• Title/Summary/Keyword: Work manager

Search Result 532, Processing Time 0.027 seconds

A Study on HPMA System for Establishment of Voluntary Safety Management (자율 안전 관리 정착을 위한 HPMA System에 관한 연구)

  • 목연수;이동훈;장성록;김승한;이영섭
    • Journal of the Korean Society of Safety
    • /
    • v.11 no.2
    • /
    • pp.128-135
    • /
    • 1996
  • The aim of this study is that HPMA(Hazard Potentials in My Areas) System is to present for establishment of the voluntary safety management on industrial region. HPMA System Itself means that manager, supuryisor and worker on process-line find out the hazardous and/or unsafe potentials from their work places and make the plan of improvement by means of mutual communication with top manager and the department of safety staff, eventually put in the practice. In case that it takes the longer time to improve hazard potentials and is impossible improvement by existing technique, appropriate check-list will be used by the worker himself on the identified production line. Form this system, therefore, it makes them to get more and more sensitivity to the hazards. In this study, we present the voluntary safety management system which is controlable systematically and in the final analysis the direction of safety management by computerization of HPMA System which is activated in their work places.

  • PDF

CHECKLIST FOR ENVIRONMENTAL FRIENDLY CONSTRUCTION MANAGEMENT IN DESIGN PHASE

  • In-Su Jung;Hyun-Su Park;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.376-385
    • /
    • 2007
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment preservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. For the building or construction project, its possible impact on environment during construction work and after completion must be predicted at its design phase, which will result in the completion of the architecture convenient for human being with its environmental pollution reduced to minimum level. In this study, the checklist of environmental factors was suggested, which should be taken into account at its design phase in conducting the construction work. Proposed checklist was linked with the developed web-based system for the convenience of users like designer and construction manager, etc. It is expected that the checklist suggested by this study will help the designer and construction manager to continue the steady development from the environmental viewpoint during the design phase.

  • PDF

Practice of Health Managers and Workers according to Guidance of Work Environment Management of Specialized Health Management Institution (보건관리전문기관의 작업환경관리 지도에 따른 일부 지역 사업장 보건업무담당자와 근로자의 실천도)

  • Kim, Yunhee
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.26 no.2
    • /
    • pp.198-209
    • /
    • 2016
  • Objectives: This study aimed to provide basic data for the improvement of the guidance services for the management of the workplace environment of the specialized health management institution, by making inquiries on the perception and extent of practice by health managers and workers in the workplace. Methods: Workplaces with officially noted environmental hazards of noise, organic compounds and/or dust-metals were selected in a South Korean metropolitan city in 2015. The workplace health managers(hereinafter referred to as 'manager') and workers at 97 workplace were interviewed. Managers are those who are in charge of health management at the corresponding workplace and the workers were subjected to in-depth interviews by sampling one worker for each of the workplace. Results: The majority of the managers acknowledged the guidance services of the specialized health management institution affirmatively. Regarding the extent of practice in accordance with the guidance on engineering improvement, only 23 managers(37.1%) responded. With respect to education, 40 managers(41.2%) responded that it was implemented along with 35 workers(36.1%) who responded that they received education, showing no significant difference between manager and worker. Regarding the actual wearing of the protective equipment, however, 83 of the manager(85.6%) insisted that workers wore the protective devices while only 44 workers(49.5%) responded that they actually wore the devices, thereby illustrating a significant difference between managers and workers. Conclusions: These results suggest the urgent necessity of improvement in the mechanism of guidance services of the specialized health management institution for the workplace environment management.

Correlation Analysis between Organization Conflict and Job Stress of Construction Manager in Construction Site (건설현장 건설사업관리기술자의 조직갈등과 직무스트레스 상관관계 분석)

  • An, Sung-Hoon;Bitamba, Bauma Frigeant
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.367-373
    • /
    • 2020
  • As the supervision in site is integrated into construction management, the organization's work is expanded, and the perspective and goals of the work have changed, so there is a high possibility that the conflict situation within the organization will increase. Organization conflict increase a job stress of workers, so it acts as a negative factor in deriving organizational performance. Therefore, the purpose of this study is to analyze the correlation between organization conflict and job stress of construction manager in construction site. As a result of the study, the organization conflict of the construction manager was generally low, and the job stress was also less than that of other area's workers. In addition, correlation analysis revealed that organization conflict and job stress were related. The results of this study may help to improve the organization structure in the construction management site organization.

