The 2th International Conference on Construction Engineering and Project Management
/
pp.376-385
/
2007
Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment preservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. For the building or construction project, its possible impact on environment during construction work and after completion must be predicted at its design phase, which will result in the completion of the architecture convenient for human being with its environmental pollution reduced to minimum level. In this study, the checklist of environmental factors was suggested, which should be taken into account at its design phase in conducting the construction work. Proposed checklist was linked with the developed web-based system for the convenience of users like designer and construction manager, etc. It is expected that the checklist suggested by this study will help the designer and construction manager to continue the steady development from the environmental viewpoint during the design phase.
Lim, Jinkang;Lee, Jaewook;Lee, Seunghye;Kim, Han Soo;Jung, Sungwon
한국BIM학회 논문집
/
제5권4호
/
pp.37-46
/
2015
In a construction project, collaboration amongst the project participants is a critical factor for high-quality results and successful completion of the project. Owing to the advance of information technologies, web-based systems have become more common in the construction industry, but research and development has been made for only limited areas. For organized and systematic collaboration in various fields, collaboration systems have to be developed in a holistic manner based on diverse needs from the whole construction industry. This study aims to investigate the current status of web-based collaboration systems from structural engineers' perspectives and propose an improvement plan. For a systematic analysis of selected cases, we apply a classification of three developmental stages depending on interoperability and organizational levels: structural design and analysis, collaborative design, and integrated design management. Thereafter, the characteristics of each stage are extracted and comparatively analyzed. Lastly, three functional factors were proposed for the improvement of web-based collaboration systems for structural design.
본 논문은 위키 기반 프로젝트 학습에서 지식관리 유형에 대한 연구이다. 프로젝트 학습에서 학습자에게 일어나는 지식의 흐름을 분석하기 위하여 SECI 지식관리 이론을 적용하여 위키 프로젝트 학습 시스템을 구현하였다. 구현된 시스템을 통하여 프로젝트 학습을 진행하여 단계별 지식관리의 유형을 분석하였다. 분석결과 예비계획 단계에서 암묵지를 바탕으로 새로운 지식을 만드는 표출화가 두드러지게 나타났다. 그리고 주제결정 단계와 활동계획 단계에서 지식의 연결화 과정이 나타났다. 또한 탐구 및 토의단계에서는 표출화와 연결화가 두드러지며 내면화 유형이 타나나기 시작했다. 결과공유 단계에서는 지식의 연결화가 가장 많이 나타났다. 여섯째, 반성 및 평가단계에서는 내면화 유형이 가장 많이 나타났으며, 지식의 평가를 위한 연결화 과정도 보였다. 이 연구는 프로젝트 학습에서 학습자의 지식관리 유형을 밝혀냄으로써 프로젝트 학습모형의 정교화에 기여할 수 있을 것이다.
본 연구에서는 해외 국가 웹 아카이빙 사례들을 인터페이스 유형 및 특성들을 항목별로 분석하고 살펴보았다. 이를 위하여 다섯 개의 인터페이스 영역과 열네 개의 평가 항목을 선정하였으며, 해외사례 및 국내 OASIS를 대조하여 분석한 결과, 국내의 경우에는 검색 인터페이스 및 지원기능 인터페이스 영역에의 보강이 필요함을 확인하였다. 또한 해외 사례의 참조를 통하여 국내의 경우 수집 대상 웹 콘텐츠 주제 영역의 다양화, 웹 자원 수집의 분담화, 특별 컬렉션의 구성, 아카이빙 시점 및 흐름의 시각화, 체계적인 아카이빙 전략 수행, 그리고 국제기구와의 적극적 협력 등이 강화되어야 함을 확인하였다.
