• Title/Summary/Keyword: Work scope

Search Result 609, Processing Time 0.023 seconds

Finding Pluto: An Analytics-Based Approach to Safety Data Ecosystems

  • Barker, Thomas T.
    • Safety and Health at Work
    • /
    • v.12 no.1
    • /
    • pp.1-9
    • /
    • 2021
  • This review article addresses the role of safety professionals in the diffusion strategies for predictive analytics for safety performance. The article explores the models, definitions, roles, and relationships of safety professionals in knowledge application, access, management, and leadership in safety analytics. The article addresses challenges safety professionals face when integrating safety analytics in organizational settings in four operations areas: application, technology, management, and strategy. A review of existing conventional safety data sources (safety data, internal data, external data, and context data) is briefly summarized as a baseline. For each of these data sources, the article points out how emerging analytic data sources (such as Industry 4.0 and the Internet of Things) broaden and challenge the scope of work and operational roles throughout an organization. In doing so, the article defines four perspectives on the integration of predictive analytics into organizational safety practice: the programmatic perspective, the technological perspective, the sociocultural perspective, and knowledge-organization perspective. The article posits a four-level, organizational knowledge-skills-abilities matrix for analytics integration, indicating key organizational capacities needed for each area. The work shows the benefits of organizational alignment, clear stakeholder categorization, and the ability to predict future safety performance.

A STUDY OF USING CKKS HOMOMORPHIC ENCRYPTION OVER THE LAYERS OF A CONVOLUTIONAL NEURAL NETWORK MODEL

  • Castaneda, Sebastian Soler;Nam, Kevin;Joo, Youyeon;Paek, Yunheung
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2022.05a
    • /
    • pp.161-164
    • /
    • 2022
  • Homomorphic Encryption (HE) schemes have been recently growing as a reliable solution to preserve users' information owe to maintaining and operating the user data in the encrypted state. In addition to that, several Neural Networks models merged with HE schemes have been developed as a prospective tool for privacy-preserving machine learning. Those mentioned works demonstrated that it is possible to match the accuracy of non-encrypted models but there is always a trade-off in the computation time. In this work, we evaluate the implementation of CKKS HE scheme operations over the layers of a LeNet5 convolutional inference model, however, owing to the limitations of the evaluation environment, the scope of this work is not to develop a complete LeNet5 encrypted model. The evaluation was performed using the MNIST dataset with Microsoft SEAL (MSEAL) open-source homomorphic encryption library ported version on Python (PyFhel). The behavior of the encrypted model, the limitations faced and a small description of related and future work is also provided.

Extension of IFC information Modeling for Fire Safety based on WBS (작업분류체계 기반 소방 객체 IFC 정보 모델링 확장 방안 연구)

  • Won, Junghye;Kim, Taehoon;Choo, Seoungyeon
    • Journal of KIBIM
    • /
    • v.13 no.2
    • /
    • pp.37-46
    • /
    • 2023
  • The main objective of this study is to propose a method to enhance building safety using the Industry Foundation Classes (IFC) schema in Building Information Modeling (BIM). To achieve this goal, a fire object relationship diagram is created by using the Model View Definition (MVD) and Property Set (Pset) methodology, as well as the Work Breakdown Structure (WBS) based object relationship analysis. The proposed method illustrates how to represent objects and tasks related to fire prevention and human safety during a building fire, including variables that are relevant to these aspects. Furthermore, the proposed method offers the advantage of considering both the IFC object hierarchy and the project work hierarchy when creating new objects, thereby expanding the attribute information for fire safety and maintenance. However, upon confirmation via an IFC viewer after development, a problem with the accuracy of mapping between attributes and objects arises due to the issue of proxy representation of related object information and newly added object information in standard IFC. Therefore, in future research, a mapping method for fire safety objects will be developed to ensure accurate representation, and the scope of utilization of the fire safety object diagram will be expanded. Furthermore, efforts will be made to enhance the accuracy of object and task representation. This research is expected to contribute significantly to the technological development of building safety and fire facility design in the future.

Development of Standard Estimates for Garden Construction: Focused on Planting

  • Hong, Kwang-Pyo;Lee, Hyukjae
    • Journal of People, Plants, and Environment
    • /
    • v.22 no.5
    • /
    • pp.467-480
    • /
    • 2019
  • Standard estimates are the numerical data of a unit quantity required for construction work such as the amount of materials, manpower, and the use of equipment required and are also a basis to calculate construction costs. Unfortunately, standard estimates for construction have also been used for garden construction these days as no standard estimates for garden construction have been developed or documented until now. As a result, many problems have arisen at garden construction sites since landscape construction and garden construction differ in terms of scope, size, design and construction methods. The purpose of this study was to develop standard estimates for garden construction for proper calculation of the cost of garden construction and to ensure gardens are created following appropriate construction processes. In order to develop standard estimates for garden construction, a preliminary survey was conducted on experts to understand current issues at first. After that, a questionnaire survey was done to examine problems of construction processes and ways of improvement, and on-site inspections were conducted utilizing CCTVs at construction sites to identify the actual amount of manpower required on site. Based on the results of the surveys and on-site inspections, a draft version of standard estimates for 5 types of planting work for garden construction was developed. Developing standard estimates for garden construction will serve as a stepping stone for the transparent and proper compensation for garden construction work, which will not only contribute to addressing issues between consumers and construction companies, but also to the stabilization of market economy and job creation.

