• Title/Summary/Keyword: Work Risk

Search Result 2,215, Processing Time 0.03 seconds

The Assessment of the Risk Index of Live-line Works on Distribution Line by the Accident Analysis (재해분석을 통한 배전선로 활선작업 공종별 위험지수 평가)

  • Choi, Seung-Dong;Hyun, So-Young;Han, Hyeong-Ju;Shin, Woon-Chul
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.3
    • /
    • pp.8-14
    • /
    • 2011
  • The live-line works are very dangerous because of direct contacts with the distribution line or neighboring contacts. So the purpose of this study is to identify the risk factor by accident occurrence form and accident case analysis, and to suggest the quantified risk index by risk occurrence frequency and risk strength analysis. And the risk index assessment is researched by accident cases analysis on work type. Accident cases of transmission distribution line are researched based on data of the Ministry of Employment and Labor in the last ten-year period (2000~2009). In results of this paper, high risk isn't always a priority of safety measures. Risk occurrence frequency and risk strength have to be considered according to detail work types, work methods and conditions of field work. And safety management measures must be planned according to risk occurrence frequency and risk strength.

A Study on The Risk Level of Work Types in Urban Railway Construction (도시철도 건설공사의 공종별 위험도에 관한 연구)

  • Lee, Jong-Bin;Han, In-Kuk;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.2
    • /
    • pp.98-103
    • /
    • 2016
  • The goals of this study were to investigate some significant factors to judge level of safety at urban railway construction field and to analyze degree of risk by work classification. Currently, there are lots of construction fields for the urban railway for national transportation, and our government also planned constructing more urban railway in near future. However, most of the researches on safety neglected the degree of risk factors on the urban railway construction field. Safety managers participated in the brainstorming session for deriving decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for deriving most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including adjacency of obstacle, intensity of work, unsafe condition and work space. Third, the results of AHP showed civil work is the most dangerous work among 6 work types. The results could be used to give the safety management priority on accident prevention efforts among several hazards and to reduce degree of risk in construction field of the urban railway.

Safety Management Information System in Plants Construction Work (플랜트 건설공사의 안전관리 정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.

The Study on the Risk Assesment of Formwork (거푸집공사 위험성 평가에 관한 연구)

  • 고성석;오준호
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.3
    • /
    • pp.96-101
    • /
    • 2002
  • The object of risk assesment is to prevent the accident from arising. The main reason for risk assesment of construction work is to determine priority order of improvement plan about risky work. Formwork is a complicated process that determines the total duration of apartment construction, and occupies 10∼15% of total construction expense, and 17% of serious accidents occur during formwork. So, formwork occupies very importment roles in work sites, economical efficiency and safety. We need to identify the work type with a high risk of accidents, and to establish suitable safety counterplan and implement intensive safety management.

Risk Assessment of Agricultural Construction Works using Accident Analysis and Analytic Hierarchy Process (재해분석을 통한 농업토목공사의 공종별 위험성 평가)

  • Yang, Young Jin;Oh, Sue Hoon;Noh, Jae Kyoung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.4
    • /
    • pp.15-25
    • /
    • 2018
  • The accident risk at the construction workplace associated with agricultural engineering is comparatively higher than those of other fields due mainly to its complex work types and processes. Agricultural engineering deals with a variety of agricultural infrastructures from irrigation and drainage facilities to giant-scale coastal reclamation land infrastructures. The characteristics that most agricultural projects have conducted on a small-scale even worsen the situation drawing low attentions to risk management. Therefore, systematical risk assessment that focuses on details of agricultural construction work process is required in order to enhance safety management capacity and to prevent repetitive accidents ultimately. This study aims to categorize construction work types and processes of agricultural construction works, and to quantitatively assess the accident risk of them based on accident analysis. Regarding classification of construction works, actual 827 accident cases were thoroughly reviewed and coded by their construction site, facility and work type, project scale and so on. Most accidents (71.8 % of total cases) occurred in small-scale construction workplaces with less than 5 billion Korean won project budget. And those accidents related to agricultural infrastructure project (37.4%) and agricultural water development project (22.4%). In terms of work types, accidents frequently took place in form-work followed by pipe installation work, steel bar work and concrete work. The potential risks were compared with actual outbreak of accidents based on Analytic Hierarchy Process (AHP). The results show that the potential conditions of accident expected to be took place is somewhat different from the actual conditions where accidents actually happened. This implicates that risk management manuals or education needs to be adjusted by reflecting unexpected circumstances. Overall, this study is meaningful in that the results could be foundations as to strengthen risk management capacity for agricultural engineering projects.

