위험관리시스템 구축을 위한 정량적 안전평가 절차 (Procedure of Quantitative Safety Assessment for Risk Management System)

  • 정원
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제9권3호
    • /
    • pp.165-176
    • /
    • 2009
  • The risk management case is an organization's formal arrangement to ensure the safety of its work activity within risk management system. It allows an organization to demonstrate its capability in achieving its safety objectives and in meeting regulatory requirements. This paper presents how the safety assessments are described, prepared and maintained to meet the criteria specified by the upcoming safety regulations. We propose the elements of risk management system that include arrangements for the ongoing identification of hazards, assessment of risks and the implementation of necessary control measures.

  • PDF

시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발 (Development of Earned Value Management System by Using Visualization Index and WBS Map)

  • 이우식;강인석;박서영
    • 한국건설관리학회논문집
    • /
    • 제10권1호
    • /
    • pp.26-35
    • /
    • 2009
  • 건설공사 공정 공사비 통합관리시스템(EVMS, Earned Value Management System)에서 대부분의 정보들은 공사정보 분류체계(WBS, Work Breakdown Structure)를 중심으로 활용된다. 즉, 공정편차와 비용편차 등의 EVM 성과정보 역시 WBS에서 선택된 공종을 중심으로 결과물이 분석되므로, EVMS에서 WBS는 정보중심 역할을 하게 된다. 본 연구에서는 WBS 정보가 4상한의 좌표방식으로 표현되어 프로젝트의 대 중 소 공종이 용이하게 표현될 수 있는 좌표식 공사정보분류체계(WBS Map) 표현기법을 구축하였다. 또한 연구에서는 WBS Map에 근거한 EVMS를 개발하였으며, 개발된 EVMS에서는 각종 속성 지표값들을 색상기호 등으로 시각화하는 방법론을 구축하여 EVMS 정보의 실무 활용성을 높일 수 있도록 하였다.

펌프식 준설선의 통합공정관리시스템 개발 (Development of Integrated Process Management System for Pump Dredge)

  • 정대득;이중우;조증언
    • 한국항해항만학회지
    • /
    • 제26권1호
    • /
    • pp.146-151
    • /
    • 2002
  • 준설작업 효율성은 장비의 형식, 준설토의 특성, 작업의 성격, 작업 시행 전.후에 이루어지는 측량작업 등에 의해 결정된다. 특히, 준설선의 위치제어와 준설지점의 수심 측량은 전체 공정의 효율성 결정에 중요한 인자가 된다. 우리나라 준설업체가 주로 보유하고 있는 펌프식 준설선은 연속작업이 가능하고, 타 기종에 비해 작업해역에서 탁도 발생이 적다는 장점이 있지만 제거되는 슬러리에 토사 함유량이 적고, 위치 정확도가 낮다는 큰 단점이 있다. 본 연구에서는 LADGPS, 조석관측시스템, 광센서 각도추출장치, GIS와 전자해도를 이용하여 4개의 하부시스템으로 구성된 펌프식 준설선 통합공정관리시스템을 개발하여 준설선 위치제어, 실재 굴착이 이루어지는 준설지점의 위치결정, 작업해역의 조위가 보정된 실시간 수심결정, 작업지시내용 및 작업성과를 기록하고 이들 모든 정보를 작업자 모두가 실시간으로 모니터링하고 제어하는 공정관리를 수행할 수 치도록 하였다. 이 시스템을 펌프식 준설선인 '||'&'||'quot;은진PD-2'||'&'||'quot;에 설치하여 운영하였으며, 기존의 작업방식과의 작업효율성 비교를 위한 작업성과 데이타는 아직 추출하지 못했지만 일부 유사한 하$\circledcirc$시스템이 적용된 그라브 쿤설선 공정관리시스템의 효율성 분석결과에서 준설해역의 편평도가 45cm 이내로 양호하고, 작업기간을 227f 단축하였으며, 작업비용을 16.6% 절감된 것으로 나타났다.

간호조직내 인사고과제도운영에 관한 고찰 (A Study on the Management of Performance Rating System in Nursing Organization)

