• Title/Summary/Keyword: Well cost

Search Result 4,542, Processing Time 0.033 seconds

A Model of Dynamic Transportation Planning of the Distribution System Using Genetic Algorithm (유전 알고리듬을 이용한 물류시스템의 동적 수송계획 모형)

  • Chang Suk-Hwa
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.27 no.2
    • /
    • pp.102-113
    • /
    • 2004
  • This paper addresses the transportation planning that is based on genetic algorithm for determining transportation time and transportation amount of minimizing cost of distribution system. The vehicle routing of minimizing the transportation distance of vehicle is determined. A distribution system is consisted of a distribution center and many retailers. The model is assumed that the time horizon is discrete and finite, and the demand of retailers is dynamic and deterministic. Products are transported from distribution center to retailers according to transportation planning. Cost factors are the transportation cost and the inventory cost, which transportation cost is proportional to transportation distance of vehicle when products are transported from distribution center to retailers, and inventory cost is proportional to inventory amounts of retailers. Transportation time to retailers is represented as a genetic string. The encoding of the solutions into binary strings is presented, as well as the genetic operators used by the algorithm. A mathematical model is developed. Genetic algorithm procedure is suggested, and a illustrative example is shown to explain the procedure.

A Case Study on Building Cost Management Systems in a Valve Manufacturing Company (주조밸브제조업의 원가계산시스템 설계사례)

  • 박무현;도상호;배주한
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.55
    • /
    • pp.51-71
    • /
    • 2000
  • A case of company manufacturing industrial valves is studied. To survive the fierce competition in the low-volume, high-complexity production environment, the company needs accurate information on the cost of its products. Current cost accounting system which allocates production costs based on the weights of intermediates and final products cannot provide accurate cost information that managers really need. Data on the company's cost structure and production processes were reviewed and managers were interviewed before problems with the current costing system were identified. Activity-based costing (ABC) system as well as an improved traditional costing system is considered to replace the current system. A prototype of ABC system is developed to better represent the relationships among the cost drivers, activities, and products.

  • PDF

Optimal Seismic Reliability of Bridges Based on Minimum Expected Life Cycle Costs (최소기대비용에 기초한 교량의 최적내진신뢰성)

  • 조효남;임종권;심성택
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.10a
    • /
    • pp.249-256
    • /
    • 1999
  • This study is intended to propose a systematic procedure for the development of the reliability-based seismic safety and cost-effective Performance criteria for design and upgrading of long span PC bridges. In the paper, a set of cost function models for life cycle cost analysis of bridges is proposed. The total life cycle cost functions consist of initial cost and direct/indirect damage costs considering repair/replacement costs, human losses and property damage costs, road user costs, and indirect regional economic losses. The damage costs are successfully expressed in terms of Park-Ang median global damage indices and damage probabilities. The proposed approach is successfully applied to model bridges in both regions of a moderate seismicity area like Seoul, Korea and a high one like Tokyo, Japan. It may be expected that the proposed approach can be effectively utilized for the development of cost-effective performance criteria for design and upgrading of various types of bridges as well as long span PC bridges.

  • PDF

An Analysis of Safety Control Effectiveness in Construction (건설업 안전관리 효과분석에 관한 실증적 연구)

  • 갈원모;손기상;채준석
    • Journal of the Korean Society of Safety
    • /
    • v.11 no.1
    • /
    • pp.121-128
    • /
    • 1996
  • Estimating the cost of injuries and "accidents" to an organization is very important to figure out about how much well each organization has run his company and how much efficiently he has got the results using a certain amount of the expense for safety. Despite the potential usefulness to management of information as to the cost of a company's "accidents", it is not customary accounting practice to make these data available. Of the two general kinds of costs forced on a company by its occupational injuries and "accidents", the insurance cost and uninsured cost, -the former is by far the easier to find out. But actually, this uninsured cost should be figured out at each company. Authors have designed the generalized model to figure out the above problem costs to establish its efficient safety control. One construction company has been a pilot for this study. It is found that efficient safety control cost should be 1.2%~l.3% of total selling amount by analyzing actual data for three years.g actual data for three years.

  • PDF

A Solution Procedure for Minimizing Costs in Automated Storage/Retrieval Systems Design (자동창고비용 최소화 모델 및 해법에 관한 연구)

  • 나윤균;이동하
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.49
    • /
    • pp.1-10
    • /
    • 1999
  • A cost minimization model for designing AS/RS (Automated Storage/Retrieval Systems) has been developed, whose objective function includes penalty cost caused by the incapability of meeting throughput rate requirements as well as S/R machine cost, storage rack cost, and interface conveyor cost. Since the model is a nonlinear integer programming problem which is very hard to solve with large problem size the problem is divided into four cases according to the ratio of horizontal S/R machine speed to its vertical speed and the existence of the penalty cost. A solution procedure is developed which solves each problem exactly under the different number of S/R machines.

