• Title/Summary/Keyword: Workspace Modeling

Search Result 35, Processing Time 0.031 seconds

Gait Estimation System for Leg Diagnosis and Rehabilitation using Gyroscopes (하지 진단 및 재활을 위한 각속도계 기반 측정시스템)

  • Lee, Min-Young;Lee, Soo-Yong
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.16 no.9
    • /
    • pp.866-871
    • /
    • 2010
  • Gait analysis is essential for leg diagnosis and rehabilitation for the patients, the handicapped and the elderly. The use of 3D motion capture device for gait analysis is very common for gait analysis. However, this device has several shortcomings including limited workspace, visibility and high price. Instead, we developed gait estimation system using gyroscopes. This system provides gait information including the number of gaits, stride and walking distance. With four gyroscope (one for each leg's thigh and calf) outputs, the proposed gait modeling estimates the movements of the hip, the knees and the feet. Complete pedestrian localization is implemented with gait information and the heading angle estimated from the rate gyro and the magnetic compass measurements. The developed system is very useful for diagnosis and the rehabilitation of the pedestrian at the hospital. It is also useful for indoor localization of the pedestrians.

Healing of STEP AP214 Automotive CAD Data (STEP AP214 자동차 설계 데이터 정리 시스템)

  • 양정삼;한순흥
    • Korean Journal of Computational Design and Engineering
    • /
    • v.7 no.3
    • /
    • pp.170-176
    • /
    • 2002
  • To exchange CAD data between heterogeneous CAD systems, we generally use a neutral format especially STEP, which is the international standard (ISO-10303) for product model data exchange. AP214 (Application Protocol) for the automotive industry not only takes into account geometry and organizational data, but also provides a classification mechanism for product modeling. When reading a STEP file during a design process that is exported from other CAD systems, it is a burden to a designer to go through the tedious process of removing duplicate or non-manifold entities, adjusting parts, and rearranging text. We analyze the structure of AP214 and develop a healing tool to solve the following problem. Without the assembly information in the Master workspace of CATIA, or to read a STEP file from Pro/Engineer, a designer should do a repetitive process of disintegrating an assembly into parts one by one. We have developed a post-processing tool for STEP AP214 that separates out a part from an assembly model and adjusts superfluous or useless entities using the ACIS kernel.

Spray Modeling: An Augmented Reality Based Tangible 3D Modeling Interface (스프레이 모델링: 증강현실 기반의 실체적인 3차원 모델링 인터페이스 제안)

  • Jung, Hee-Kyoung;Nam, Tek-Jin
    • Archives of design research
    • /
    • v.18 no.4 s.62
    • /
    • pp.119-128
    • /
    • 2005
  • This paper presents an intuitive 3D modeling interlace based on a field study and prototype development. The process and tools of modeling were observed in workshops of professional design model making, day modeling, wood caning and glass crafting. The Spray Modeling interlace was developed from the observational analysis of the field study. It is a 3D modeling interface which combines particle spraying and day modeling in Virtual or Augmented Reality space. Virtual volume particles are sprayed on frames in Augmented Reality space as day modeling. It adopts a real air spay gun as a tangible interface device which provides coherent sound and air-force feedback. The prototype development and a user study showed that the interface supports new patterns of form development and expression. Control interfaces and requirements of auxiliary devices were found to be improved. This study examines the potential of the new interlace for designers working in 3D virtual and augmented reality. The new spraying interface is also expected to be used as an alternative interface in 3D computer workspace, games, education software and media art.

  • PDF

Spatiotemporal chronographical modeling of procurement and material flow for building projects

  • Francis, Adel;Miresco, Edmond;Le Meur, Erwan
    • Advances in Computational Design
    • /
    • v.4 no.2
    • /
    • pp.119-139
    • /
    • 2019
  • Planning and management building projects should tackle the coordination of works and the management of limited spaces, traffic and supplies. Activities cannot be performed without the resources available and resources cannot be used beyond the capacity of workplaces. Otherwise, workspace congestion will negatively affect the flow of works. Better on-site management allows for substantial productivity improvements and cost savings. The procurement system should be able to manage a wider variety of materials and products of the required quality in order to have less stock, in less time, using less space, with less investment and avoiding multiple storage stations. The objective of this paper is to demonstrate the advantages of using the Chronographic modeling, by combining spatiotemporal technical scheduling with the 4D simulations, the Last Planner System and the Takt-time when modeling the construction of building projects. This paper work toward the aforementioned goal by examining the impact that material flow has on site occupancy. The proposed spatiotemporal model promotes efficient site use, defines optimal site-occupancy and workforce-rotation rates, minimizes intermediate stocks, and ensures a suitable procurement process. This paper study the material flow on the site and consider horizontal and vertical paths, traffic flows and appropriate means of transportation to ensure fluidity and safety. This paper contributes to the existing body of knowledge by linking execution and supply to the spatial and temporal aspects. The methodology compare the performance and procurement processes for the proposed Chronographic model with the Gantt-Precedence diagram. Two examples are presented to demonstrate the benefits of the proposed model and to validate the related concepts. This validation is designed to test the model's graphical ability to simulate construction and procurement.