  • 하나선
    • 대한간호
    • /
    • 제31권5호
    • /
    • pp.53-64
    • /
    • 1992
  • A nurse is give much weight in the professions of hospital.The effective achievement of a goal of hospital organization needs to get nurses to contribute the structure positively through the rational personnel management of the nurses.The operation of performance rating system is necessary to improve because the nurses hold negative opinions about the resonable management of that system in most Korean hospitals.Therefore, the prupose of this research was to suggest an efficient method to solve the problem in connection with the management of nurses performance rating system.The results of the study are summarized as follows.1. As the performance rating implies the evaluation of employee's functional accomplishment and ability, and essential condition of the job was surveyed according to the job analysis of nursing activities and nurse position.That is to say, Nusrses' performances and capability is estimated in comparision with the condition of the job. 2. It is required adequacy for evaluation factors in performance rating.That is, $\circled1$ as for those who work in psychiatry or newborn baby room they should be appraied in terms of different factors from those applicable to whom work in a general staffs. $\circled2$ Evaluation factors should be concrete so that the quality and quantity of work and the potential ability of them can be correctly appraised. 3. In order to realize the object of perfamance rating system, the training on chief nurses are quite important. Also, careful practices and continuous supplementary training are required before the system is introduced.First of all, the appropriate evaluation can be mad by continuing to record the rating objects every day for the purpose of obtaining the objectivity of rating. 4. In course of transfering of the position and training, the induction of self-rating system and presentation of self-description is required to supplement functionally the performance rating system. 5. For the efficiency of nurses' performance rating system, the results of performance rating system must be reflected in promotion, allocation and training course, which makes the nurses have the motives and the organization accomplish the goal of modern nursing through its activation.

  • PDF

TASK PLANNING AND VISUALIZATION SYSTEM FOR INTELLIGENT EXCAVATING SYSTEM

  • Jeong-Hwan Kim;Seung-Soo Lee;Jin-Woong Park;Ji-Hyeok Yoon;Jong-Won Seo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.457-463
    • /
    • 2009
  • The earthwork is essential procedure for all civil engineering projects. Because of its importance in terms of cost and time, it should be managed effectively. In light of this, The Intelligent Excavating System (IES) research consortium has established to improve the productivity, quality and safety of current excavating/earthwork system by the Ministry of Land, Transportation and Maritime Affairs (MLTM) of Korea. This paper summarizes ongoing research aimed at development knowledge and presents a framework of task planning and visualization system for IES. The task planning and visualization system consists of three functions. 1) Using digital terrain model which created by 3D laser scanner, the system can divide it and generates global/local work area so that the excavator can work through the area. 2) In order to operate and/or control the excavator, the system exports the location, paths of boom, arm and bucket data of the excavator to control center. 3) The task planning system is visualized on the computer programming aided-graphic interface which simulates the planned work processes and eventually assists the operator for the control of the excavator. The case study which we have performed, demonstrates the effectiveness of the proposed system.

  • PDF

군수품 정부품질보증 위험성 평가제도 개선을 위한 제언 (Proposal for Government Quality Assurance Risk Assessment System for Military Supplies)

  • 안남수
    • 품질경영학회지
    • /
    • 제51권2호
    • /
    • pp.155-170
    • /
    • 2023
  • Purpose: Nowadays, the risk assessment system is widely used in many industrial and public areas to reduce the possible risks. The system is used to determine the priorities of the government quality assurance works in Defense Agency for Technology and Quality. However, as the risk assessment system is used for other purposes, there are some items that need improvement, and in this study, we propose improvement plans by benchmarking the risk assessment systems of other institutions. Methods: In this paper, first, the procedures of risk assessment system used in many industrial sites were reviewed, and how each institution specialized and applied the system. Afterwards, by benchmarking various risk assessment systems, an improvement plan on how to operate the risk assessment system in the case of government quality assurance for centrally procured military supplies was presented, and practical application cases were presented to prove the usefulness of the improvement plan. Results: The proposed risk assessment system differs from the existing system in five major aspects. First, inputs, outputs, and key performance indicators were specified from the systematic point of view. Second, risk analysis was analyzed in four dimensions: probability of occurrence, impact, detection difficulty. Third, risk mitigation measures were classified, control, transfer, and sharing. Fourth, the risk mitigation measures were realized through document verification, product verification, process verification, and quality system evaluation. Finally, risk mitigation measures were implemented and the effectiveness of the risk mitigation measures was evaluated through effectiveness evaluation. Conclusions: In order for the risk assessment procedure proposed in this study to be applied to actual work, it is necessary to obtain the consent of the person involved in the work due to the increased time for risk identification and preparation of the government quality assurance log, and a change in the information system that performs the actual work is required. Therefore, the authors of this study plan to actively perform internal seminar presentations and work improvement suggestions to apply these research outputs to actual work.

