• Title/Summary/Keyword: Work management system

Search Result 3,501, Processing Time 0.034 seconds

Requirements Traceability in Systems Engineering for Large-scale Systems Development (대형 체계 개발사업의 체계공학 수행을 위한 요구사항 추적성 확립)

  • 박영원;송해상
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.3 no.2
    • /
    • pp.149-155
    • /
    • 2000
  • This paper presents results from a computer-aided systems engineering application to system development projects. RDD-100 version of ALC Inc. was used in this work. The framework adopted in the study takes a unified approach to the system design and the process management associated with it, thereby coherent and full traceability between them is maintained. Conventional system engineering process supported by the tool is adopted in the system design. On the other hand, the same tool is also used to the systems engineering management to get full traceability between system design data and engineering management data. It is greatly helpful in managing many sub-contractors in the sense that the traceability can help identify the sub-project responsibility as well as the objectives of the project in coordination with interface requirements. We conclude with the advantage and limits of our unified approach.

  • PDF

The Design of the Workflow Management System for Engineering Change Approval (설계 변경 승인을 위한 Workflow Management System 설계)

  • Lee, Chang-Soo;Kim, Sunn-Ho
    • IE interfaces
    • /
    • v.12 no.1
    • /
    • pp.79-93
    • /
    • 1999
  • As most of information systems developed are data-centric rather than process-centric, it is difficult for users to understand and manage the system from the viewpoint of work processes. To resolve the problem of the data-centric design, we propose a new method to design WFMSs(Workflow Management Systems), which are focused on processes and modified from current information engineering methods. In this research, the drawing approval and engineering change approval process of a K manufacturing company has been analyzed as a sample process. This method takes two steps, i.e., process analysis and system design. In the prosess analysis, data and processes are analyzed, and functions and tasks are derived from the processes. In the system design, a data model for the operation of WFMS is designed, and based on this data model, build-time and run-time functions of WFMS are designed.

  • PDF

The development of web based power plant maintenance management system (Web기반 발전설비 정비관리시스템 개발)

  • Kim, Bum-Shin;Kim, Eui-Hyun;Jang, Don-Sik;Cho, Jae-Min;Chae, Gil-Seok;Jung, Gyu-Chol
    • Proceedings of the KSME Conference
    • /
    • 2004.04a
    • /
    • pp.2059-2063
    • /
    • 2004
  • Most power plants have operated many independent computerize systems for maintenance. Independence of systems have caused complexity of business process and inconvenience of computer system management. Because the equipment and material master data is not standardize and structurize, it is difficult to manage equipment maintenance history and material delivery. Especially equipment classification criterion is important for standardization of every maintenance information. It is necessary to integrate function of independent systems for business process simplification and rapid work flow. this paper provides equipment classification criterion design and system integration method with the case of live system development.

  • PDF

A Study on RFID and Bar-code System Simulations for Delay Time Cost in DC Inspection Process (RFID와 바코드가 적용된 검수작업의 대기비용 비교를 위한 시뮬레이션)

  • Park, Sung-Mee;Kim, Jung-Ja
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.4
    • /
    • pp.111-117
    • /
    • 2007
  • Comparing with bar-code systems, RFID systems can supply more efficient work. Using RFID systems, logistic management systems could be helped effectively to gather real-time information. It's available to reduce the working time and object's delay time, and to deal with real-time information by using RFID system. Until now, based on how many pallets used, there is few study about best workload of RFID system. Therefore, in this study, both bar-code and RFID system simulations were executed for inspection process in distribution center. As a result, following the ware pallet quantity, the total cost of both working time and other delay times were calculated and the sensitivity analysis of total cost trend was executed.

Characteristics of bridge task in Korean coastal large trawler (우리나라 근해 대형트롤 어선의 선교업무 특성)

  • Kim, Min-Son;Shin, Hyeon-Ok;Lee, Ju-Hee;Hwang, Bo-Kyu
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.49 no.3
    • /
    • pp.301-310
    • /
    • 2013
  • To suggest a standard concerning with the arrangement of bridge equipment, the authors conducted the video observations with 3CCD (charge coupled device) cameras installed on the ceil of the bridge for monitoring the working activities of two bridge teams (the skipper/mate1 and the skipper/mate2) in a Korean coastal large trawler(gross tonnage: 139) for five days from July 30th. 2010 and analyzed of the data. Work elements coded by the work activities were input on the sheet of work analysis by the time unit of 1 sec according to the time occurred. A single work element among the work activities for every 5 minutes was denoted as the number of occurrence. The frequency of equipment usage was limited only in the usage of the equipment. In the case of the navigation and the towing net two ranks were integrated and analyzed. On the other hand, in the case of the casting net and the hauling net, two processes were integrated to as one and then analyzed separately as two ranks. As the results, 15 elements of work was carried out between two bridge teams for the observation; lookout, radar, GPS plotter, fish finder, net monitor, fishing deck, RPM indicator, rudder angle indicator, compass card, for maneuver; steering, ship speed control, trawl winch operation and external communications, paper works and others. It was found that the work load of the skipper per 5 minutes accordance with the navigation, the casting net, the towing net and the hauling net are 20.5 times, 11.9 times, 38.0 times and 9.5 times respectively, the mates are 65.2 times, 66.5 times, 85.7 times and 59.1 times respectively. The radar was shown the highest frequency of the equipment usage and the next was the fish finder, the GPS plotter and the external communications in the case of the navigation. In the case of the towing net the frequency of usage was high the ranking as the radar, the net monitor, the fish finder, the GPS plotter, the steering system and the external communications. In the case of the integrated process both of the casting and hauling net the trawl winch was shown the highest frequency to the skipper and the next was the GPS plotter and the radar, and the steering system was shown the highest frequency to the mate and the next was the radar, the ship speed control system, the GPS plotter, the net monitor and the fish finder.