Development of a Real Time 3D Collaboration and Part Information Brokering System Using WWW(World Wide Web) (웹을 이용한 실시간 3차원 공동작업 부품정보중개시스템 개발)

  • 최영상;김영호
    • Korean Journal of Computational Design and Engineering
    • /
    • v.4 no.2
    • /
    • pp.87-99
    • /
    • 1999
  • We developed a Part Information Brokering System, namely PIBS, that can inter-link part suppliers and buyers using WWW(World Wide Web). The major contribution of this paper is that the system provides a 3D collaboration environment that enables multiple users to share the same workspace where they cooperatively manipulate part features in real time. PIBS carries out two major functions: one to maintain part data in a part library, and the other to provide the means for the clients to cooperate. An object-oriented database is used for the part library which stores apart information registered by part suppliers. VRML(Virtual Reality Modeling Language) the ISO standard for 3D visualization on WWW, is used to represent 3D part models. Several Java programs have been implemented to support synchronous and a synchronous communication of the 3D models. Once the users are interconnected through the system, a user's manipulation of part objects is transparently and instantaneously transmitted to the others. This means that all the participants can are the same view and movement of the 3D part models. Since the system is developed using a Java applet-server architecture, it requires no additional software other than standard web browser. The prototype system has been successfully implemented, and demonstrated its applicability to virtual 3D part information sharing.

  • PDF

A Study on the Obstacle Avoidance of a Robot Manipulator by Using the Neural Optimization Network (신경최적화 회로를 이용한 로봇의 장애물 회피에 관한 연구)

  • 조용재;정낙영;한창수
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.17 no.2
    • /
    • pp.267-276
    • /
    • 1993
  • This paper discusses the neural network application in the study on the obstacle avoidance of robot manipulator during the trajectory planning. The collision problem of two robot manipulators which are simultaneously moving in the same workspace is investigated. Instead of the traditional modeling method, this paper processing based on the calculation of joint angle in the cartesian coordinate with constrained condition shows the possibility of real time control. The problem of the falling into the local minima is cleared by the adaptive weight factor control using the temperature adding method. Computer simulations are shown for the verification.

A Generalized Volumetric Error Modeling Considering Backlash in Machine Tools (방향성을 고려한 일반화된 공작기계의 입체오차 모델링)

  • Ahn, Kyoung-Gee;Cho, Dong-Woo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.19 no.4
    • /
    • pp.124-131
    • /
    • 2002
  • In this paper, an extended volumetric error model considering backlash in a three-axis machine tool was proposed and utilized for calculating the volumetric error of the machine tool at any position in three-dimensional workspace. Backlashes are interrelated; i.e. the angular backlash affects the straightness errors which then affect talc calculated squareness errors. Therefore, a new concept was introduced to define the backlash of squareness errors to incorporate the backlash of squareness error into the volumetric error, and the characteristics of the backlash of squareness error were investigated. The effects of backlash errors were assessed, by experiments. for 21 geometric errors of a machine tool. The backlash error was shown to be one of the systematic errors of a machine tool. And a generalized volumetric error model formulator for three-axis machine tools was developed, which allowed us to formulate machine tool synthesis error models far all possible machine tool configurations only with machine tool topology information. Based on these volumetric error model and model formulator, a computer-aided volumetric error analysis system was developed for a three-axis machine tool in this paper. Then the volumetric error at an arbitrary position can be obtained, and displayed in a three-dimensional graphic form.

3D Workspace Modeling Based on Context Understanding for Robotic Manipulation (컨텍스트 이해를 통한 로봇의 작업을 위해 필요한 3D 작업공간 모델링)

  • Kim, Eun-Young;Lee, Suk-Han;Jang, Dae-Sik;Han, Jung-Hyun
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2005.05a
    • /
    • pp.1619-1622
    • /
    • 2005
  • 본 논문에서는 로봇이 작업을 계획하기 위해 필요한 3차원 작업 공간을 세 가지의 컨텍스트(context)들을 이해함으로써 빠르게 모델링하는 새로운 기법을 소개 하고 있다. 로봇이 사람과 비슷한 속도와 정확도로 작업 공간을 이해하고 모델링하는 것에 초점을 두고 있으며 이를 위해 작업 공간상의 특징적인 세 가지의 컨텍스트(작업공간의 간략화를 위한 전체 공간상의 평면특징, 데이터베이스에 미리 정의된 물체 그리고 로봇의 주어진 작업에 따라 다양한 상세함을 갖는 그 외의 장애물)를 정의하였고, 그것들을 빠르게 이해함으로써 어떻게 3차원 작업 공간을 형성하는지 설명하고 있다. 본 논문에서 3 차원 정보를 갖는 scale invariant feature transformation(SIFT)를 stereo-sis SIFT 로 간주했으며 이를 이용하여 위에서 언급한 컨텍스트들을 이해하였고 다양한 카메라의 위치로부터 얻어지는 여러 개의 장면들을 정합하였다. 또한, 실험을 통해 제안한 방법의 타당성도 검증하였다.

  • PDF

A Study on the Selection and Applicability Analysis of 3D Terrain Modeling Sensor for Intelligent Excavation Robot (지능형 굴삭 로봇의 개발을 위한 로컬영역 3차원 모델링 센서 선정 및 현장 적용성 분석에 관한 연구)

  • Yoo, Hyun-Seok;Kwon, Soon-Wook;Kim, Young-Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2551-2562
    • /
    • 2013
  • Since 2006, an Intelligent Excavation Robot which automatically performs the earth-work without operator has been developed in Korea. The technologies for automatically recognizing the terrain of work environment and detecting the objects such as obstacles or dump trucks are essential for its work quality and safety. In several countries, terrestrial 3D laser scanner and stereo vision camera have been used to model the local area around workspace of the automated construction equipment. However, these attempts have some problems that require high cost to make the sensor system or long processing time to eliminate the noise from 3D model outcome. The objectives of this study are to analyze the advantages of the existing 3D modeling sensors and to examine the applicability for practical use by using Analytic Hierarchical Process(AHP). In this study, 3D modeling quality and accuracy of modeling sensors were tested at the real earth-work environment.

Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project- (건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로-)

  • Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.11-24
    • /
    • 2012
  • Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects.