• Title/Summary/Keyword: Work management system

Search Result 3,462, Processing Time 0.036 seconds

The Countermeasure for improvement of Construction Safety Management (건설 안전관리의 현황과 발전방향 - 건설공사 관리의 개선방안)

  • 박무일
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.3
    • /
    • pp.33-40
    • /
    • 2001
  • Predict-Plan-Do is the main point to settle Safety management well, but we have neither Predict nor Plan. So just like the system of English CDM is necessary to be adapted in construction work which makes them work in full responsibility by clarifying the responsibility located step by step from planning to designing & constructing-To adapt this system needs more money for Safety than now, but this system makes companies earn maximum confidence & profit by accident prevention. Furthermore leads the nation and the society to earn large profit, then open the road to Welfare State. If you sees only the things such as money, profit, etc before your eyes, no more safety remains. That means no more respect of persons and no more welfare state.

  • PDF

Effects of Workplace Bullying, Nursing Work Environment, and Reality Shock on Turnover Intention of Clinical Nurses (임상 간호사의 괴롭힘, 간호근무환경, 현실 충격이 이직 의도에 미치는 영향)

  • Kim, Sookyoung;Park, Youngwoo;Kim, Kyunghee;Hong, Eunhee
    • Journal of the Korea Safety Management & Science
    • /
    • v.22 no.3
    • /
    • pp.31-41
    • /
    • 2020
  • The purpose of this study was to identify the relationship between bullying, nursing work environment, reality shock and factors of influence on turnover intension. Data were collected from 381 nurses who were under the charge nurse at a hospital with more than 600 beds in Seoul. The collected data were analyzed using the SPSS24.0 program. The mean score for turnover intension was 3.61 ± 0.89. The intension of turnover was correlated with bullying in the workplace (r=0.197, ⍴=.001), the nursing work environment (r=-.409, p=.001), and reality shock (r=.572, p=.001). Variables affecting turnover intension were the work department(β=-0.018, ⍴=.049), working environment(β=-0.424, ⍴<.000), and reality shock(β=0.654, ⍴<.000). The total amount of explanation for turnover intension was 37.3%. The degree of turnover intension of nurses was affected by work in general wards, the experience of workplace bullying and the nursing work environment. To reduce turnover intension, nursing work needs to be analyzed and efforts are needed to establish an effective communication system.

Practical Reasonability for Introducing Separate Contract Award System Concerning Asbestos Removal (건축주가 직접 발주한 석면해체공사 도급의 타당성에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Kim, Hyoung-Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.2
    • /
    • pp.259-266
    • /
    • 2011
  • Project owner, asbestos removal specialist, experts on asbestos removal work, as counter parts to be defined in the study to make out research goals have been asked with questionnaire survey and replied with 65, 275, 32 cases, respectively. And additionally, direct interview 73 sheets have been collected to find out current status of required engineers and equipments assigned and provided to the field, from them, three(3) concerned parties. Questionnaire subjects are composed of common items, reasonable unit cost, need of separate contract-awarding system, status of performing standard contract, status of providing legal engineers and equipments. Concentrated review of two~three questions by subject has been made to find out and compare idea results between three(3) concerned parties. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there is introduction possibility of separate contract-awarding system, it is found out. The possibility of separate contract also has been confirmed by comparison of domestic legal grounds. Justificating grounds to introduce separate contract-awarding system have been shown. Standard contract status between asbestos removal specialists has been compared using two cases of providing removal work contract and receiving it. It is shown that case of 50 percent or less contains 38.5% when they receive contract, but only 10 percent reduction of original contract amount has been made when they provide it. It means that asbestos removal specialists do not keep occupational safety and health regulations.

A Study for the Construction Conformity Assessment System According to the New Paradigm of Construction Management (건설관리 패러다임 전환에 따른 건설공사 품질관리 적합성평가 시스템 구축에 대한 연구)

  • Lee, Kab-Soon;Bae, Young-Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.39-52
    • /
    • 2017
  • The scope of this study is the construction conformity assessment system according to the new paradigm of construction management To minimize the differences between domestic and international state, construction Conformity Assessment is subdivided into system certification and product certification. For the former, WASCON(Worldwide Assessment System of Construction Quality Maturity Stage) is applied. For the latter, AQUA(Advanced Quality Assessment System) was developed and adopted to model project for demonstration. Both systems are designed to enable quantified rating, integrated into PQCS(Project Quality Certification), which is an advanced project quality certification system. The construction work observing PQCS will gain quality score on its own quality certificate(Quality mark on construction itself or facilities is also available, if needed or preferred by customers). This Quality Rating System will inspire and encourage any related parties. PQCS score would let supplier/constructor recognize how much themselves are operating effectively and efficiently, offering them the opportunity of redeeming their weaknesses.

A Study on Development of BIM-based Engineering Management System for Temporary Work (BIM기반 가설공사 업무지원시스템 개발에 관한 연구)

  • Choi, Changhoon;Han, Choonghee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.61-69
    • /
    • 2020
  • As the amount of information generated in the construction project increases exponentially, design and construction review have a serious impact on the success of the site. For this reason, academic and business circles have been expanding the use of BIM at the whole life, and BIM is now accepted as one of the standards used in the construction industry. However, the BIM-based design for the temporary work is used as an aid to the 2D design because there is no specialized software and there is absolutely lack of a professional engineer. The objective of this research is to develop BIM-based temporary work support system. This system minimizes human errors in BIM-based design, quantity takeoff and inspection and shortens working hours.

