This paper is a part from the series study on the 22.9KVY multiground destribution system and its is divided into three parts as follow. A.C. Network Analyzer study on the load current flow when one phase line of the feeder is out of seroice because of cutting. A.C. Network Analyzer study on the increasing zero sequence current in the good feeders when one feeder is under fault of single phase short. Field test report of the common use of open telephone line on same poles of 22.9KVY distribution system.
Park, Gun-Ho;Kang, Sang-Hee;Kim, Sok-Il;Shin, Jonathan H.
The Transactions of The Korean Institute of Electrical Engineers
/
v.61
no.3
/
pp.373-379
/
2012
This paper presents a fault location algorithm based on the adaptively estimated value of the local sequence source impedance for faults on a parallel transmission line. This algorithm uses only the local voltage and current signals of a faulted circuit. The remote current signals and the zero-sequence current of the healthy adjacent circuit are calculated by using the current distribution factors together with the local terminal currents of the faulted circuit. The current distribution factors consist of local equivalent source impedance and the others such as fault distance, line impedance and remote equivalent source impedance. It means that the values of the current distribution factors can change according to the operation condition of a power system. Consequently, the accuracy of the fault location algorithm is affected by the two values of equivalent source impedances, one is local source impedance and the other is remote source impedance. Nevertheless, only the local equivalent impedance can be estimated in this paper. A series of test results using EMTP simulation data show the effectiveness of the proposed algorithm. The proposed algorithm is valid for a double-circuit transmission line system where the equivalent source impedance changes continuously.
Park, C.W.;Kim, S.R.;Shin, M.C.;Nam, S.B.;Lee, B.K.
Proceedings of the KIEE Conference
/
2002.07a
/
pp.145-147
/
2002
In this paper, the improved fault locating method using distributed parameter which calculating the reduced voltage and current according to the ground capacitance in long transmission line was proposed. For the purpose of the fault locating algorithm non influenced source impedance, the loop method was used in the system modeling analysis. To enhance the fault locating, zero sequence of the fault current which is variable according to ground capacitance was not used but positive and negative sequence. System model was simulated using EMTP software. To verify the accuracy of proposed method, in different cases 64 sampled data per cycle was used and 160km and 300km long transmission line has fault resistance $0{\Omega}\;and\;100{\Omega}$ respectively was compared.
Three-phase four-wire electrical distribution systems are widely employed in manufacturing plants, commercial and residential buildings Due to the nonlinear loads connected to the distribution system, the neutral conductor carries excessive harmonic currents even under balanced loading since the triplen harmonics in phase currents do not cancel each other This may result in wiring failure of the neutral conductor and overloading of the distribution transformer In response to these concerns, a cost-effective neutral current harmonic suppressor system has been proposed. This paper proposes an improved control method for the harmonic suppressor system under unbalanced load conditions The proposed control method compensates for only the harmonic components in the neutral conductor, and the zero-sequence fundamental component due to unbalanced loading is prevented from flowing through the harmonic suppressor system This remedies overloading and power loss of the system The experimental results on a prototype validate the proposed control approach.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.51
no.10
/
pp.525-533
/
2002
It is common to install multiple lines in the same route. Recently, excessive sheath circulating current was partially measured in underground cable systems of KEPCO. Especially, the installation type, unbalance section length between joint boxes and zero sequence current by distribution cable have an effect on the rising of sheath circulating current in the underground transmission system. If excessive current flows in sheath, sheath loss which is reduced the transmission capacity is produced. This paper describes the relation analysis of sheath circulating current and burying types. And also, a detailed analysis on rising cause and characteristic of sheath circulating current by considering various unbalanced conditions presents using analysis and measurement regarding cable systems which have the problem of excessive sheath circulation current.
Park, Hyo-Sang;Park, Chang-Joo;Lee, Sang-il;Chung, Soo-Bok;Oh, Geum-Kon;Chung, Hun-Sang
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2003.11a
/
pp.279-281
/
2003
We analysed the operating properties of resistive type superconducting fault current limiters (SFCLs) based on YBCO thin films with a single line-to-ground fault. When a single line-to-ground fault occurred, the short circuit current of a fault phase increased up to about 6 times of transport currents immediately after the fault instant and was effectively limited to the designed current level within 2 ms by the resistance development of the SFCL. The fault currents of the sound phases almost did not change because of their direct grounding system. The unsymmetrical rates of a fault phase were distributed from 6.4 to 1.4. It was found that the unsymmetrical rates of currents were noticeably improved within one cycle after the fault instant. We calculated the zero phase currents for a single line-to-ground fault using the symmetrical component analysis. The positive sequence resistance was reduced remarkably right after the fault but eventually approached the balanced positive resistance component prior to the system fault. This means that the system reaches almost the three-phase symmetrical state in about 60 ㎳ after the fault. The ground currents were almost 3 times of the zero phase mts since most of the fault currents flowed through the grounding line.
