Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

Plossom : Spring Boot를 활용한 웹 기반 프로젝트 관리 시스템 (Plossom : Web-based Project Management System Using Spring Boot)

  • 이한성;조보현;김희중;신지영;이형우
    • 사물인터넷융복합논문지
    • /
    • 제2권3호
    • /
    • pp.17-24
    • /
    • 2016
  • 본 논문에서는 편리하고 효율적인 프로젝트를 관리하기 위한 웹 응용 시스템인 Plossom을 개발하였다. Plossom의 개발은 HTML과 Bootstrap 프레임 워크를 이용하여 웹페이지를 구성하였으며, JQuery를 이용하여 웹페이지에 맞는 알고리즘을 사용해 로직을 구축하였고, Spring의 Thymeleaf와 MySQL을 활용하여 프로젝트 정보를 외부 시스템과 연동하여 체계적인 관리를 할 수 있도록 하였다. 본 연구에서 개발한 Plossom 통합 프로젝트 관리 시스템을 이용할 경우 IoT 및 ICT 관련 프로젝트에 대한 개발 과정에 매우 유용하게 활용할 수 있을 것으로 기대된다.

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2006년도 춘계공동학술대회 논문집
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

웹과 모바일 기술을 이용한 프레스 금형의 불량관리에 관한 연구 (The Fault Management of Press Dies using Web and Mobile Technologies)

  • 이강걸;노상도;이인석;송명환
    • 산업공학
    • /
    • 제18권1호
    • /
    • pp.88-93
    • /
    • 2005
  • There has been many research activities in the area of fault managements in distributed manufacturing environments. This paper proposes and implements web-based fault managements using web and mobile technologies. Web-based project document management system, web-based fault management system and web-based tryout management system are developed and adopted to the press die shop of a Korean automotive company. To do that, as-is and to-be business processes for fault managements are constructed. Because of its distributed environments of shops, necessities of using the mobile technology are proposed. New application for fault managements using WWW, wireless LAN, SMS and mobile phone are suggested and implemented in this paper. Using this system, agile, convenient and reliable way of fault management is realized, and knowledge management for the die manufacturing become possible.

WEB-BASED SERVICE REQUEST & FEEDBCK SYSTEM: THE LIFE CYCLE MANAGEMENT AS CONTINUOUS CUSTOMIZATION OF FACILITY INFORMATION

  • Jinsu Jeong;Kwang Jun Lee;Valerian Miranda
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.836-840
    • /
    • 2005
  • This research investigates the feasibility of Web technology as a means of delivering facility information for better support facility operation and maintenance. Our research proposes a Web-based feedback system as a pragmatic solution to the limitations of current FM (Facility Management) processes. In practice work orders and records are often misplaced resulting in lower efficiency and customer satisfaction. This may be overcome by a system that states information digitally and provides a Web-based interface. The interface could allow customers to report facility problems, trace their work order in progress, view schedules for maintenance and provide feedback for service online. The benefit for a FM department is that it can receive feedback on performance which would improve the quality of service and build a record of practical experiences.

  • PDF

위키기반 프로젝트학습에서의 협력 지식 관리의 고찰 (A Collaborative Knowledge Management in Wiki-based Project Learning)

  • 이진태;한선관
    • 정보교육학회논문지
    • /
    • 제15권4호
    • /
    • pp.525-531
    • /
    • 2011
  • 본 논문은 위키 기반 프로젝트 학습에서 지식관리 유형에 대한 연구이다. 프로젝트 학습에서 학습자에게 일어나는 지식의 흐름을 분석하기 위하여 SECI 지식관리 이론을 적용하여 위키 프로젝트 학습 시스템을 구현하였다. 구현된 시스템을 통하여 프로젝트 학습을 진행하여 단계별 지식관리의 유형을 분석하였다. 분석결과 예비계획 단계에서 암묵지를 바탕으로 새로운 지식을 만드는 표출화가 두드러지게 나타났다. 그리고 주제결정 단계와 활동계획 단계에서 지식의 연결화 과정이 나타났다. 또한 탐구 및 토의단계에서는 표출화와 연결화가 두드러지며 내면화 유형이 타나나기 시작했다. 결과공유 단계에서는 지식의 연결화가 가장 많이 나타났다. 여섯째, 반성 및 평가단계에서는 내면화 유형이 가장 많이 나타났으며, 지식의 평가를 위한 연결화 과정도 보였다. 이 연구는 프로젝트 학습에서 학습자의 지식관리 유형을 밝혀냄으로써 프로젝트 학습모형의 정교화에 기여할 수 있을 것이다.

