• Title/Summary/Keyword: Wind-Power

Search Result 3,024, Processing Time 0.033 seconds

Estimation of wind power generation of micro wind turbine on the roof of high rise buildings in urban area (도심 고층건물 지붕에서의 소형 풍력발전기 발전량 예측)

  • Choi, Hyung-Sik;Chang, Ho-Nam
    • New & Renewable Energy
    • /
    • v.5 no.4
    • /
    • pp.21-27
    • /
    • 2009
  • Potential yield of micro wind turbine on the roof of urban high rise buildings is estimated. Urban wind profile is modeled as logarithmic profile above the mean building height with roughness length 0.8, displacement 7.5 m. Mean wind velocity from the meteorological agency data at the hight of 50m is used. Wind velocity changes are simulated on the rectangular roof of 26, 45, 53 degree pitch and the circular roof by computational fluid dynamics and RNG k-$\varepsilon$ turbulence models. Wind velocity increased approximately by a factor of the order of 270 % on the 26 degree pitched roof. In the 100 m and 200 m high buildings, wind enhancement is greater at the front side than at the center of the building. In the building arrangement model wind velocity changes abruptly and it becomes wind gusts. When commercial wind turbines are installed on the building roof, average power and annual power generation enhanced by 3~4 times than normal wind velocity at 50m and 6 kw wind turbine can generate 1053 kwh per month on the 26 degree pitched roof at 50m height and sufficiently supply electrical power with 15 household for common electrical use and food waste disposer. However, power output will vary significantly by the wind conditions in the order of $\pm$ 20 %.

  • PDF

Fixed speed wind power generation system modeling and transient state stabilization method using PSCAD/EMTDC (PSCAD/EMTDC를 이용한 고정속 풍력발전시스템 모델링 및 과도상태 안정화기법)

  • Kim, Young-Ju;Park, Dae-Jin;Ali, Mohd Hasan;Park, Min-Won;Yu, In-Keun
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1178-1179
    • /
    • 2008
  • This paper describes a modeling of fixed speed wind power generation system which comprise of wind turbine, generator and grid. The wind turbine is based on MOD-2, which is IEEE standard wind turbine, and includes a component using wind turbine characteristic equation. Fixed speed induction generator is directly connected to grid, so the variation of wind speed has effects on the electrical torque and electrical output power. Therefore the power control mode pitch control system is necessary for aerodynamic control of the blades. But the power control mode does not operate at the fault condition. So it is required some methods to control the rotor speed at transient state for stabilization of wind power system. In this paper, simulation model of a fixed speed wind power generation system based on the PSCAD/EMTDC is presented and implemented under the real weather conditions. Also, a new pitch control system is proposed to stabilize the wind power system at the fault condition. The validity of the stabilization method is demonstrated with the results produced through sets of simulation.

  • PDF

Consideration on Pre-Feasibility Studies for Large-scale Offshore Wind Farms Led by Local Governments, Focusing on the Case of Shinan-gun (지자체 주도 대규모 해상풍력단지 사전 타당성 조사에 대한 고찰, 신안군 사례 중심으로)

  • Min Cheol Park;Ji Hoon Park;Gi Yun Lee;Chang Min Lee;Gwang Hyeok Yu;Hee Woong Jang;Hyun Sig Park
    • New & Renewable Energy
    • /
    • v.20 no.2
    • /
    • pp.65-70
    • /
    • 2024
  • The major challenge in promoting large-scale offshore wind power projects is securing local acceptance. Several recent studies have emphasized the crucial role of local governments in addressing this problem. However, local governments have difficulty in achieving clear results because of the lack of expertise and manpower in offshore wind power projects, making thempassive in promoting these initiatives. In this context, we briefly introduce the case of Shinan-gun, which recently successfully conducted a pre-feasibility study on a large-scale offshore wind power complex led by the local government.

Prospects of Cumulative Installed Power Capacity of Domestic Offshore Wind Projects for K-RE100 (K-RE100 이행에 필요한 국내해상풍력단지 누적 설치량 전망 연구)

  • Hong Goo Kang;Byung Ha Kim;Hun Jo Kim;Chang Jo Yang;Hae Chang Jeong
    • New & Renewable Energy
    • /
    • v.20 no.2
    • /
    • pp.44-54
    • /
    • 2024
  • The objective of this study was to contribute to domestic offshore wind farms by reasonably predicting the expected completion time and installed power generation capacity of offshore wind projects in South Korea. Offshore wind power is drastically regarded as a core tool for clean energy transition and industrial decarbonization in the fight against the climate crisis globally. Especially in South Korea offshore wind power is the main tool in partaking in RE100 and K-RE100, and the Korean government aims to install 14.9 GW of offshore wind farms by 2030. However, this seems to have been significantly delayed due to the complex process of obtaining permits for offshore wind power in Korea. Thus, a reasonable prediction of power generation and a timeline for the final construction are imperative. To establish the delay time for permit licenses, classified location factors were included into site analysis. These factors comprised reviews of transmission and military operability, environmental impact assessment, maritime traffic safety examination, wind resource assessment and an analysis of current offshore wind projects. According to the analysis, the majority of offshore wind projects currently being developed in Korea are predicted to be delayed by 3-5 years as they are among the criteria included in key discussion points for obtaining permits. The cumulative installed power capacity and annual power generation after construction are expected to be 37 GW and 97 TWh respectively.

Energy Yield, Power Quality and Grid Integration of Wind Energy Converters

  • Hanitsch R. E.
    • KIEE International Transaction on Electrical Machinery and Energy Conversion Systems
    • /
    • v.5B no.2
    • /
    • pp.97-102
    • /
    • 2005
  • Because of the limited fossil resources and the need to avoid emissions and toxic waste the future energy supply will be based on a large portion of renewable energies: wind-, solar-, biomass- and geothermal energy. Focus is on the utilization of wind energy coming from onshore- and offshore-sites. Generating electricity from wind is state of the art and feeding large amounts of wind power into the electrical grid will create some additional problems. Suggestions concerning energy storage will be made and the problem of power quality is discussed.

Performance of Wind-Photovoltaic Hybrid Generation System

  • Oh Jin-Seok
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.29 no.3
    • /
    • pp.319-324
    • /
    • 2005
  • This paper reports the performance of Wind-PV(Photovoltaic) hybrid system. The output power of PV is affected by the environmental factors such as solar radiation and cell temperature. Also, the output power of wind system is generated with wind power. Integration of Wind and PV resources, which are generally complementary, usually reduce the capacity of the battery. This paper includes discussion on system reliability, power quality and effects of the randomness of the wind and the solar radiation on system design.

Assessment of Wind Power Resources for Rural Green-village Planning (농촌 그린빌리지 계획을 위한 풍력에너지 자원분석)

  • Nam, Sang-Woon;Kim, Dae-Sik
    • Journal of Korean Society of Rural Planning
    • /
    • v.14 no.2
    • /
    • pp.25-32
    • /
    • 2008
  • Wind energy, which is one of renewable energy, would be useful resources that can be applied to making energy recycling villages without using fossil fuels. This study analyzed energy potential on wind power considering weather condition in three rural villages and compared with energy consumption surveyed. A wind turbine system in the 5kW class can generate 26.1%, 73.9% and 39.5% of the yearly mean consumption of electric power per house in Makhyun, Boojang and Soso respectively. A 750kW wind turbine system can generate 1.7%, 30.3% and 22.1% of the total amount of electric power consumption in three study villages respectively. Wind power energy density was too low in Makhyun and Soso, so it is determined that the application of wind turbine system is almost impossible. Wind energy potential was generally low in Boojang either, but it is evaluated that there is a little possibility of wind power generation relatively. For practical application of renewable energy to rural green-village planning, assessment of energy potential for the local area should be preceded.

A Study on Configuration of Small Wind Turbines for Maximum Capacity of Wind Power Systems Interconnected With a Building (빌딩 내 최대 풍력발전설비 연계를 위한 소형풍력발전원 구성에 관한 연구)

  • Lee, Yeo-Jin;Kim, Sung-Yul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.4
    • /
    • pp.605-612
    • /
    • 2017
  • One of the biggest environmental issues that our world has been facing is climate change. In order to cope with such environmental issues, the world is putting a great deal of effort into energy conservation. The building sector, in particular, consumes 36% of the energy consumed worldwide and emits considerable amount of greenhouse gases. Therefore, introduction of renewable energies in the building sector is highly recommended. Renewable energy sources that can be utilized in the building sector include sunlight, solar heat, geothermal heat, fuel cells and wind power. The wind power generation system which converts wind energy into electrical energy has advantages in that wind is an unlimited and pollution-free resource. It is suitable to be connected to existing buildings because many years of operational experience and the enhanced stability of the system have made it possible to downsize the electrical generator. In case of existing buildings, it is necessary to consider the live loads of the buildings to connect the wind power generation system. This paper, through the connection of the wind power generation with existing buildings, promotes reduction of greenhouse gas emissions and energy independence by reducing energy consumption in the building sector. In order to connect the wind power generation system with an exciting building, the live load of the building and the area of the rooftop should be considered. The installable model is selected by comparing the live load of the building and the load of the wind power generation system. The maximum number of the wind turbines that can be installed is obtained by considering the separation distance between the wind turbines within the area of the rooftop. Installations are divided into single installations and multiple installations of two different types of wind turbines. After determining the maximum installable number, the optimal model that can achieve the maximum annual power generation will be selected by comparing the respective total annual amount of the power generation of different models.

Development of PMSG Wind Power System Model using Wind Turbine Simulator and Matrix Converter (풍력터빈시뮬레이터와 매트릭스 컨버터를 적용한 PMSG 풍력발전 시스템 모델 개발)

  • Yun, Dong-Jin;Han, Byung-Moon;Cha, Han-Ju;Li, Yu-Long;Choi, Nam-Sup
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.6
    • /
    • pp.1130-1137
    • /
    • 2009
  • This paper describes a scaled model development of PMSG wind power system using wind turbine simulator and matrix converter. The wind turbine simulator, which consists of an induction motor with vector drive, calculates the output torque of a specific wind turbine using simulation software and sends the torque signal to the vector drive after scaling down the calculated value. The operational feasibility of interconnected PMSG system with matrix converter was verified by computer simulations with PSCAD/EMTDC software. The feasibility of hardware implementation was conformed by experimental works with a laboratory scaled-model of wind power system. The simulation and experimental results confirm that matrix converter can be effectively applied for the PMSG wind power system.

Voltage Impacts of a Variable Speed Wind Turbine on Distribution Networks

  • Kim, Seul-Ki;Kim, Eung-Sang
    • KIEE International Transactions on Power Engineering
    • /
    • v.3A no.4
    • /
    • pp.206-213
    • /
    • 2003
  • The main purpose of this paper is to present a simulation model for assessing the impacts of a variable speed wind turbine (VSWT) on the distribution network and perform a simulation analysis of voltage profiles along the wind turbine installed feeder using the presented model. The modeled wind energy conversion system consists of a fixed pitch wind turbine, a synchronous generator, a rectifier and a voltage source inverter (VSI). Detailed study on the voltage impacts of a variable speed wind turbine is conducted in terms of steady state and dynamic behaviors. Various capacities and different modes of variable speed wind turbines are simulated and investigated. Case studies demonstrate how feeder voltages are influenced by capacity and control modes of wind turbines and changes in wind speed under different network conditions. Modeling and simulation analysis is based on PSCAD/EMTDC a software package.