the formulas about the unbalance and compensating current can be derived by using two parameters(M-phase and T-phase current) of secondary Scott-connected transformer. So, the practical and accurate simulation can be done through dynamic models by using scheduling of traction.
The Transactions of the Korean Institute of Power Electronics
/
v.11
no.4
/
pp.340-348
/
2006
This paper proposes an inrush current control technique of matching transformer for configuration of dynamic voltage restorer(DVR). The DVR system consist of PWM inverter to inject arbitrary voltage, LC low pass filter as harmonic eliminator and matching transformer for isolation. However, the matching transformer has an excess of inrush current by magnetic flux saturation in the core. Due to this inrush current, the rating of matching transformers is double for needed nominal rating for protection of DVR. Therefore, in this paper, the modeling method of magnetic flux saturation is used to analyze a magnitude of inrush current, and additional current controller is used for PWM inverter output regulation. Simulation and experimental results are provided to demonstrate the validity of the proposed control method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.