Project Cost Management in Construction Industry in Ho Chi Minh City

  • Kim, Soo-Yong;Tuan, Kiet Nguyen;Luu, Van Truong;Le, Tam Thuong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.70-71
    • /
    • 2015
  • Cost management always being the matters for project manager as well as other entities involved the construction projects. Vietnam is emerging country, many construction works were carried out and lot of construction projects will be developed in the near future with a huge investment capital come from outside and inside Vietnam. In recent years, international project management firms enter the Vietnam construction market, some issues emerged need to be solved. In which cost and schedule of the construction project was put in a thoroughly consider of not only project management team but also stakeholders. The research attempts to identify and assess the relationship of factors affecting the construction cost in construction phase in Ho Chi Minh City, Vietnam. Five main factor groups Owners/clients; Consultants; Contractors; Resource and Other were identified to propose the solution for cost management.

  • PDF

The Next Generation Photovoltaic Technology for Cost-Effective and High Efficiency (태양에너지를 이용한 차세대 저가·고효율 태양전지 기술)

  • Jeong, Chaehwan
    • Vacuum Magazine
    • /
    • v.3 no.2
    • /
    • pp.4-10
    • /
    • 2016
  • Photovoltaic technology has been intensively developed as one of the most powerful renewable energies, replacing a fossil fuel such as coal and petroleum. Every country in the world has emphasized on development of photovoltaic technology and our government has invested heavily in low cost and high efficiency. Korea institute of industrial technology (KITECH) has lastingly constructed PV R&D infra for development of cost-effective and high efficiency solar cells as well as support of commercialization in PV's small and medium enterprises. In this paper, we introduce the next generation PV R&D and infra in KITECH.

The study of ABC cost accounting system's effectiveness and analysis of costing information related to traditional cost accounting system (ABC원가계산시스템의 효과 및 전통적원가계산시스템과의 원가정보 분석에 관한 연구)

  • Park, Sang-Bong;Kim, Myung-Hi
    • Management & Information Systems Review
    • /
    • v.22
    • /
    • pp.117-136
    • /
    • 2007
  • The characteristic of this study is to compare and analyze costing information from ABC cost accounting system after ABC cost accounting system is designed and implemented from the manufacturing company's traditional cost accounting system through field researches. This is different from previous researches which investigate surveys or adoption procedures and contents of some companies already adopting ABC cost accounting system. Statistically, differences between costing information are not really similar. However, the advantage of ABC cost accounting system is to reduce some activities which do not well contribute creating value after analyzing productions and supporting activities of the company, and dividing into two groups, activities creating value and non-creating value. Therefore, the cost accounting information of ABC cost accounting system is very useful system to offer valuable information for the management of the company. The accuracy of information of ABC cost accounting system depends on setting up the central point of activities and implementing cost drivers. In particular, when it comes to supporting activities, choosing cost accounting grivers which are highly relevant to producing products and collecting data for cost accounting drivers is really difficult. This is the limitation of this study. In other words, when implementing cost accounting drivers of ABC cost accounting system, aconceptual framework is different from applying to the real producing place. Therefore, when implementing on ABC cost accounting system, future researches are needed to find cost accounting drivers which are more close to the theoretical model, and implement ABC cost accounting system which can collects relevant data.

  • PDF

PROPOSAL FOR DUAL PRESSURIZED LIGHT WATER REACTOR UNIT PRODUCING 2000 MWE

  • Kang, Kyoung-Min;Noh, Sang-Woo;Suh, Kune-Yull
    • Nuclear Engineering and Technology
    • /
    • v.41 no.8
    • /
    • pp.1005-1014
    • /
    • 2009
  • The Dual Unit Optimizer 2000 MWe (DUO2000) is put forward as a new design concept for large power nuclear plants to cope with economic and safety challenges facing the $21^{st}$ century green and sustainable energy industry. DUO2000 is home to two nuclear steam supply systems (NSSSs) of the Optimized Power Reactor 1000 MWe (OPR1000)-like pressurized water reactor (PWR) in single containment so as to double the capacity of the plant. The idea behind DUO may as well be extended to combining any number of NSSSs of PWRs or pressurized heavy water reactors (PHWRs), or even boiling water reactors (BWRs). Once proven in water reactors, the technology may even be expanded to gas cooled, liquid metal cooled, and molten salt cooled reactors. With its in-vessel retention external reactor vessel cooling (IVR-ERVC) as severe accident management strategy, DUO can not only put the single most querulous PWR safety issue to an end, but also pave the way to very promising large power capacity while dispensing with the huge redesigning cost for Generation III+ nuclear systems. Five prototypes are presented for the DUO2000, and their respective advantages and drawbacks are considered. The strengths include, but are not necessarily limited to, reducing the cost of construction by decreasing the number of containment buildings from two to one, minimizing the cost of NSSS and control systems by sharing between the dual units, and lessening the maintenance cost by uniting the NSSS, just to name the few. The latent threats are discussed as well.

A New Cost Calculation Scheme for the Service Allocation to Transponders in the Satellite Communication Systems (위성통신 서비스별 중계기 할당을 위한 cost 설정 방법)

  • 고성찬;박세경;김재명
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.21 no.1
    • /
    • pp.196-205
    • /
    • 1996
  • Severice allocation to satellite transponders under consideration of interference caused by inter-satellite and intra-satellite systems is one of the most important issue in terms of optimal usage of satellite network resource. In this paper, we present a new and show several simulation results to verify the proposed method. Especially, our concerns are concentrated on the cost (interference) matrix which is believed to be optimal in obtaining the service allocation plan. The method and concepts presented in this paper may be well applicable to making a plan for service assignment of the satellite communication systems.

  • PDF