차세대 웹 서비스로서 Web2.0 이 주목받고 있다. 이러한 웹2.0 서비스를 제공하기 위한 핵심 RIA(Rich Internet Application) 제공 기술로 Ajax(Asynchronous Javascript And XML)기술이 주목 받고 있으며, 이를 기반한 다양한 웹 어플리케이션이 개발 및 서비스 되고있다. 본 논문에서는 Ajax 기반의 웹 어플리케이션 중 스케쥴 관리 프로그램을 살펴보곤 프로젝트 진행시 사용할 수 있는 프로젝트 스케쥴러와 그와 연동되는 프로젝트 로드맵 프로그램을 Ajax 기반의 웹 어플리케이션으로 개발하였다.
Tai Sik Lee ;Kyoung Soon Park ;Ja Kyoung Koo ;Young Hyun Kim
국제학술발표논문집
/
The 1th International Conference on Construction Engineering and Project Management
/
pp.1250-1255
/
2005
Application of radio frequency Identification (RFID) technology in construction industry is not that progressive compared with other industries, because of it's high price experimental research. This research focus on potential application of RFID which eliminate manual data entry and introduce the potential for automated processes to increase project productivity, construction safety, and project cost efficiency. This paper suggest an invoiceless system using RFID technology, Process productivity and efficiency for material management is observed through WebCYCLONE and is compared with other processes.
사용성에 대한 사람들의 관심이 증가하고 있는 반면, 사용성 평가 계획의 수립과 진행, 평가결과의 수집과 분석을 지원하는 시스템은 미비한 실정이다. 사용성 평가는 크게, 사용성 평가 계획 수립, 실제 평가 진행, 평가 후 결과 수집 및 분석의 절차를 가지고 있으며, 본 논문에서는 사용성 평가의 전 과정에서 활용할 수 있는 웹 기반 사용성 평가 시스템을 설계 및 구현하였다. 따라서, 사용성 평가에 참가하는 참가자들은 언제 어디서나 기기에 상관없이 효과적으로 사용성 평가에 참여하고, 사용성 평가 책임자는 평가 관련 문서와 결과 데이터를 보다 효율적으로 관리하고 평가의 전 과정의 진행에서 신뢰도를 높일 수 있는 시스템을 구현하는 데 목표를 두었다. 웹 기반 사용성 평가 시스템은 제품의 사용성 평가를 실제 사용하는 장소에서 바로 수행할 수 있다는 장점과 이동이 불편한 장애인 대상 제품의 사용성 평가에 유용할 것으로 기대한다.
Baek, Seungwon;Han, Seung Heon;Lee, Changjun;Jang, Woosik;Ock, Jong Ho
국제학술발표논문집
/
The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
/
pp.291-296
/
2017
Infrastructure development as national project suffers from social conflict which is one of main risk to be managed. Social conflicts have a negative impact on not only the social integration but also the national economy as they require enormous social costs to be solved. Against this backdrop, this study analyzes social conflict using articles published by online news media based on web-crawling and natural language processing (NLP) techniques. As an illustrative case, the Jeju Naval Base (JNB) project which is one of representative conflict case in South Korea is analyzed. Total of 21,788 articles and representative keywords are identified annually. Additionally, comparative analysis is conducted between the extracted keywords and actual events occurred during the project. The authors explain actual events in the JNB project based on the extracted words by the year. This study contributes to analyze social conflict and to extract meaningful information from unstructured data.
The 5th International Conference on Construction Engineering and Project Management
/
pp.352-358
/
2013
As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner
c-PMS(collaborative project management system) is a business process(BP) based tool to manage collaborative projects which accomplish common business objectives determined by mutual agreement of companies using limited resources and time. This study analyzes collaborative BP, collaborative projects, and their relation, and proposes the architecture and operation scenario of c-PMS consisted of business process asset management(BPAM) sub-system and project manage(PM) sub-system. BPAM sub-system models private and public BP using a client/server based modeler, defines collaborative BPs process from public BPs, and manages them as companies' asset on a web portal. PM sub-system globally manages collaborative project using planning, execution, monitoring, and analyzing functions.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.