Bleeding after open heart surgery with cardiopulmonary bypass was a cause of concern. requiring reexploration of the chest in approximately 8 percent of patients who have had operations on the heart. From April., 1983 to October, 1991, 16 patients[2%] out of 777 patients who underwent open cardiac surgery had emergency reexploration with bleeding at the Department of Thoracic and Cardiovascular Surgery, Chungnam National University Hospital. In 12 cases[75%], reexploration was performed for continuous bleeding and the reminder[4 cases] were performed for suspected tamponade & hypotension. There were 9 cases[56%] of congenital heart disease and 7 cases of acquired heart disease. The mean blood loss were 997$\pm$472ml /sq. M in total cases and 1442$\pm$ 647ml /sq. M in cases repair of cyanotic heart disease. The mean interval till reoperation was 16.6hr [1hr~72hr] and 41 hr[12~72hr] in tamponade cases and 8.4hr[1hr~24hr] in continuous bleeding cases. The bleeding sites were identified in 7 cases: aortotomy site in 2 cases, ventriculotomy site, SVC, thymus, pleura and sternum wiring site in each other case. But no specific sites was found in the remaining 9 cases. The 8 cases had complications but all except 1 cases with hypoxic brain damage were recovered without sequale. We conclude that emergency thoractomy after open heart surgery may be lifesaving and-/or diminishing complications with bleeding if performed promptly with excessive bleeding, tamponade and unexpected hypotension.
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.1
/
pp.192-196
/
2010
Due to a development of a modem technology as Power Line Communication(PLC) over 200 Mbps, the high-speed multi-media data trasmission could be currently possible. The strength of the PLC has no more additional wiring work. PLC has also possible to high quality data transmission with currently electrical cable. It has a various strong point campare with existing wire and wireless communication technologies. In This paper we develop a high quality media transmitter-receiver based on merging the HomePlug AV, which is 200 Mbps class PLC technology and HDMI Interface technology. The video function was used for the VEDEO TEST GENERATOR in order to a property valuation. Smart Live 6 software were used for the assessment of audio property. As the result of measurement of the HD class images by capturing from the receiver of the PLC, the quality of images couldn't be confirm any deterioration, which has compared with original reflections. In case of audio part as the result of confirmation of the Phase, Magnitude, it has been confirmed that over 90% of nomal transmition and receiving of acoustic signal. It can be possible to have HD class Media service through the PLC.
Wire codes, introduced by Wertheimer and Leeper, are interesting largely because several case-control studies have reported associations between them and certain types of cancers, including childhood leukemia. This paper is concerned with the reliability of wire codes as a surrogate for residential electric and magnetic field, divided into four categories based on the electrical wiring within 40m of homes. To examine the correlation between spot measurements and wire codes, EMF was measured by using HI-3604 and classified by wire codes. The correlation between long-transformed RMS of magnetic field and wire codes was 0.81. But the correlation between log-transformed RMS of electric field and wire codes was 0.27. The results led us to determine a four category from of the Wertheimer and Leeper code that 1) may be useful in domestic epidemiological studies and 2) is not suitable for electric field exposure. Thus, the critical point of exposure assessment in residential magnetic field is to classify a wire code precisely.
The Transactions of The Korean Institute of Electrical Engineers
/
v.61
no.10
/
pp.1554-1560
/
2012
In this paper, the even harmonic current(2nd, 4th, 6th, 8th) of the arc fault current and normal current were measured in computer load and analyzed. The BPF with GIC was developed to detection of harmonic, the exact center frequency and a high degree of sharpness could be easily obtained. The total even harmonic distortion due to series arc fault in computer load was 31.2%, this value was increased 3.9 times better than the total even harmonic distortion of normal current. The results of analysis of arc fault current RMS variation rate and Peak variation rate per half-cycle, The RMS average variation rate are as follows ; the 2nd harmonic was 0.24, the 4th harmonic was 0.15, the 6th harmonic was 0.19, the 8th harmonic was 0.25, respectively. The Peak average variation rate are as follows ; the 2nd harmonic was 0.19, the 4th harmonic was 0.12, the 6th harmonic was 0.13, the 8th harmonic was 0.15, respectively. The results of this analysis utilize data to detect of series arc fault on wiring of computer load.