Risk Analysis of Lifting Work for Risk Assessment of Modular Construction (모듈러 건축 현장의 위험성평가를 위한 양중작업 위험요소 분석)

  • Jun, Young-HUN;Kim, Kyoon-Tai;Jeon, Eun-Bi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.291-292
    • /
    • 2021
  • In modular construction, it is insufficient for safety management of workers, and workers are still exposed to the risk of accidents due to work at high places for lifting and assembly work in modular construction sites. Therefore, it is necessary when preventive safety management through risk management of workers on modular construction sites. This study is a basic study for the risk assessment(checklist) of modular construction, and the purpose of this study is to analyze the risk factors of the module lifting work at the modular construction site. It is intended to identify the hazard risk factors and improvement measures of the existing lifting operation, by analyzing the case of the risk assessment of the existing RC method, and to identify the risk factors for each work process when lifting the module. In the future, the results of this study are expected to be utilized in the development of checklists for risk assessment as safety management plan for modular construction sites.

  • PDF

A Study on the Risk Level of Work Types in Nuclear Power Plant Construction (원자력발전소 건설공사의 공종별 위험도에 관한 연구)

  • Lee, Jong-Bin;Lee, Jun Kyung;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.3
    • /
    • pp.95-99
    • /
    • 2013
  • The goal of this study was to investigate some significant factors to influence level of safety at plant construction field and analyze degree of risk by work classification. Currently, there are lots of construction fields for the nuclear power plant for electricity generation, and our government also planned constructing more nuclear power plant in near future. However, much of the safety literature neglected the degree of risk factors on the plant construction field. Safety managers participated in the brainstorming session for drawing decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for drawing most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including number of workers, working environments, skill of craft and accident experience. Third, the results of AHP showed Architecture work is the most dangerous work among 6 work types. The results could be used to reduce degree of risk in construction field of the nuclear power plant.

A Study on the Analysis of Delay Claim Risk in Apartment Housing Projects (공동주택공사에서의 공기지연 리스크분석에 관한 연구)

  • Kim Jae-Wook;Woo Kwang-Min;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.217-221
    • /
    • 2003
  • This study proposes a new classification system and analysis methodology for time delay risk of apartment projects. And this study proposes the classification of major trades and risk level and risk index by performing expert-oriented interview and survey report on a national scale. The purpose of this study is to present basic data for time delay risk management system through the analysis of risk level, risk index and rank of major 5 trades(earth work, structure work, masonry work, window and door/glass work, and interior finish work) in apartment projects.

  • PDF

Risk Assessment in Finland: Theory and Practice

  • Anttonen, Hannu;Paakkonen, Rauno
    • Safety and Health at Work
    • /
    • v.1 no.1
    • /
    • pp.1-10
    • /
    • 2010
  • The Finnish risk assessment practice is based on the Occupational Safety and Health (OSH) Act aiming to improve working conditions in order maintain the employees' work ability, and to prevent occupational accidents and diseases. In practice there are hundreds of risk assessment methods in use. A simple method is used in small and medium sized enterprises and more complex risk evaluation methods in larger work places. Does the risk management function in the work places in Finland? According to our experience something more is needed. That is, understanding of common and company related benefits of risk management. The wider conclusion is that commitment for risk assessment in Finland is high enough. However, in those enterprises where OSH management was at an acceptable level or above it, there were also more varied and more successfully accomplished actions to remove or reduce the risks than in enterprises, where OSH management was in lower level. In risk assessment it is important to process active technical prevention and exact communication, increase work place attraction and increase job satisfaction and motivation. Investments in OSH are also good business. Low absenteeism due to illness or accidents increases directly the production results by improved quality and quantity of the product. In general Finnish studies have consistently shown that the return of an invested euro is three to seven-old. In national level, according to our calculations the savings could be even 20% of our gross national product.

Suggestion of Risk Assessment Models for Cardiovascular Disease in the Workplace

  • Choi, Eui Rak;Jeong, Byung Yong
    • Journal of the Ergonomics Society of Korea
    • /
    • v.33 no.4
    • /
    • pp.289-297
    • /
    • 2014
  • Objective: The purpose of this study is to identify the incidence risk of cardiovascular disease (CVD) in the workplace, and to suggest the prediction models for level of CVD incidence risk. Background: CVD can be caused by various factors related to personal habits such as diet and exercise, or genetics. However it can also be caused and aggravated by work, making the elimination of such risk factors at work crucial disease (KOSHA, 2013). Method: The distribution of CVD risk assessment levels of 162 workers was compared with the acquired medical examination data to discuss the necessity of assigning additional risk factors. Two alternative risk assessment models were given to enhance the accuracy of the evaluation; adjusting risk scores given in the KOSHA GUIDE H-1-2013 (alternative 1) and building a matrix of KOSHA GUIDE H-1-2013 and risk assessment results based on work condition levels (alternative 2). To verify the suggested models, medical examination results of 12 workers approved of convalescence were referred to. Results: The second alternative showed more relevance between the results and workers approved of convalescence in predicting the risk group when applied to actual heath examination data from the approved workers. The power of description of the new method for determining the risk of CVD incidence, 83.3%, is higher than that of KOSHA GUIDE H-1-2013, 25%. Conclusion: Results of this study imply that more approved workers had been from unmanaged normal groups than managed risk groups, raising the importance of CVD management. Application: The new prediction model considering working time and shift work developed in this study is expected to be a fundamental data for risk analysis and management of CVD in the workplace.