A COMPARATIVE STUDY OF CAUSES AND EFFECTS OF PROJECT DELAYS AND DISRUPTIONS IN CONSTRUCTION PROJECTS IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY

  • Oshungade, Oluwaseun O.;Kruger, Deon
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.1
    • /
    • pp.13-25
    • /
    • 2017
  • Construction projects have been observed to have problems of project delays and disruptions and the South African construction industry is not an exception. This research identified causes and effects of project delay and disruption through a desktop study. Subsequently, a questionnaire was designed and used to conduct a survey to obtain the views of the three main construction project participants - clients, consultants, and contractors. The questionnaire contains 48 causes and 13 effects of project delay and disruption identified from the desktop study. This research identified sixteen most important causes of project delay and disruption and five most important effects of delay and disruption. Sixteen most important causes were: (1) strikes, (2) rework due to errors during construction, (3) shortage of materials in market, (4) suspension of work by the client, (5) poor communication between the parties, (6) ineffective planning and scheduling of project, (7) delays in issuing working drawings, (8) mistakes and discrepancies in design documents, (9) shortage of labours and equipment, (10) delay in decision making process by the client, (11) unforeseen ground conditions, (12) unclear and inadequate details in drawing, (13) inadequate contractor's experience, (14) delay in approving changes in the scope of works, (15) delay in material delivery and (16) unacceptable quality of materials. The five major effects include: (1) create stress on contractors, (2) cost overrun, (3) time overrun, (4) poor quality of work due to rush, and (5) disputes. Furthermore, the result of this research was compared with the result of previous studies conducted in other regions of Africa in terms of causes and effects of project delay and disruption. The research concludes that numerous causes and effects of delay and disruption are limited to South African construction projects based on the comparison. The causes limited to South African construction projects include: (1) strikes, (2) suspension of work by the client (3) mistakes and discrepancies in design documents (4) delay in approving changes in the scope of works and (5) unacceptable quality of materials, while the two major effects limited to South African construction projects includes: (1) create stress on contractors and (2) poor quality of work. In conclusion, some recommendations were made in order to minimise the causes of delay and disruption identified.

A Study for its Characteristics with Electric Variation in an Electrical Discharge Machining (방전가공에서 전기적 변화가 갖는 방전 특성에 관한 연구)

  • 신근하
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.6 no.4
    • /
    • pp.72-79
    • /
    • 1997
  • A study is a experiment which is figure out to optimum discharge cutting condition of the surface roughness, electronic discharging speed and electrode wear ration with Ton , Toff and V(voltage) as an input condition according to the current(Ip) in an electric spark machine : 1) Electrode is utilized Cu and Graphite. 2) Work piece is used the material of carbon steel. The condition of experiment is : 1) Current is varied 0.7(A) to 50(A) and the time of electric discharging to work piece in each time is 30(min) to 60(min). 2) After the upper side of work piece was measured in radius(5$\mu$m) of stylus analyzed the surface roughness to ade the table and graph of Rmax by yielding data. 3) Electro wear ratio is : \circled1Cooper was measured ex-machining and post-machining by the electronic balance. \circled2The ex-machining of graphite measured by it, the post-machining was found the data from volume $\times$specific gravity and analyzed to made its table and graph on ground the data. 4) In order to keep the accuracy of voltage affected to the work piece was equipped with the A.V. R and the memory scope was sticked to the electric spark machine. 5) In order to preserve the precision of current, to get rid of the noise occured by internal resistance of electric spark machine and to force injecting for the discharge fluid , it made the fixed table for a work piece to minimize the work error by means of one's failure during the electric discharging.

  • PDF

Evaluation of Machining Characteristics through Wire-Cut EDM of Brass and SKD 11 (황동과 금형강의 와이어 컷 방전가공을 통한 가공특성 평가)

  • 김정석
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.6 no.4
    • /
    • pp.130-137
    • /
    • 1997
  • The demand for wire-cut EDM is increasing rapidly in the die and tool making industry. In this study machining characteristics such as machining rate, surface roughness, hand drum form and hardness of machined material are investigated experimentally under the conditions varing pulse on time, pulse off time, peak voltage, wire tension after fixing other conditions in SKD 11 and brass and brass workpiece. It was found that various operating conditions had significant influences on machining characteristics. But the hardness of workpiece was uneffected by operating conditions. Also it was obtained experimentally that brass workpeice had better machinability than SKD 11 one.dition according to the current(Ip) in an electric spark machine : 1) Electrode is utilized Cu and Graphite. 2) Work piece is used the material of carbon steel. The condition of experiment is : 1) Current is varied 0.7(A) to 50(A) and the time of electric discharging to work piece in each time is 30(min) to 60(min). 2) After the upper side of work piece was measured in radius(5$\mu$m) of stylus analyzed the surface roughness to ade the table and graph of Rmax by yielding data. 3) Electro wear ratio is : \circled1Cooper was measured ex-machining and post-machining by the electronic balance. \circled2The ex-machining of graphite measured by it, the post-machining was found the data from volume $\times$specific gravity and analyzed to made its table and graph on ground the data. 4) In order to keep the accuracy of voltage affected to the work piece was equipped with the A.V. R and the memory scope was sticked to the electric spark machine. 5) In order to preserve the precision of current, to get rid of the noise occured by internal resistance of electric spark machine and to force injecting for the discharge fluid , it made the fixed table for a work piece to minimize the work error by means of one's failure during the electric discharging.