The DEVELOPMENT OF WORK PERFORMANCE ANALYSIS SYSTEM

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.738-746
    • /
    • 2009
  • The purpose of this study is to develop the web-based system for work performance analysis(WPAS). The need of work performance analysis system has already been suggested in many previous researches on the computerization of the performance measurement in the construction site by using the indicators such as time, cost and quality. However, they had focused on measuring or analyzing the result when the project would be over. The WPAS suggests three indicators - work reliability, work effectiveness and work efficiency - to manage the performance of the construction site. It can help the manager more easily recognize the status of on-going work in the construction site by measuring and analyzing the work reliability rate, the work effectiveness and work efficiency every day. This research includes the procedures for WPAS measurement process, database structure of WPAS which was analyzed by the IDEF0 and the data flow diagram. Finally, this research introduces the result of WAPS's case studies and validation in the Korean construction site.

  • PDF

Development of the Training Course for Project Managers (프로젝트관리자 양성을 위한 실무 교육과정 개발)

  • Ko, Jesuk
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.2 no.1
    • /
    • pp.61-67
    • /
    • 2006
  • Project management is the process of guiding the project from its beginning through its performance to its closure. Project management includes three basic operations which are planning, organizing and control. In particular, the project managers role and responsibility is regarded as the most important part when companies are supposed to work together. The purpose of this study is to address the knowledge and skills requirement of project manager. The demand of project manager has been increasing to perform accurately and share information effectively. In this paper, the proposed course can be used to provide a rudimentary scheme to train and develop knowledge and skills of project managers.

  • PDF

Fuzzy-Based Object Manager for Multimedia Post-Office Box Construction (멀티미디어 사서함 구축을 위한 퍼지 기반의 객체 관리기)

  • Lee, Jong-Deuk;Jeong, Taek-Won
    • The KIPS Transactions:PartB
    • /
    • v.8B no.5
    • /
    • pp.501-506
    • /
    • 2001
  • According to the current increase of the usefulness of information by Internet and Communication network, several methods are proposed in which multimedia information may be efficiently managed and serviced. This paper proposes FBOM(Fuzzy-Based Object Manager) using $\alpha$-cut in Object manager for Fuzzy-Based Multimedia Post-Office Box construction. The proposed system utilizes object discrimination, fuzzy filtering, and class generation structure in order to manage object using Fuzzy filtering. To know how well the proposed system are able to work, this paper have tested against the methods with 1000 items of multimedia information, and our system are compared with Random-key method and FBOM method.

  • PDF

The Design and Implementation of Web Page Access Manager (Web Page Access Manager의 설계 및 구현)

  • 황인문;정강용;김원중
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2002.11a
    • /
    • pp.555-559
    • /
    • 2002
  • Internet users can input URL in Address window of browser or click address of site that is registered to Bookmark and sail the world of internet. But, need input of ID and password and mouse click action of 4-5 times to reach on target page that users want. This environment is very annoying work to users who approach specification page repeatedly every day. So, Homepage (first screen) of URL that want is not, Web Page Access Manager's development that can approach to target page that want by mouse click of short once. That may make web users can approach fast on target page, and minimise effort by web sailing.

  • PDF

Project Experience and its Impact on Project Performance (프로젝트 경험이 프로젝트 성과에 미치는 영향)

  • Yu, Gun Jea
    • The Journal of the Korea Contents Association
    • /
    • v.14 no.8
    • /
    • pp.365-373
    • /
    • 2014
  • The assignment of exploration on individuals provides challenging work environments, while it generates high levels of complexity. On the other hand, the assignment of exploitation on individuals offers less challenging work environments, while it makes low levels of complexity. Give the characteristics of exploration and exploitation, I argue that the assignments of both exploration and exploitation create the favorable work environments to individuals. Developed hypotheses were tested using a logit regression from a sample of 168 project managers in a R&D center. I found that a manager who experienced exploitation project(s) is positively related to higher performance in exploitation project(s). In addition, a manager who experienced both exploitation and exploration projects are found to be positively associated with higher project performance.