• Title/Summary/Keyword: Ye-Kim

Search Result 3,153, Processing Time 0.029 seconds

A Study on the Estimating Strategy for the Design Phase VE Consulting Fee (설계VE 용역대가 산정방안에 관한 연구)

  • Kim Chul-Woong;Jung Young Il;Kim Yang-Taek;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.97-106
    • /
    • 2002
  • at the design phase and the effective design phase VE application, it is not sufficient to implement VE study at the design phase in the domestic construction industry. The method for estimating design phase VE consulting Fee regulated in current guideline and the insufficient incentive system according to the result of design phase VE application are major problems among the problems related to the roadblock of the active implementation Design phase VE. In this paper, firstly the current methods for estimating Engineering business consulting fee analogous to design phase VE and the domestic and foreign design VE consulting fee were examined, and detailed problems related to the method for estimating design VE consulting fee were indicated, and the Improvement direction were established. Secondly, the estimating strategy for the design phase VE consulting fee and the payment strategy of incentive according to the result of savings were proposed. Finally, the strategies were verified by interview with the experts.