Enhancement of Water Purification Functions of Watershed Basin (II) -­With a Special Reference to the Point at Issue and Counterplans­- (수변구역 산림의 수질정화기능 증진 (II) -­문제점과 대책을 중심으로­-)

  • Park, Jae-Hyeon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.5 no.3
    • /
    • pp.58-65
    • /
    • 2002
  • This study synthesizes previous research accomplishments with analysis of problems and counterplan for the riparian forest zone management and ongoing research strategy is suggested. If a part of budgets for water use allotments is supported for forest watershed owner, this policy for the forest owner could encourage the forest management of watershed. Integrated riparian forest management guideline in city and county needs to be established for the implementation of government guidelines. Base on the guideline, working plans of city and county could be evaluated. Public Forest Tending Work for stream water quality and quantity conservation should be enlarged for forest watershed and forest area management in five big river watersheds. Forest watershed should be managed with a connected system for a pollutant reduction strategy in urban and industrial areas.

The Research on the Relationship of Cosmetologists' Health Characteristics with Demographic, Health Management, and Working Environment Characteristics (미용사의 건강특성과 인구통계학적 특성, 건강관리 특성, 근무환경 특성과의 관계에 관한 연구)

  • An, Hyeonkyeong
    • Journal of Fashion Business
    • /
    • v.18 no.5
    • /
    • pp.99-115
    • /
    • 2014
  • This thesis aimed examine the relationship between the health characteristics (musculoskeletal, respiratory, skin, digestive, nervous mental system) of cosmetologists and their demographic, health management, and working environment characteristics to help cosmetologists maintain a healthy work life while solving health problems. These research was carried out via survey and statistics analysis. A total of 279 cosmetologists living in Seoul, Kyeongkido, and Choongchungdo from 8 July to 30 August, 2014 were surveyed. Frequency, mean, factor, and regression analysis were carried out on the data with SPSS(V. 14). The results were as follows; (1) a relationship between health & the demographic characteristics of gender was found;- (2) health and the health management characteristics of interest in health problem prevention, active exterior health support, muscular exercise, interior health support, and stress management were found to be related;- (3) health and working the environment characteristics of working time per day, and work days per week were related.

BIM-based Property Management by Linking Maintenance with Financial Data for Commercial Building Projects

  • Shin, Hyeonju;Cha, Heesung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.418-425
    • /
    • 2022
  • For a commercial building, property managers play an important role in maximizing the benefit by reducing cost and increasing revenue in the operation and maintenance phase of the building. However, most of property managers are spending their time in monitoring facility managers who have little impact on cost reduction and maximization of operating profit. The industry practitioners have difficutlty in increasing the efficiency of thier work due to this work environment. In addition, both property managers(PMr) and facility managers(FMr) are dependent on the paper drawings and manuals, which can worsen the inefficiency and human errors are inevitable. This study aims to contribute to improvement of the current practice by developing a novel algorithm that autmatically links the facility information with 3D model, which can provide an efficient property management for commercial buildings.

  • PDF

A Study on Management System Development for Web-based Academical Achievement (웹기반 학업성취도 관리시스템 구축에 관한 연구)

  • Choi, Jin-Young;Yang, Woo-Suk
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.14 no.5
    • /
    • pp.11-17
    • /
    • 2014
  • In this study we explain the necessity of a developing management system of academical achievement in a progrm running the accredited engineering program as an observation and management tool to assure students' succesive achievement of program outcomes, and also present an operation result of the constructed management system. Taking the electronic engineering program in our school as an object, we constructed a relating database to monitor the students' course work completions and achievement of program outcomes, to allow students to build their plans for course work and to enable professors to proceed customized counseling for assigned students. The constructed system also provide various statistics relating program outcomes to allow program professors to proceed effective management of outcomes in the program level. In this paper we show that it is possible to calculate and provide the various statistical indicators, which is needed to effectively run accredited engineering programs, by presenting the results relating successful construction of the system and its operation.

Data analysis for facility maintenance based on BIM - Case studies of facility maintenance based on BIM and practical process - (BIM 기반 시설물 유지관리를 위한 데이터 정의 - BIM기반 시설물관리 사례와 프로세스 분석 -)

  • Kim, Do Young
    • Journal of KIBIM
    • /
    • v.10 no.3
    • /
    • pp.1-11
    • /
    • 2020
  • The introduction of BIM technology is expanding not only in the field of design and construction, but also in the maintenance and use stage. In particular, researchers are looking to build a smart facility management system that integrates advanced IT technology and BIM. This study proposes the parts to be used and added to the BIM information, focusing on information generated and exchanged in the application case that is an issue during the current facility maintenance work by introducing the smart facility management technology and its use cases. The effectiveness of this proposal is compared with the scenario in which BIM-based facility safety management is applied and the current business scenario. In conclusion, the requirements for smart facility management are analyzed, and linkable parts between facility management tasks and BIM data that should be reflected in the facility management system are presented. In the maintenance phase, through the use case scenario, the facility management phase is subdivided according to the characteristics and contents of the work. In addition, information about the facilities required for each task is specified. Furthermore, it is examined whether BIM data and IT information can be linked with existing facility management systems. It is a process and guideline that can be provided to practitioners who want to introduce BIM and smart technology to facility management. It can define the required data items and levels according to the required information step by step based on the maintenance case.