• Title/Summary/Keyword: Work management system

Search Result 3,472, Processing Time 0.033 seconds

Research of Integrated System Design Process for Concurrency Design Activity (동시적 업무수행을 위한 통합된 시스템 설계 프로세스 연구)

  • Kim Jin-Hoon;Park Young-Won
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.3
    • /
    • pp.141-152
    • /
    • 2004
  • This study describes process and method to establish concurrent and/or sequential schedule planning for the system design process of the EIA632 standard. For this purpose, the study suggest Process and method that are context analysis of standard process, interface definition from activity decomposition, integration of related activities, and definition of concurrent and/or sequential work flow. The proposed process and method will contribute to minimize time loss that is emerged from activities iteration.

A Study on Design of Total System in University Library by Computer (대형컴퓨터를 이용한 대학도서관업무의 토탈시스팀 설계)

  • SaKong, Chul;Choe, Seok-Du;Han, Du-Wan
    • Journal of the Korean Society for information Management
    • /
    • v.4 no.2
    • /
    • pp.3-30
    • /
    • 1987
  • This paper presents a library on-line system applicable to Korean university libraries and describes some features such as fundamental considerations concerning library automation, available software in Korea, and areas of library work where computer can be applied.

  • PDF

GPS by using sailor management system (GPS 를 이용한 선원 관리 시스템)

  • Joo, Jae-Hyung;Seo, Soo-Gyung;Ha, Yun-Su
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2011.06a
    • /
    • pp.285-285
    • /
    • 2011
  • This project can know realtime localization, sea weather and so on. also send information and message for work efficiency. in the case of an emergency like fall into the water or absent without leave, let the other sailer positions will allow for a quick response. so this system can be great help to emergency responders will be able to play a major role.

  • PDF

An integrated manufacturing and distribution model for a multi-echelon structure

  • Hwang, Heung-Suk
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1990.04a
    • /
    • pp.222-244
    • /
    • 1990
  • A multi-echelon structure of manufacturing and distribution system in considered, where the raw materials are transformed into a finished good through a number to manufacturing echelons and it is distributed to the lower echelons(retailers, or customers). The raw material, work-in-process, finished good inventory and the distribution costs are unified into one model. The objective is to determine the ordering policy of raw materials, manufacturing lot size, the number of sub-batch and the distribution policy of the finished good which minimize the annual total system cost. A computer program for a heuristic search technique is developed, by which a numerical example is examined.

  • PDF

On the Developing of the Quality Assurance System - Achieving Reliability in Purchased Equipment -

  • Kim, Gwang Sub;English, John R.
    • Journal of Korean Society for Quality Management
    • /
    • v.19 no.1
    • /
    • pp.43-50
    • /
    • 1991
  • Very little work has been done in the design of process with purchased equipment; therefore it is the intent of this project to expand the current application of reliability considerations to purchased equipment. The procurement of equipment in a manufacturing system which has both qualitative and quantitative aspects.

  • PDF

A Study on the Development of Electronic Mail-based Customer Relationship Management System (전자메일 기반의 고객관계관리(CRM) 시스템 개발에 관한 연구)

  • 김승욱;양광민
    • Journal of Information Technology Applications and Management
    • /
    • v.10 no.4
    • /
    • pp.51-63
    • /
    • 2003
  • This study designs and implements a new approach to the classification of e-mail requests from customer based on machine learning techniques. The work on building an electronic mall classifier can be cast into the framework of text classification, since an e-mail is a viewed as a document, and judgement of interest is viewed as a class level given to the e-mail document. It is also implemented an e-mall based automated response system that integrate with Call Center in a practical use.

  • PDF

A Study on Competency Evaluation and Improvement Plan of Electrical Construction Management Using Importance-Performance Analysis (IPA를 활용한 전기공사 건설사업관리 역량 평가 및 개선방안 연구)

  • Kim, Seungbeum;Byun, Jeongyoon;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.103-112
    • /
    • 2014
  • Since recent construction projects become larger and complicated, the level of difficulty of management skill is rising, and the risk is increasing accordingly so the necessity of improving management skill of projects is increasing. In order to solve this problem, Construction Management system was preferentially introduced in construction projects but in case of domestic construction industry, separate contracts by business boundary are being made so the actual state is that the function of the Construction Management system is not properly operated over the overall projects. The partial operation of Construction Management system like this may impose many restrictions on converged and combined projects such as smart grid and intelligent buildings etc. in the future. For improvement of management skill of domestic construction projects, the competence of project management skill by work areas that can overcome heterogeneity of the current project management skill shall be secured, and any factor that impedes cooperation ability shall be found and that shall be solved. Therefore, the difference of work competency of project management system of construction and electrical construction is to be analyzed by utilizing IPA model in this study, and a plan to introduce the project management system of electrical construction for efficient operation of projects is to be looked into.

Success Factors for ERP System Performance (ERP시스템의 성과에 영향을 미치는 요인 : 사용자 관점)

  • 박동진;추교완;문홍태;신기영
    • The Journal of Information Systems
    • /
    • v.12 no.1
    • /
    • pp.47-66
    • /
    • 2003
  • This study was examined the relationship between the exogenous and endogenous variables in our model to measure ERP system performance using path analysis. The exogenous variables are system quality, user participation, user training, top management support and self-efficacy, and the endogenous variables are system usage, user satisfaction, and work efficiency. The results of the study are shown as follows. First, all the exogenous variables in our model have a direct effect on user satisfaction, and system quality, training, and self-efficacy have a direct effect on system usage. Second, system usage has a direct effect on user satisfaction and user satisfaction has a direct effect on work efficiency. The findings show that the exogenous variables in the model are important to increase ERP implementation success.

  • PDF

Work Breakdown Structure for advanced urban transit system (차세대 첨단 도시철도시스템 기술개발사업의 업무분류체계(WBS) 구성에 관한 연구)

  • Park Sung-Hyuk;Oh Seh-Chan;Yeo Min-Woo
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.921-927
    • /
    • 2005
  • Concurrent engineering is considered in the 21st century product development and H&D. Moreover, advancements in IT and advanced system engineering technology enables to produce high-quality article and shorten the period of R&D. The paper propose work breakdown structure(WBS) based on the product data management(PDM), WEB based system engineering technique, to introduce and operate advanced system engineering technique. We will manage systematically all data produced in advanced urban transit system project based on the proposed WBS. Besides, we provide strategic information for improving efficiency of R&D in advanced urban transit system project. Futhermore, we manage data such as images, design drawings, documents as well as numerical data, and will establish PDM system for sharing the data.

  • PDF