GIS를 활용한 공장폐수 위탁관리시스템 구축 방안에 관한 연구 (A Study on Construction of Industrial Waste Water Trust Management System Using GIS)

  • 최병길;나영우
    • 대한공간정보학회지
    • /
    • 제16권1호
    • /
    • pp.75-81
    • /
    • 2008
  • 본 연구의 목적은 공단지역의 환경개선과 폐수위탁관리체계의 투명성을 확보하기 위해 GIS를 활용한 공장폐수 위탁관리 시스템의 구축방안에 대하여 연구하는데 있다. 공장폐수 위탁 및 수탁처리 전산관리 시스템은 공장폐수 위탁 및 수탁관련 정보 입력과 위탁확인서 출력을 위한 위탁 및 수탁 관리 시스템, 관리자가 기간별, 업종별, 폐수종류별, 업체별 위탁량을 통계분석 할 수 있는 통계분석 시스템, 위탁 업체 및 수탁업체의 공간정보와 공장폐수 위탁량 및 수탁량 분포도를 시민들에게 제공하는 WebGIS 시스템으로 구성하였다. 구축된 공장폐수 위탁관리시스템은 폐수의 발생 시점에서부터 완전 처리까지의 전 과정에서의 정확하고 확실하게 파악할 수 있을 것으로 판단된다. 업무의 전산화로 업무처리 시 발생되는 시간적, 경제적 손실을 저감할 수 있을 것으로 판단된다. 또한 공장폐수에 대한 정확한 발생량을 관리함으로써 인천지역에서 발생되는 수질오염사고를 사전에 예방하고 오염사고 발생 시 신속한 대처방안을 도출 할 수 있을 것으로 판단된다. WebGIS를 이용`한 공장폐수의 위탁량 및 수탁량 분포를 관리함으로써 시민들의 환경오염에 대한 생각을 고취시키고 지속적인 관리가 가능 할 것으로 판단된다.

  • PDF

디지털 펜 입력 시스템을 활용한 건설 정보 처리에 관한 연구 -하자관리 시스템을 중심으로- (Construction Information Process Using Digital Pen -Focused on Defect management System-)

  • 박규태;정영철;남현정;손봉기;김태희;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.135-138
    • /
    • 2010
  • In the construction industry, construction management system using information technology has been applied diversely to increase productivity. Although IT device such as PDA, RFID, Barcode, wireless network and web camera has been introduced in construction site, the usage of these device is restricted, because these cause engineer to do additional work. The suggested process using Digital Pen in this study, which can lessen engineer's additional work, get defect data promptly. Also accumulated data is utilized effectively for analyzing construction site. The purpose of this study is to introduce Digital Pen System as a means of construction data acquisition for improving productivity.

  • PDF

정보기술을 활용한 도로면 크랙실링 작업정보 관리시스템 개발 (Development of the Work Information Management System of Pavement Crack Sealing Using IT)

  • 변웅호;오세욱;이정호;김영석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.613-618
    • /
    • 2006
  • 최근 국내 ${\cdot}$ 외적으로 크랙실링 공법의 활용성을 높이기 위해 도로면 크랙실링 자동화 장비 개발에 관한 연구를 활발히 진행하고 있다. 예방적 차원의 크랙실링 공법의 활용을 통해 도로의 장 수영화 및 유지보수 비용을 절감하기 위해서는 도포 유지관리 시점 및 유지 보수된 구간정보, 작업 수행 결과 등과 같은 크랙실링 관련 이력정보가 체계적으로 수집 ${\cdot}$ 축적될 수 있는 관리체계의 개발에 관한 연구가 요구된다. 그러나, 기존 크래실링 관련 기술개발 동향은 크랙실링 공법을 자동화하기 위한 연구가 주로 수행되었고, 작업 완료 후 이력정보의 수집과 축적을 위한 관리체계의 개발에 관한 연구는 미흡한 것으로 나타났다. 따라서, 크랙실링 작업 관련 정보 습득의 어려움 및 경영 분석과 성과측정을 위한 객관적인 자료 구축 미흡, 수집된 정보의 신뢰성 부족 등과 같은 문제점이 도출되었다. 본 연구에서는 최근 급속도로 발전하고 있는 정보기술을 크랙실링 작업관리에 활용함으로써 크래실링 작업 시 발생되는 작업정보를 신속 ${\cdot}$ 정확하게 수집 및 축적하고 작업 주체간의 업무와 정보 교류를 효율적으로 수행할 수 있도록 지원하는 PDA 및 웹 기반 크랙실링 작업정보 수집 시스템을 제안하고자 한다.

  • PDF

원자력발전소에서 리스크를 고려한 작업관리 방법 (A Study on the Work Management Method Considering Risks in Nuclear Power Plants)

  • 송태영
    • 한국압력기기공학회 논문집
    • /
    • 제10권1호
    • /
    • pp.37-43
    • /
    • 2014
  • Nuclear power plants(NPPs) are consisted of power production functions and safety functions preventing leakage of radiation. Operators working in NPPs shall maintain these functions during an operation period through various activities such as improvement & modification, corrective maintenance, preventive maintenance and surveillance test. According to the performance of these work activities, there are configuration changes in NPPs systems. Its changes cause the increase of safety risks(CDF) and plant trip risks. Recently, the importance of risk management is increasing gradually in the operation process of NPPs. Therefore, this paper presents the work management methods using the various risk monitoring systems during power operation and overhaul period. Also this paper suggests the optimum application ways of risk systems for work management.