• Title/Summary/Keyword: Wind Park Siting

Search Result 5, Processing Time 0.02 seconds

Analysis of Wind Energy Resource & Case study for Wind Park Siting (풍력발전단지 개발을 위한 풍자원 해석 및 단지 설계)

  • Byun, Hyo-In;Ryu, Ji-Yune;Kim, Doo-Hoon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.21-24
    • /
    • 2005
  • This study explains the procedure that should be taken to develop a successful wind park project. It Provide guideline for activities and studies to be done step by step solution. This study follow a chronological flow through the development process. They cover Technical consideration, Assessment of Wind Energy Resource, Wind park siting and Energy yield calculation. It's build on the experience gained by the Youngduk Wind Park project and give the playa role in the development of wind energy projects. It is important to understand all theses issues if a new project is to be successfully completed.

  • PDF

The Study of the Wind Resource and Energy Yield Assessment for the Wind Park Development (풍력자원해석 및 에너지예측을 통한 풍력발전단지 설계 연구)

  • Byun, Hyo-In;Ryu, Ji-Yune;Kim, Doo-Hoon
    • New & Renewable Energy
    • /
    • v.1 no.2 s.2
    • /
    • pp.19-25
    • /
    • 2005
  • This study explains ther procedure that should be taken to develp a successful wind park project. It provides a guideline for the activities and studies to be done as a step by step solution. This study follows a chronological flow throughout the whole development Process. This Paper covers technical consideration, assessment of wind energy resource, wind Park siting and energy yield calculation This presented knowledge h3s been mostly gained by the experience from Youngduk wind park project. The further comparison study will be performed between the theoretical prediction and the actual yield of the Youngduk wind park.

  • PDF

Optimum Macro-Siting for Offshore Wind Farm Using RDAPS Sea Wind Model (RDAPS Sea Wind Model을 이용한 해상풍력발전단지 최적 Macro-Siting)

  • Lee, K.H.;Jun, S.O.;Park, K.H.;Lee, D.H.;Park, Jong-Po
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.286-290
    • /
    • 2011
  • This paper introduces the optimum macro-siting of a potential site for an offshore wind farm around Jeju Island using the RDAPS sea wind model. The statistical model was developed by analyzing the sea wind data from RDAPS model, and the meso-scale digital wind map was prepared. To develop the high resolution spatial calibration model, Artificial Neural Network(ANN) models were used to construct the wind and bathymetric maps. Accuracy and consistency of wind/bathymetric spatial calibration models were obtained using analysis of variance. The optimization problem was defined to maximize the energy density satisfying the criteria of maximum water depth and maximum distance from the coastline. The candidate site was selected through Genetic Algorithm(GA). From the results, it is possible to predict roughly a candidate site location for the installation of the offshore wind jam, and to evaluate the wind resources of the proposed site.

  • PDF

Estimating Spatial Scope of Local Government Ordinance for Onshore Wind Energy Generation Facilities (육상풍력 발전시설 지자체 규제 공간범위 산정 연구)

  • Sung Hee, Hong;So Ra, Kim;Eun Jung, Park;Hye Rim, Lee;Jin Young, Kim;Su Jin, Hwang;Jung Eun, Song
    • New & Renewable Energy
    • /
    • v.18 no.4
    • /
    • pp.38-53
    • /
    • 2022
  • T Recently, the government has been promoting the expansion and supply of renewable energy as an alternative for achieving carbon neutrality and the nationally determined contributions by 2030. In 2020, the Ministries of Industry and Environment and the Korea Forest Service collaborated to build a nationwide onshore wind energy siting atlas considering wind resources and forestry and environmental regulations focused on central regulations. In this study, the ordinances of the local governments were analyzed to examine the effects of regional location regulations on the expansion of onshore wind power energy generation facilities, in addition to those of central regulations. A development permit standard survey of 226 urban plan ordinances of the local governments nationwide showed that presently in 2022, 52 municipalities are applying regulations on wind energy generation facilities by ordinances. This is twice more than that in 2018, when renewable energy power generation facility development was difficult. Additionally, the location regulations applied by these ordinances were organized by items and regions, and regulatory characteristics, such as the number and scope, were analyzed by regions. To analyze the spatial distribution characteristics, JeollaNamdo was selected as the case area. A spatial DB was established for regulated areas based on the regional and central regulations, and the spatial distribution characteristics and the regulatory scope were compared and analyzed.

Environmentally Available Potential of Renewable Energy in Korea: Onshore Wind and Photovoltaic (육상풍력 및 육상태양광의 환경적 가용입지 분석)

  • Lee, Young-Joon;Park, Jong-Yoon
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.6
    • /
    • pp.339-354
    • /
    • 2021
  • The purpose of this study is to provide valuable information and data by analyzing the environmental status and potential forrenewable energy projects (or plans) based on environmental assessment (EA) data, so that more objective and scientific environmental assessments can be conducted. The study also suggests regional directions that could satisfy the goals of nature conservation and renewable energy. Based on the analysis of EA data that was conducted up until June 2019, the study analyzed the size, location and characteristics of both onshore wind power and onshore photovoltaic. The environmentally available potential by region was also derived by considering the main constraints and requirements related to the potential siting ofrenewable energy projects at the EA. Based on EA data, 63 out of 80 (79%) onshore wind power projects are shown to be located in mountainous areas. For onshore photovoltaic projects, a total of 7,363 projects were subjected to environmental assessment over the country. The environmentally potential area for onshore wind power, considering all the environmental regulatory factors, is 2,440 km2. For onshore photovoltaic, the environmentally available area estimated as idle farmland is 2,877 km2. The distribution and characteristics of the environmentally available potential of the region may be the most important factor that local governments should bear in mind in terms of promoting renewable energy development projects in the region. Based on the results of this study, even if we consider the national energy plan including the expected future increase, as well as environmental goals and socio-economic acceptance through an environmental assessment, the available resources forrenewable energy projects are not insufficient. It is possible to examine the adequacy of the target distribution rate of renewable energy sources by region taking into consideration the quantitative and scientific results such as the environmentally available potential data derived from this study.