  • PDF

그룹프로젝트관리 지원을 위한 웹기반 정보보고시스템의 설계 및 구현 (Design and Implementation of Web-based Information Reporting System for Group Project Management)

  • 김명옥;박은별
    • 한국전자거래학회지
    • /
    • 제15권4호
    • /
    • pp.245-263
    • /
    • 2010
  • 최근 국내 대기업들은 세분화된 팀조직을 그룹조직으로 확대 운영함으로서 프로젝트업무의 유동성과 조직 인력활용의 유연성을 가져왔지만 프로젝트를 추진함에 있어 의사소통체계가 복잡해지게 되는 문제가 발생하게 되었다. 대부분 대기업들이 사용하는 전사적 자원관리시스템은 정보배포에 초점을 맞추고 있어 그룹 내 프로젝트관리 의사소통의 문제를 효율적으로 해결하지 못하고 있는 것으로 조사되었다. 본 연구에서는 국내 제조건설 분야 대기업에 적용할 수 있는 그룹프로젝트관리 지원을 위한 웹 기반 정보보고시스템(WIRS : Webbased Information Reporting System)을 설계하고 프로토타입을 구현하였다. WIRS 구현을 통해 대규모 프로젝트의 시작에서부터 종료까지 소그룹 내 신속하고 원활한 의사소통 지원이 가능하게 되었고 전사적자원관리시스템의 커뮤니케이션 역량을 보완할 수 있게 된 데에 본 연구의 의의가 있다. 구체적으로 WIRS의 기능 설정하기 위해 현장 요구조사를 실시하였고 조사 결과를 바탕으로 데이터베이스를 설계하고 WIRS 프로세스 모델 설정을 위한 분석 및 기획을 수행하였다. 결과물에 대한 사용자 피드백은 대체로 긍정적이었으며, 특히 프로젝트 진행 관련 웹상에서 보고가 이루어진다는 점, 일일메모를 통하여 주간 보고서와 월간보고서가 자동적으로 생성된다는 점, 지시생성 및 일정정보공유기능 등을 긍정적으로 평가되었다.

CHECKLIST FOR ENVIRONMENTAL FRIENDLY CONSTRUCTION MANAGEMENT IN DESIGN PHASE

  • In-Su Jung;Hyun-Su Park;Chan-Sik Lee
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.376-385
    • /
    • 2007
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment preservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. For the building or construction project, its possible impact on environment during construction work and after completion must be predicted at its design phase, which will result in the completion of the architecture convenient for human being with its environmental pollution reduced to minimum level. In this study, the checklist of environmental factors was suggested, which should be taken into account at its design phase in conducting the construction work. Proposed checklist was linked with the developed web-based system for the convenience of users like designer and construction manager, etc. It is expected that the checklist suggested by this study will help the designer and construction manager to continue the steady development from the environmental viewpoint during the design phase.

  • PDF

예측적 공간정보 모형을 이용한 Web 기반의 환경관리시스템의 개발 및 적용 (Web Based Environmental Management System using Predictive Spatial Information Models)

  • 김준현;한영한
    • 환경영향평가
    • /
    • 제8권4호
    • /
    • pp.47-57
    • /
    • 1999
  • 본 연구는 G7 과제의 일환으로서, Internet상에서 운영될 수 있는 광역적 환경 관리 시스템의 개발에 목표를 두었다. 이러한 목적을 달성하기 위해서는 아직 더 많은 연구가 수행되어야 하지만, 예비적인 개발 성과를 다음과 같이 요약할 수 있다 : 1) 통합적 환경 정보 관리 시스템, 2) web 기반의 제어 엔진, 3) 지표수환경 관리 시스템, 4) 지하수환경 관리 시스템, 5) 하수도 및 시설 관리 시스템. 본 엔진의 핵심 방법론은 다양한 편미분 방정식의 해석에 있어서 각 미분항을 서술하는 범용적 다차원 유한요소 행렬이다. GUI 지향적인 web 기반의 시스템을 구축하기 위해 공간 정보 관리 시스템(ArcView) 및 Visual Basic이 폭넓게 사용되었다. 개발된 시스템들은 환경 문제의 복합적인 관리의 필요성으로 인해 매우 집약적인 프로그램으로 구성되었다. web 기반의 엔진은 환경관련 사업의 통합적인 관리를 위한 정책 결정 도구로 제공될 수 있을 것이다.

  • PDF