• Title/Summary/Keyword: Work management system

Search Result 3,472, Processing Time 0.033 seconds

A Case Study of the Construction Management Applied to I-Project (I-프로젝트의 건설사업 관리(Construction Management) 적용사례)

  • Kim Jong-Hoon;Seo Bong-Whan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.102-112
    • /
    • 2001
  • It has been passed $5\~6$ years since Construction Management introduced in Korea, but a few government projects have been presented as CM instances. We performed CM service, on behalf of the foreign Client, in the Insa-dong construction, I-Project. Even though there were many limits in cost, time and other aspects, we have attained satisfaction of the Client and successful businesses of all the construction parties as adopting the advanced management methods. Many advanced construction methods have been applied for the purpose of time reduce, cost save and quality assurance as well as to the webbased project management has been imported to overcome the limits of time and place. They have actualized to increase the productivity of the project by managing the floor to floor cycle and quality systemically pursuant to ISO 9002, and by adopting Real-name construction and completion system (or individual activity. While carrying out this project, it is possible to establish mutual reliability and understanding enable to resolve the issues occurring in the early stage due to insufficient understanding of CM, lack of communications and team work, indistinct work scope through continuos training and conferences. Additionally, we became to share business targets among the parties and promoted the project in confidence. We wish that the success of I- project to be rated as a standard model of CM in Korea.

  • PDF

A Study on Development of Remote Site Monitoring System in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구)

  • Ok, Hyun
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

The Development of Visual Inspection System for National Road Facility Maintenance Management (국도 시설물 유지관리를 위한 현장점검시스템 개발)

  • 주기범;김태학;박상근
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.72-77
    • /
    • 2003
  • Visual inspection works are very important part of facility maintenance and management life cycle as a step of creating base data for decision making and maintenance and repair. But currently, visual inspection works have been performed unefficiently and unreliably as works on hand, duplication of works, decisions of defect state, unutilization of inspection history, lack of professional and so on. In this research, we developed visual inspection system that processes inspection work efficiently and provides reliability of inspection output, as a target of bridges, tunnels, underground roadway on national road. We defined problems through visual inspection work analysis, examined the solutions and reflected to functional design of system. We will plan to utilize this system in HMCS(Highway Maintenance and Construction Service).

  • PDF

Development of Work Breakdown Structure for Nuclear Power Plant (원자력발전소 Work Breakdown Structure 개발)

  • Cho, Yeong-Heock;Yang, Myung-Duck
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

A Study of the Strategy on Smart Work (스마트워크 전략에 관한 연구)

  • Park, Kyung-Hye
    • Journal of Digital Convergence
    • /
    • v.9 no.4
    • /
    • pp.213-222
    • /
    • 2011
  • The purpose of this paper is to propose a smart work implementation strategy of Korean companies. Recently in Korea, the interest in smart work is growing and actively promoting but the introduction of private enterprise strategy is absent. However the smart work has been highlighted several issues. In this paper, among the issues, we studied the strategy for introducing smart work system with respect to the related research and literature on strategies and guidelines that may be introduced to the system. With reference to the actual introduction of the basic directions for the procedure proposed by the Korea Communications Commission, we try to review the operating guides and to propose smart work 2.0 implementation strategy, framework and some procedure.

Metadata and Meta-Information System for Hypermedia Documents

  • Woojong Suh;Lee, Heeseok
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.89-92
    • /
    • 1998
  • Recently, many organizations have attempted to construct hypermedia systems to expand their working areas to Internet-based virtual work places. For the effective management of the hypermedia application, it is important to develop a technique for managing hypermedia documents, hyperdocuments. This paper employs metadata as it has been conceived as a key approach in document management. Hence, this paper proposes a meta-information system based on metadata, HyDoMIS, for the purpose of hyperdocument manage-ment. This system contains a repository for hyper-documents, which is based on metadata schema and classification. HyDoMIS performs functions such as metadata management, searching and reporting.

  • PDF

Proposals On The Designe, Construction, Management Maintenance standardization Method Of Mechanical Field Fire Protection System By NFSC (화재안전기준(NFSC)에 따른 기계분야 소방설비 설계, 시공, 감리 유지관리 업무 표준화 방안에 대한 제안)

  • Kim, Sung-Il;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.3
    • /
    • pp.11-17
    • /
    • 2017
  • The study seeks to cooperate with the investigation of a fire investigation based on public-private partnership. Fire protection systems provide a wide variety of viewpoints from the perspectives of design, construction, management, maintenance, maintenance and maintenance systems at a particular point in time, construction, management, and maintenance systems. What is controversial is that there are illegal activities such as illegal activities of the Patent Office, misconduct of construction work and unreasonable construction of construction works.As a theoretical framework, the present study identified the four key elements of a successful disaster response system : responsiveness, control, professionalism, and bias.

Improvement Plan of Safety Educational System for Construction Demolition Works (건축물 해체공사의 안전교육시스템 개선방안)

  • Choi, Jong-Soo;Kim, Kyung-Hwan;Cha, Hun-Joo
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.57-64
    • /
    • 2007
  • In the field of domestic construction demolition works, work process management system is left behind compared with that of several advanced countries such as US, Japan and UK. Especially, the problems regarding safety management are more serious in terms of the availability of safety manuals and law system. The analysis results fiom the questionnaire survey and interviews with demolition engineers indicated that current safety management practices in demolition works lack systematic approach and inappropriate in securing labors' safe working environment. In addition, field labors and managers strongly requested the improvement of safety educational system. Grounded upon the analyses results and investigations, suggestions were drawn for the establishment of advanced safety educational system.

Strategy for Strengthening Community-Based Public Health Policy (지역사회기반 공중보건정책 강화방안)

  • Kim, Dong-Hyun
    • Health Policy and Management
    • /
    • v.26 no.4
    • /
    • pp.265-270
    • /
    • 2016
  • Public health system for more prevention-oriented health promotion rather than hospital-based curative service, focusing population rather than individual, and comprehensive health management in the local community strongly needs to be constructed to solve major issues on efficiencies and equity problems which Korean healthcare system is facing nowadays. Public health promotes and protects the health of people and the communities where they live, learn, work, and play. Medical care tries to cure those who have diseases, but public health tries not to become ill and not to be injured. Debates on how we build or rebuild public health system, which is contrasted with medical care system, are needed in Korea, focusing how needs for healthy community and right to health are fulfilled. Public health specialists for practising population health at local community level should be systematically recruited, the function of public health centers should be strengthened, and new government organization should be established for place-based health management.

The Regional Construction & Management Office Construction Management System Based On The Web (웹을 기반으로 한 지방청 공사현황 정보시스템 구축)

  • 서명배;강의석;김남곤
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.84-89
    • /
    • 2003
  • For running various construction processing information and technological information, it is supplied by Construction CALS/EC systems properly during whole facilities life cycle. So it is urgently necessary to change Regional Construction 8t Management Office (RCMO) equipment construction administration business to electron processing system (CALS/EC). From construction work plan to completion, a present storage documents system is unsystematic. Therefore, it needs management system to store documents and to read in turn documents properly. This research suggest that it is to connect with various information systems and Construction CALS/EC for RCMO which is running public construction field. So it can be driven systematic and effective administration system about public construction business by Web-based present construction situation information system.

  • PDF