Reassessment on the Four Major Rivers Restoration Project and the Weirs Management (4대강 살리기사업의 재평가와 보의 운용방안)

  • Lee, Jong Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.4
    • /
    • pp.225-236
    • /
    • 2021
  • The master plan for the Four Rivers Restoration Project (June 2009) was devised, the procedure of pre-environmental review (June 2009) and environmental impact assessment (Nov. 2009), and post-environmental impact survey were implemented, and 4 times audits also inspected. and finally the Ministry of Environment's Four Rivers Investigation and Evaluation Planning Committee proposed the dismantling or partial dismantling of the five weirs of the Geum River and Yeongsan River. But controversies and conflicts are still ongoing. Therefore, this study intend to reestablish the management plan for the four major rivers by reviewing and analyzing the process so far. The results are as follows. First, a cost-benefit analysis should be performed by comparing the water quality impact of weir operation and weir opening. Therefore, it is inevitably difficult to conduct cost-benefit analysis. Second, according to the results of cost-benefit analysis on the dismantling of the Geum River and the Yeongsan River, the dismantling of the weir and the regular sluice gate opening was decided. However, there is a problem in the validity of the decision to dismantle the weir because the cost-benefit analysis for maintaining the weir is not carried out. Third, looking at the change in water quality of 16 weirs before and after the Four Major Rivers Restoration Project, COD and Chl-a were generally deteriorated, and BOD, SS, T-N, and T-P improved. However, in the cost-benefit analysis related to water quality at the time of weir dismantling, only COD items were targeted. Therefore, the cost of BOD, SS, T-N, and T-P items improved after the project were not reflected in the cost-benefit analysis of dismantling weirs, so the water quality benefits were exaggerated. Fourth, in the case of Gongju weir and Juksan weir, most of them are movable weirs, so opening the weir alone can have the same effect as dismantling when the water quality deteriorates. Since the same effect can be expected, there is little need to dismantle the weirs. Fifth, in order to respond to frequent droughts and floods, it is desirable to secure the agricultural water supply capacity to the drought areas upstream of the four majorrivers by constructing a waterway connected to the weir. At present it is necessary to keep weirs rather than dismantling them.

Time-series Changes in Particle Size Characteristics of Suspended Sediment at the Seungchon and the Juksan Weir in the Yeongsan River (영산강 부유하중의 시계열적 입도 특성 변화: 승촌보, 죽산보를 중심으로)

  • Lim, Young Shin;Kim, Jin Kwan
    • Journal of The Geomorphological Association of Korea
    • /
    • v.26 no.4
    • /
    • pp.1-20
    • /
    • 2019
  • In order to establish appropriate policy to control sediment-associated problems, it is necessary to identify the physical characteristics of the reservoir sediments in particulate form in the Yeongsan River. Two time-integrated suspended sediment samplers were installed at Seungchon and Juksan weir on the upper and middle Yeongsan River in July 2012. Reservoir sediment samples were obtained at monthly intervals until October 2014. During the monitoring period, a total of 38 sediment samples were obtained and analyzed. Seasonal trends of suspended sedimentation rates and grain size distributions were examined based on variations in precipitation and discharge fluctuations. Moreover, stream flow characteristics, which has a great influence on the physical characteristics of the river sediment, was analyzed using flow duration curve for the period 2003-2019 at Naju gauging station. Sedimentation rates during summer, when heavy rainfall was concentrated due to the monsoonal front and typhoon, were very high, indicating the positive relationship between sediment concentration and discharge. Particle size analysis of the collected sediment showed that coarse silt and very fine sand-sized sediment dominated most of the Seungchon weir sediment. On the other hand, medium silt-sized sediment dominated the downstream Juksan weir except for a few summer samples. These results implied that the physical characteristics of the suspended sediment are determined not only due to flow fluctuations, but also with regard to the antecedent rainfall conditions, hillslope-channel connectivity, and the supply of materials from various contributing regions. This information about flow characteristics and temporal variations in reservoir sediment can be used for safe management of the weir and discussing the issues on the dismantling of the weirs.