• Title/Summary/Keyword: Work Efficiency Improvement

Search Result 516, Processing Time 0.028 seconds

A Study on Measuring Efficiency Improvement of Improvement Project at Black Spot by DEA (DEA를 이용한 교통사고 잦은 곳 개선사업 효율성 측정방안 연구)

  • Kim, Hyung Kyu;Lee, Soo Beom;Eom, Dae Lyoung;Won, Dong Uk;Shin, So Myoung
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.5
    • /
    • pp.141-148
    • /
    • 2017
  • Over the past 30 years, the business effects of the improvement project at black spot have been decreasing since 2010, with a reduction in the amount of government spending, coupled with proposing a uniform improvement plan. In order to promote more efficient improvement projects, it is necessary to evaluate the efficiency of local governments and improve the business methods of local governments with low efficiency. However, more sophisticated efficiency analysis methods are needed. Because in previous studies have been limited to the analysis of effects before and after the project through the simple before-after analysis. For this purpose, this study analyzed the efficiency of improvement project at black spot by local governments in Gyeonggi-do using DEA to compare and analyze efficiency in various fields. As a result, Goyang, Seongnam, Paju, Hanam and Yangju showed high efficiency local governments. For local governmetns with low efficiency, the improvement projets to improve efficiency were divided into civil engineering work, structure work, pavement work, additional work and transportation work, and the appropriate construction ratios of each local government were analyzed and presented.

An AHP Approach to Select the Task Related Technique for Work Efficiency Improvement in Shipbuilding Enterprise (AHP에 의한 조선기업의 작업능률향상을 위한 과업관련기법의 선택)

  • Kim, Tae-Soo;Lee, Kang-Woo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.2
    • /
    • pp.67-74
    • /
    • 2007
  • The objective of this research is to select the most effective technique among task related techniques(motion & time study, job redesign, physical environment improvement) for improving work efficiency in shipbuilding enterprise. This study consists of several principal steps. The first step is to design critical criteria in evaluating work efficiency in ship-building enterprises. The second step is to develop sub-criteria of the critical criteria. The third step is to develop a four level AHP(Analytic Hierarchy Process) structure using the critical criteria, sub-criteria and techniques among task related techniques. The fourth step is to develop the pairwise comparison matrix at each level of AHP structure, which was based on survey data collected at the H heavy industry. And the last step is to select the most effective technique among task related techniques using AHP analysis. The result of AHP analysis has shown clear difference in priority among task related techniques in terms of work efficiency of the shipbuilding enterprise: The reduction of normal time is more important than the reduction of allowance time in improving of the work efficiency. Motion & time study is the most important technique for the reduction of normal time, and physical environment improvement is the most important technique for the reduction of allowance time as well.

An AHP Approach to Select the Task Related Technique for Work Efficiency Improvement in Shipbuilding Enterprise (AHP에 의한 조선기업의 작업능률향상을 위한 과업관련기법의 선택)

  • Kim, Tae-Soo;Lee, Kang-Woo
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2006.11a
    • /
    • pp.31-37
    • /
    • 2006
  • The objective of this research is to select the most effective technique from task related techniques(motion & time study, job redesign, physical environment improvement) for improving work efficiency in shipbuilding enterprise. This study consists of several principal steps. The first step is to design critical criteria in evaluating work efficiency in shipbuilding enterprises. The second step is to develop sub-criteria of the critical criteria. The third step is to develop a four level AHP(Analytic Hierarchy Process)structure using the critical criteria, sub-criteria and techniques from task related techniques. The fourth step is to develop the pairwise comparison matrix by each level of AHP structure, which was based on survey data collected at the H heavy industry. And the last step is to select the most effective technique from task related techniques using AHP analysis. The result of AHP analysis has shown clear difference in priority among task related techniques in terms of work efficiency of the shipbuilding enterprise: The reduction of normal time has more importance than the reduction of allowance time, motion & time study techniques are most important for the reduction of normal time, physical environment improvement is most important for the reduction of allowance time as well.

  • PDF

A Study on Fuzzy Logic Based Intelligent Control of Robot System to Improve the Work Efficiency for Smart Factory

  • Kim, Hee-Jin;Kim, Dong-Ho;Han, Sung-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_1
    • /
    • pp.645-658
    • /
    • 2021
  • In this paper, we propose a new approach to intelligent control based on fuzzy logic for work efficiency improvement of smart factory by the applicaion of ariticulated robot. The intelligent control that is applied to the working process by the joint of robotic manipulator is the main focus to improve a work efficiency for implimentation of smart factory in general manufacturing process. In this study, we propose a new method of a fuzzy model and then develop a nonlinear relationship between interaction forces and manipulator position using a fuzzy model. The reliability of the proposed control method is illustrated by simulation and experiments.

The Problem and Improvement Solution Regarding the Inquiry of Sample (검체 문의에 관한 문제점 및 개선방안)

  • Yang, Joon-Ho;Seo, Jung-Mi;Song, Hoon-Gang;Kim, Eun-Jung;Kim, Chang-Ho
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.13 no.3
    • /
    • pp.193-195
    • /
    • 2009
  • Purpose: The work flow of international hospital's laboratory consists of rapid test and result report at the present day. However, the frequent inquiry of sample, which cause affairs to delay and efficiency to Lower, affects medical examination. In order to promote work's efficiency, we should improve the problem and make work smooth between a laboratory, outs and ward. Materials and Methods: This study runs as follows. First, Investigating test result, test schedule, test receipt, quick result, etc through the activity required from September to November 2007 about the inquiry of sample. After analysis of the problem in December, remaking the test schedule for improvement solution and reporting it to outs and ward. When the result is retest and dilution, we directly fill in a result space with the result situation of the patient to let them know beforehand. We also, prevent the omission of the result through checking the sample list and discriminate in vivo from in vitro by changing the laboratory's telephone number. We have improved the problem about the inquiry of sample through valuation and analysis since the improvement activity from January to March 2008. Result: The case about the frequent inquiry of sample has reduced by 57.8%. this improvement activity indicated that p-value<0.05 was statistically significant through paired t-test. This activity make study smooth and we rapidly report the result. Conclusion: By reducing the case regarding the inquiry of sample, work discontinuation, and concentration reduction, the work efficiency was increased.

  • PDF

Case study on improvements in non-value-added nursing activities to increase the efficiency of nursing care (Non-Value-added Activity 개선을 통한 간호업무 효율성 향상)

  • Park, Yang-Hee;Kwon, In-Gak;Park, Kyei-Sook;Jang, Hae-Jung;Song, Mi-Ra;Kim, Hee-Jin
    • Quality Improvement in Health Care
    • /
    • v.19 no.2
    • /
    • pp.68-80
    • /
    • 2013
  • Background: This study investigates improvements in non-value-added nursing activities in clinical work, in order to improve the efficiency and quality of nursing activities. Methods: The study was performed as a quality improvement project at a tertiary general hospital. The nursing activities that needed improvements were categories into admission care, discharge care, supply management, diagnostic work-up related activities, and others. The nursing time and frequency of non-value-added activities were compared across nine nursing units before and after implementation of the quality improvement program. Post-implementation patient and nurse satisfaction were subsequently analyzed. Result: Post-implementation, the time spent on non-value-added nursing activities was reduced and patients and nurses were satisfied with the improvements. Discussion: Reducing non-value-added activities in nursing can increase the work efficiency and ensure time for patient care, thus improving the quality of nursing care. For further study, accurate surveys on nursing activities based on nursing time are required.

A New Modified MPPM for High-Speed Wireless Optical Communication Systems

  • Rouissat, Mehdi;Borsali, Riad A.;Chikh-Bled, Mohammad E.
    • ETRI Journal
    • /
    • v.35 no.2
    • /
    • pp.188-192
    • /
    • 2013
  • Previous work proposed combining multipulse pulse position modulation (MPPM) with pulse amplitude modulation to form multipulse amplitude and position modulation (MPAPM), which is a hybrid modulation that results in an improvement in bandwidth efficiency but a degradation in power efficiency. In this paper, to achieve greater power efficiency and a better data rate, we propose multipulse dual amplitude-width modulation, based on MPAPM and pulse width modulation. The proposed scheme shows a remarkable improvement in data rate and a 1.5-dB improvement in power efficiency over MPAPM, while sustaining the bandwidth efficiency. After introducing symbol structure, we present the theoretical expressions of spectral efficiency, the power requirements, and the normalized data rate, as well as the results of comparing the proposed modulation to MPPM and MPAPM.

Apply a Model of CQI to the Hospital

  • Tsay W.D;Chen C.S;Lai M.C
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 1998.11a
    • /
    • pp.673-679
    • /
    • 1998
  • The paper aims to apply a model of continuous quality improvement (CQI) to Taiwan provincial Pin Ton hospital. Tools of quality control were used both total quality management (TQM) and quality control circle (QCC) in order to approach the objective of ${\ulcorner}$higher quality, higher efficiency, lower cost${\lrcorner}$. During two years, this hospital has organized thirteen QC circles that were classified three categories according to that objective: four circles work for higher quality; the other four circles work for higher efficiency; five circles for lower cost. After implementation, several results were found from two viewpoints. From viewpoint of tangibility, one of the most outcomes is to reduce labor cost from 56 persons to 28 persons of temporary employees. From viewpoint of intangibility, the result was evaluated using radar chart to compare the difference after improvement. This paper is going to report the process of CQI for the hospital management because it is a new issue in Taiwan since 1997

  • PDF

A Study on the Standard Time & Loss Time (표준작업시간과 손실시간에 관한 연구 - Radiator 제조공정의 시간연구사례를 중심으로 -)

  • 강경식
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.4 no.5
    • /
    • pp.27-42
    • /
    • 1981
  • The object of this paper is to Study the work measurement which is one of the principal technique in work study for the improvement of Productivity in the foundry industry. Most of domestic mechanical enterprise using the expensive foreign machinerise is inoufficient for the standardization of the operation method and time. Therefore, the improvement of operation and productivity through the introduction of the work measurement is an urgent task. Therefore, this paper is contribute to the improvement of operation and to reduce the loss time through the application of the work measurement based on the case study conducted at W-Foundry Corporation. The summary of this study is follows; 1. The measurement of operation efficiency can be accomplished by the standard time. 2. The detailed causes and counter-proposal of loss time can be established, 3. More than 50% of loss time is attributed to c/p.

  • PDF

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.