• Title/Summary/Keyword: Wind power accommodation

Search Result 4, Processing Time 0.016 seconds

MPC-based Two-stage Rolling Power Dispatch Approach for Wind-integrated Power System

  • Zhai, Junyi;Zhou, Ming;Dong, Shengxiao;Li, Gengyin;Ren, Jianwen
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.2
    • /
    • pp.648-658
    • /
    • 2018
  • Regarding the fact that wind power forecast accuracy is gradually improved as time is approaching, this paper proposes a two-stage rolling dispatch approach based on model predictive control (MPC), which contains an intra-day rolling optimal scheme and a real-time rolling base point tracing scheme. The scheduled output of the intra-day rolling scheme is set as the reference output, and the real-time rolling scheme is based on MPC which includes the leading rolling optimization and lagging feedback correction strategy. On the basis of the latest measured thermal unit output feedback, the closed-loop optimization is formed to correct the power deviation timely, making the unit output smoother, thus reducing the costs of power adjustment and promoting wind power accommodation. We adopt chance constraint to describe forecasts uncertainty. Then for reflecting the increasing prediction precision as well as the power dispatcher's rising expected satisfaction degree with reliable system operation, we set the confidence level of reserve constraints at different timescales as the incremental vector. The expectation of up/down reserve shortage is proposed to assess the adequacy of the upward/downward reserve. The studies executed on the modified IEEE RTS system demonstrate the effectiveness of the proposed approach.

Study on Multi-scale Unit Commitment Optimization in the Wind-Coal Intensive Power System

  • Ye, Xi;Qiao, Ying;Lu, Zongxiang;Min, Yong;Wang, Ningbo
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.6
    • /
    • pp.1596-1604
    • /
    • 2013
  • Coordinating operation between large-scale wind power and thermal units in multiple time scale is an important problem to keep power balance, especially for the power grids mainly made up of large coal-fired units. The paper proposes a novel operation mode of multi-scale unit commitment (abbr. UC) that includes mid-term UC and day-ahead UC, which can take full advantage of insufficient flexibility and improve wind power accommodation. First, we introduce the concepts of multi-scale UC and then illustrate the benefits of introducing mid-term UC to the wind-coal intensive grid. The paper then formulates the mid-term UC model, proposes operation performance indices and validates the optimal operation mode by simulation cases. Compared with day-ahead UC only, the multi-scale UC mode could reduce the total generation cost and improve the wind power net benefit by decreasing the coal-fired units' on/off operation. The simulation results also show that the maximum total generation benefit should be pursued rather than the wind power utilization rate in wind-coal intensive system.

The Characteristic of Wind Turbine Industry of the West-South Seashore of Leading Industry Development for Honam Economic Region (호남광역경제권의 서남해안 풍력산업 특성)

  • Cha, In-Su;Kim, Tae-Hyung;Lee, Ki-Bong
    • Proceedings of the KIPE Conference
    • /
    • 2010.07a
    • /
    • pp.101-102
    • /
    • 2010
  • This paper represents about the characteristics of wind turbine industry of the west-south seashore of Leading Industry Development for Honam Economic Region. These projects have 8 R&D and 3 non R&D project. The period of these projects is from October 2009 to April 2012. The R&D projects are composed three bright prospect products (1) the base construction of MW off-shore wind turbine components and system with Outer-rotor type PMSG, (2) the Development of 3MW wind power system with accommodation of the west-south seashore, and (3) the development of hybrid wind turbine system with wind base construction. Also, the non-R&D projects are composed three parts with above three bright prospect products. Above two projects support the companies with characteristic of low speed wind turbine system. Other project supports the companies related to wind turbine with small and medium capacity of form 3 kW to 10kW.

  • PDF

A Study on Actual Condition Analysis of Solar Thermal System Demonstrative Enterprise in the J City (J시 태양열 시범사업의 실태조사.분석에 관한 연구)

  • Yoo, Dong-Chul;Lee, Doo-Ho;Lee, Eung-Jik
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.04a
    • /
    • pp.80-85
    • /
    • 2011
  • As the instability of oil prices rose because of the situation in Libya, oil prices worldwide recorded the highest level due to the interference in supply. And so, in the 21st century, increasing efforts are being made to use clean new renewable energy centered on solar energy in accommodation of the cycle of nature instead of being reliant on the oil exporting nations. In order to reduce city energy internationally, the implementation of a low carbon city under the combined cooperation of industrial. construction, new renewable energy and transportation sectors with continuous development centered on low carbon green urban planning is now becoming established as the paradigm of the times. Recently, the government has begun carrying out the One Million Green Home Project, which is a project where the government with the goal of providing one million renewable energy homes by 2020 gives renewable energy subsidization for a partial amount of the standard unit price of installation when solar ray, solar heat, geothermal heat, small wind power or fuel cell energy is used. Thus, through this thesis which studies the state of and surveys the green village at Shingok-ri Songhak-myun Jaecheon-shi, it is the desire that the One Million Green Homes Project will be more efficiently developed and plans for improvement formed so that a high level of satisfaction in the product will be provided.

  • PDF