Lee, Hyuk Gi;Cho, Jae Hoon;Lee, Sung Lak;Kang, Dong Gee;Kim, Sang Chul;Kim, Yong Sun
Journal of Korean Neurosurgical Society
/
v.29
no.2
/
pp.280-285
/
2000
Posterior transarticular screw fixation for atlantoaxial instability due to trauma or rheumatoid arthritis provides immediate rigid fixation of the C1-2 vertebral segment while preserving motion between the occiput and C1. This technique provides more resistance to translational and rotational forces than wiring technique. However, the technique of transarticular screw fixation is inherently demanding because of the complex anatomy of the occipitocervical region and vertebral artery(VA) at risk for arterial damage. VA injury may lead to serious subsequent neurological deficits and possibly death from bilateral VA injury. We report a case of a vertebral artery-to-epidural venous plexus fistula after posterior transarticular screw fixation which was treated with balloon occlusion.
This paper describes the characteristics of voltage drop and thermal for poor connection on electrical connector of circuit breaker in control box of small size pulverizer. In order monitor, we did the changes of RMS in voltage and temperature value with video and made normal state over $2.5N{\cdot}m$ and poor connections state below $0.2N{\cdot}m$ by screw gage. In case of voltage signal, the voltage drop was increased when the current was increased due to poor connections. In case of temperature signal, the temperature difference indicates ten times at 5A and fourteen times at 15A in the normal state. According to increase thermal energy, the insulation of electrical wiring and connector of circuit breaker can be carbonized. The results of this study will be useful to the development of preventive devices and system for electric fire by poor connection at small size pulverizer.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.21
no.9
/
pp.57-63
/
2007
The occurrence of a corona is that electrical discharge due to the heterogeneity that occurs when an electrical field is concentrated in an electrode due to a cusp formed on said electrode. Wire treatment at the end of a 154[kV] dead end clamp for end users accelerates the occurrence of corona, which in turn leads to power loss and noise. In this study, the characteristics of the corona which occurs between porcelain insulators and support clamps of overhead lines used in 154[kV] power receiving facilities for end users were investigated. The corona, which cannot be identified by one common method, was measured utilizing a UV image camera. A risk assessment for fire damage and its status was suggested. The stress distribution of the electrical field by length of bare wire was suggested by means of the finite element method(FEMLAB). As a result, it was found to affect a porcelain insulators. These results can be utilized for the enhancement of clamp installation and safety in power facilities.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.25
no.4
/
pp.104-110
/
2011
There are over 30[%] of electric fires in Korea happened at wire or wiring devices. For its prevention many safety devices are set up electric equipments. These safety devices are not working in a rated current's condition of electric equipment. But when wire is partially disconnected, electric fire is able to be happened even though current is smaller than a rated current value. This paper studied thermal characteristics and fire ability when wire in plug is partially disconnected. The experiment is progressed a method that inner wire of plug is partially disconnected and after that current that is less than a rated current is flowed. As the result, heating occurred in near of partially disconnected wire makes that outer sheath is melted, plug cover is carbonized, and even sometimes wire is fused. And results of analysis of thermal image of partially disconnected wire happened in plug, it shows a difference to heating distribution and temperature appeared surface of plug depend on a progress of a partially disconnected wire.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.59
no.2
/
pp.238-244
/
2010
In this paper, we studied electrical characteristics of internal converter type of LED lamps for road and street lighting. We surveyed electro-technical regulations and KS(Korean industrial standards) about LED luminairs. Waveforms of voltage and current, thermal distributions, insulation resistances between live parts and exposed conductive parts, and flame test of cover of LED lamps were experimented and analyzed. In regulations, insulation resistance between live conductors and exposed conductive parts should be greater than $0.2M{\Omega}$ in case nominal voltage of wiring is 220V. In KS codes, the value of insulation resistance should be greater than $2M{\Omega}$ while applying DC 500V or DC 100V. In the result of this study, waveforms of primary voltage and current were distorted. There was difference in waveforms of secondary voltage and current according to composition of converter. Mostly, insulation resistances were measured high more than regulation and code value but some measured points were measured badly($0.0M{\Omega}$). Cover of LED lamps was ignited easily. We expect that the results of this study would be helpful for revision of regulations and national codes for the electrical safety of LED road and street lighting.
Even though the existing train route controlling method, using track circuits, ensures the sufficient number of operation, it still has problems such as discordance between train numbers which was planned for operating and train numbers being operated on the track, and allowing only one train entering for one route. To solve those problems, we study and develop the Smart train route controlling system which uses the real-time informations of train positions. This system enables improve the coefficient of utilization in a certain train route controlling section, and the safety level of train route controlling, but we should ensure satisfying reliability of data about tracks operated by trains. In addition, there is a need to protect accidents caused by erroneous information of train position, by reflecting changes of tracks, for example maintenance, improvement, expansion of tracks. In this paper, we describes data structure of a developed program which required to change CAD files to wiring diagrams and to generate them to data of tracks. And we show the result that the simulator, using the data structure, controls speed and route of trains without problems.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.