A Study on the Characteristics of Safety Culture by Workplace Size and Work Type in the Group Company (동일업종 그룹 계열사의 사업장 규모 및 작업형태별 안전문화 특성연구)

  • Kwon, Hyo Seung;Lee, Keun-Oh
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.6
    • /
    • pp.125-130
    • /
    • 2017
  • The government operates autonomous safety management activities in the regulated safety management in order to prevent industrial accidents. On the other side, companies are promoting safety management in the workplace, such as improving the safety level of the safety system, but the major reason for the accidents is safety ignorance in the event of big accidents. This study aims to improve the safety culture level by analyzing the difference in safety culture among six workplace sites in the manufacture of food products and drawing the improvement point. The main result is as follows. In order to enhance the safety level of the safety system, it is necessary to minimize the number of systems to be implemented, and to strengthen the small safety management activities that workers participate directly in the workforce, and the incentive policy for the promotion of the safety management activities should be coordinated by each group. Due to the high proportion of female workers, the proportion of female workers should be encouraged to actively participate in the safety of women, thereby improving safety culture levels and improving safety awareness through customized safety education. By learning work procedures through theory and practice, the level of safety culture should be increased. Employees voluntary safety participation activities should increase the level of mutual safety culture. Depending on spontaneous safety participation activities, one should promote safety culture enhancement activities by enhancing the safety level of the safety culture and enhance safety culture through safety awareness, and promote safety culture and procedures for improving safety culture.

건설업에 있어서의 컴퓨터 이용

  • 이병해
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1991.10a
    • /
    • pp.3-20
    • /
    • 1991
  • This paper wil1 describe the background and "dynamics" of system integration of construction industry. It wil1 address questions such as, why the construction industry needs to integrate work process through computer based system. Then it describes about 3D modeling, project, management, procurement, engineering data bases, construction CAE. Also the paper presents recent project experience at school environment.

  • PDF

Development of semiconductor process information system (반도체 공정정보 관리 시스템 개발)

  • 이근영;김성동;최락만
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1988.10a
    • /
    • pp.401-406
    • /
    • 1988
  • Various types and huge volume of information such as process instructions, work-in process and parametric data are created in a wafer fabrication process and should be provided to personnels inside or outside the facility. This article describes design criteria and functional description on the information system for small-scale wafer fabrication process to accomplish paperless fab and to support efficient fab management.

  • PDF

A Case Study on the Functions of a Business Management System for Public Organizations (정부산하공공기관의 업무관리시스템 기능 사례 연구)

  • Oh, Jin-Kwan;Cho, Yoon-Hee;Yim, Jin-Hee
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.16 no.2
    • /
    • pp.81-112
    • /
    • 2016
  • This study aims to propose the adoption of a business management system, as well as suggest the functions and development directions for public organizations, which are required to establish the record management and information disclosure system under Government 3.0, rapidly respond to the needs for strengthening the responsibilities for explanation, and improve work efficiency. Recently, some of the public organizations that introduced the record management and information disclosure system adopted the Electronic Document System, which focuses on the function of electronic approval, and developed a records classification scheme for the system. This study aims to review the case of A organization, which recently developed an in-house records management system and established information strategy planning to adopt a customized business management system after establishing a business reference model throughout the organization, and suggests the directions of the electronic record production system for public organizations.

Suggestion of Model Change Work Improvement by REBA and Therblig

  • Lee, Sung-Koon;Park, Peom
    • Journal of the Ergonomics Society of Korea
    • /
    • v.30 no.6
    • /
    • pp.757-764
    • /
    • 2011
  • Objective: The aim of this study was to provide a method to improve the compliance and reduce the time by reducing the workload during the model change work. Background: The enterprises are constructing the small quantity batch production system by increasing the number of model change and reducing model-changing. However, the compliance is low because the work is strenuous and high skills are needed, so the system management is facing with many difficulties. Method: After classifying the model change work according to the purposes(preparation, change and adjustment) with the target of mascara filling machine, element tasks time were measured and the motion analysis(therblig symbol) and REBA analysis were performed. The study incorporated 3 independent variables as the number of motion, REBA score and the element time. The dependent variable is the type of element work as preparation, change and adjustment. The statistical test was performed by one-way ANOVA(${\alpha}$ < 0.05). Results: For the preparation, the number of motions appeared in the order of Use(U), Transport Loaded(TL), and Position(P). The order appeared in change is Use(U), Release Load(RL), and Grasp (G). The adjustment appeared in the order of Position(P) and Use(U). The results of average motion time as the element work times divided by the number of motion appeared in the order of adjustment(1.85sec/motion), preparation(1.11sec/motion), and change(0.62sec/motion). The results of REBA showed that the average risk level of change and adjustment were medium, but 53.1% of change and 42.9% of adjustment were evaluated as high. Conclusion: Reducing the avoidance and improving the compliance of work could be expected if the job autonomy were improved by improving the working postures with high risk level. Application: It is expected to solve the problem of reducing the time of model change work in the small quantity batch production system. The future work is to carry out the improvement directions found in the results and compare the results after improvement.