  • PDF

A study for its Characteristics with Electric Variation in an Electrical Discharge Machining (방전가공에서 전기적 변화가 갖는 방전 특성에 관한 연구)

  • 신근하
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 1996.03a
    • /
    • pp.132-136
    • /
    • 1996
  • A Study is a experiment which is figure out to aptimum discharge cutting condition of the surfaceroughness, electric discharging speed and electro wear ratio with Ton Toff and V(voltage) as an input condition according to the current(Ip) in an electric spark machine ; 1)Electrode is utilized Cu(coper) and Graphite. 2)Work piece is used the material of carbon steel. The condition of experiment is; 1)Current is varied 0.7(A) to 50(A). 2)Pulse time(Ton) is varied 3($\mu$s) to 240($\mu$s) and also Toff is varied 7($\mu$s) to 20($\mu$s). 3)The time of electric discharging to work piece in each time is 30(min) to 60(min) 4)After the upper side of work piece was measured in radius (5${\mu}{\textrm}{m}$) of syulus analyzed the surface roughness to made the table and graph of Rmax by yielding data. 5)Electro wear ratio is; \circled1Coper was measured cx-machining and post machining but the electronic baiance. \circled2The ex-machining of graphite measured by it, the post-machining was found the data from volume specific gravity and analyzed to made its table and graph on ground the data 6)In order to keep the accuracy of voltage affected to the work piece was equipped with the A.V.R(Automatic Voltage Regulator). 7)The memory scope was sticked to the electric spark machine. 8)In order to preserve the precision of current, to get rid of the noise occured by internal resistance of electric spark machine and to force injecting for the discharge fluid, it made the fixed table for a work piece to minimize the work error by means of one's failure during the electric discharging According to above results, the surface roughness by the variation of electrodw and current was analyzed to compare KS(Korea Standards) It was decided the optimum condition of electric discharge cutting through analyzing the effect of electric discharge speed and electro wear ratio.

  • PDF

Effects of Self-Efficacy on Jop-Stress and Work-Life Balance: Focusing on Using Structural Equation Model (자기 효능감이 직장 스트레스 및 워라밸에 미치는 영향: 구조방정식모델 활용을 중심으로)

  • Han, Seung Jo;Lee, Se Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.679-687
    • /
    • 2020
  • This study quantitatively analyzed the effects of self-efficacy in the workplace on job-stress and work-life balance (WLB) using a structural equation model (SEM) to seek ways to increase the WLB. Because the current government promotes the 52-hour weekly policy, WLB that refers to the balance between work and life that is used throughout society. In addition, self-efficacy, which was used mainly in the home and education system, has expanded its scope of application, and efforts to increase it in the workplace are working as demand for the times. The observation variables to be included in the SEM were collected from a questionnaire of 5,454 adults, and AMOS 21 was used for statistical analysis. As a result of the analysis, self-efficacy in the workplace has a negative correlation with stress, and a higher self-efficacy means a higher WLB. The results of this study did not show that the more workers are passionate about their work in the workplace due to work-oriented thinking and behavior rather than home had a lower WLB. In addition, these results can be used to analyze the WLB policy in the ROK Army.

A Study on Landscaping Repair Work Classifications in Cultural Heritage Industry (문화재 수리의 조경분야 공종 분류에 관한 연구)

  • Kim, Min-Seon;Lee, Jae-Yong;Kim, Choong-Sik
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.59-66
    • /
    • 2022
  • The purpose of this study was to suggest the landscaping repair work classification, the standard for securing the independence of and establishing the scope of landscaping repair works. Standard construction specifications currently specify the landscaping repair work classification around the planting construction, while standard work estimate does not include the field of landscaping. The landscaping construction specifications and the standard work estimate in the construction industry should be, however, applied, so it is difficult to specifically understand what is the landscaping repair work classification in the cultural heritage industry. From 1961 to 1980, not only the tree planting but also a variety of landscaping facilities had been specified as the landscaping repair works, and it was found that all of these work classifications are established as the landscaping repair work classifications in the construction industry. A total of 20 work classifications were verified by comprehensively arranging those specified in notices of tender for working drawing services for cultural heritages during three years, from 2018 to 2020, except for those for the maintenance and Dancheong of architectures, plant protection and conservation. All 20 work classifications corresponded to the landscaping work classifications in the construction industry. On the basis of the landscaping work classifications in the construction industry, this study divided the landscaping repair work classifications into site-building and shaping, planting work, facility construction, paving work, ecological landscape architectural construction and vegetation maintenance, by considering the specialty of cultural heritage space.