Fault current is flowed into 154/23kV M. Tr when line-to-ground fault occurs in power system. NGR(Neutral Grounded Reactor) is set up in order to prevent M.Tr fault by limiting magnitude of fault currents. Here, disconnection of NGR causes voltage increase by L-C resonance and line-to-ground fault in an unearthed system results in voltage increase at healthy phases. So Over Voltage Ground Relay(OVGR) is used for tripping M.Tr. Also, buses at second phases of M.Trs are all connected with section circuit breakers closed for the purpose of parallel operation and load shedding. In case of speciality buses are comprised of power cable in part for GIS connection. When no-load charged cable or bus is open by a section CB, unbalanced voltage charged on the bus is induced. Also discrepant opening time for circuit breakers on different phases gives rise to unbalanced zero sequence voltage. It was observed that this zero sequence voltage detected in the 22.9kV P.T (Potential Transformer for bus) mal-operated 59GT and tripped M.Tr. The zero sequence voltage of which vanishing time is longer than relay operating time came out by EMTDC simulation. Also, it was shown that the voltage waves of actual test are similar to those of simulation. On the basis of above results, R-C circuit complement on the relay without any effect on a power system made operating time of the relay longer than vanishing time of distorted waves. Consequently, operating time of the relay was delayed and magnitude of distorted waves was decreased by increasing time constant of the relay.
The BEF on the radial distribution line refers to a class of ground faults in which the load-side power line only is grounded, with the distribution line broken into two parts, the source-side and the load-side. Because its mechanism is remarkably different from that of other earth faults, the fault current is very low, and then difficult to detect the BEF. Thus, it is necessary to analyze its properties and to find an appropriate method that can economically protect the BEF of nonautomation area in the substation. As a result of analyzing the BEF data obtained by the RTDS, EMTP simulation, and the field test data of ETSA, we believe that it is the dominant factor in distinguishing the BEF from normal conditions by a criterion value that is appropriately handled from the zero-sequence current. Thus, with this criterion value, a BEF detecting algorithm is constructed which measures the variations of the zero-sequence current and processes then properly so as to make the fault decision. To prove the accuracy of this algorithm, it is compared with the field test data of ETSA under various conditions. The results show that the proposed algorithm is accurate.
Fault location algorithms based on the current distribution factors under the one-phase to earth fault condition of a double-circuit line are presented. The derivation method for current distribution factors is showed, to calculate fault current, fault resistance and the zero sequence current of other parallel circuit which are unknown. As the proposed algorithms 1,2,3 embodies an accurate location by the voltage and the current of the relaying point.
Talib, Md. Hairul Nizam;Ibrahim, Zulkifilie;Rahim, Nasrudin Abd.;Hasim, Ahmad Shukri Abu
Journal of Power Electronics
/
v.13
no.5
/
pp.806-813
/
2013
This paper aims to compare the performance of three phase induction motor drives using Five Leg Inverter (FLI) and Three Leg Inverter (TLI) configurations. An Indirect Field Oriented Control (IFOC) method using a TLI is well established and incorporated for high performance speed drives in various industries. The FLI dual motor drive system on the other hand shows good workability in the independent control of two induction motor drives simultaneously. In this experiment, the IFOC method is utilized for both drive systems, and Space Vector Pulse Width Modulation (SVPWM) is used to generate pulses for both inverters. For the FLI, the Double Zero Sequence (DZS) Injection technique is used to generate the modulation signal. The complete experiment setup is done by using a DSpace 1103 controller board. The individual motor performances are analyzed using similar schemes, equipment setups and controller parameter values. The results show similar speed performance response capability between the single motor operation using a TLI system and the two motor operation using a FLI system based on the variable speed range either in forward or reverse operation. They also show similar load rejection abilities. However, the single motor with a TLI has a better power quality aspect such as ripple current and total harmonics distortion (THD).
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.