• Title/Summary/Keyword: Watershed Pollution

Search Result 526, Processing Time 0.021 seconds

Study on Representation of Pollutants Delivery Process using Watershed Model (수질오염총량관리를 위한 유역모형의 유달 과정 재현방안 연구)

  • Hwang, Ha Sun;Rhee, Han Pil;Lee, Sung Jun;Ahn, Ki Hong;Park, Ji Hyung;Kim, Yong Seok
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.6
    • /
    • pp.589-599
    • /
    • 2016
  • Implemented since 2004, TPLC (Total Pollution Load Control) is the most powerful water-quality protection program. Recently, uncertainty of prediction using steady state model increased due to changing water environments, and necessity of a dynamic state model, especially the watershed model, gained importance. For application of watershed model on TPLC, it needs to be feasible to adjust the relationship (mass-balance) between discharged loads estimated by technical guidance, and arrived loads based on observed data at the watershed outlet. However, at HSPF, simulation is performed as a semi-distributed model (lumped model) in a sub-basin. Therefore, if the estimated discharged loads from individual pollution source is directly entered as the point source data into the RCHRES module (without delivery ratio), the pollutant load is not reduced properly until it reaches the outlet of the sub-basin. The hypothetic RCHRES generated using the HSPF BMP Reach Toolkit was applied to solve this problem (although this is not the original application of Reach Toolkit). It was observed that the impact of discharged load according to spatial distribution of pollution sources in a sub-basin, could be expressed by multi-segmentation of the hypothetical RCHRES. Thus, the discharged pollutant load could be adjusted easily by modification of the infiltration rate or characteristics of flow control devices.

Water Quality Management System for a Farm Village Stream -watershed monitoring and the system design- (농촌마을 하천의 수질관리 시스템 - 시험유역 조사 및 시스템 설계 -)

  • 정하우;최진용
    • Journal of Korean Society of Rural Planning
    • /
    • v.2 no.2
    • /
    • pp.109-117
    • /
    • 1996
  • The purpose of this study Is to develop water quality management system fort a farm village stream. The framework design of the system and the ecological monitoring of a test watershed were carried out, The system consists of GIS(Geographic Information System ), database, pollution source management, water quality and hydrologic analysis. Suri watershed located on Idong, Yongin city, Kyunggi Province, was selected as the test watershed for the application of the system. The fifteen's monitoring stations were chooses at up- and down-stream of the watershed. The results of an aquatic ecological monitoring were analyzed by the GPI(Group Pollution Index) method. The GPI revealed that water quality was varied within the stream. GPI and DO map for the watershed stream were developed, These maps facilitated to analyze the spatial distribution of the water quality.

  • PDF

Lake Water Quality Modelling Considering Rainfall-Runoff Pollution Loads (강우유출오염부하를 고려한 호수수질모델링)

  • Cho, Jae-Heon;Kang, Sung-Hyo
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.2
    • /
    • pp.59-67
    • /
    • 2009
  • Water quality of the Lake Youngrang in the Sokcho City is eutrophic. Jangcheon is the largest inflow source to the lake. Major pollutant sources are stormwater runoff from resort areas and various land uses in the Jangcheon watershed. A storm sewer on the southern end of the lake is also an important pollution source. In this study, water quality modelling for Lake Youngrang was carried out considering the rainfall-runoff pollution loads from the watershed. The rainfall-runoff curves and the rainfall-runoff pollutant load curves were derived from the rainfall-runoff survey data during the recent 4 years. The rainfall-runoff pollution loads and flow from the Jangcheon watershed and the storm sewer were estimated using the two kinds of curves, and they were used as the flow and the boundary data of the WASP model. With the measured water quality data of the year 2005 and 2006, WASP model was calibrated. Non-point pollution control measures such as wet pond and infiltration trench were considered as the alternative for water quality management of the lake. The predicted water quality were compared with those under the present condition, and the improvement effect of the lake water quality were analyzed.

ANALYSIS OF NON-POINT SOURCE POLLUTION LOADING IN A SMALL RURAL WATERSHED USING HIGH SPATIAL RESOLUTION IMAGE

  • Park, Jong-Yoon;Lee, Mi-Seon;Kim, Seong-Joon
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.229-233
    • /
    • 2007
  • This study is to test the applicability of QuickBird image for non-point source pollution assessment. SWAT (Soil and Water Assessment Tool) model was adopted and the model was calibrated for a stream watershed of 255.4 $km^2$ Landsat land use data. For model application with QuickBird image, a precise agricultural land use map of 1.16 $km^2$ area located in the upstream watershed was produced by field investigation. The model was run with the combination of land use and soil map scales (1:5,000, 1:25,000 and 1:50,000). The results were compared and analyzed for the contribution of non-point source pollution by the land use scale and contents.

  • PDF

Implementations of Remote Sensing, GIS, and GPS for Water Resources and Water Quality Monitoring

  • Wu, Mu-Lin;Chen, Chiou-Hsiung;Liu, Shiu-Feng;Wey, Jiun-Sheng
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.1191-1193
    • /
    • 2003
  • Water quantity and quality monitoring at Taipei Watershed Management Bureau (WRATB) is not only a daily business but also a long term job. WRATB is responsible for providing high quality drinking water to about four millions population in Taipei. The quality of drinking water provided by WRATB is among one of the best in Taiwan. The total area is 717 square kilometers. The water resource pollution is usually divided into two categories, point source pollution and nonpoint source pollution. Garbage disposal is the most important component of the point source pollution, especially those by tourist during holidays and weekends. Pesticide pollution, fertilizer pollution, and natural pollution are the major contributions for nonpoint source pollution. The objective of this paper is to implement remote sensing, geographic information systems, and global positioning systems to monitor water quantity and water quality at WRATB. There are 12 water quality monitoring stations and four water gauge stations at WRATB. The coordinates of the 16 stations were determined by GPS devices and created into the base maps. MapObjects and visual BASIC were implemented to create application modules for water quality and quantity monitoring. Water quality of the two major watersheds at WRATB was put on Internet for public review monthly. The GIS software, ArcIMS, can put location maps and attributes of all 16 stations on Internet for general public review and technical implementations at WRATB. Inquiry and statistic charts automatic manipulations for the past 18 years are also available. Garbage disposal by community and tourist were also managed by GIS and GPS. The storage, collection, and transportation of garbage were reviewed by ArcMap file format. All garbage cart and garbage can at WRATB can be displayed on the base maps. Garbage disposal by tourist during holidays and weekends can be managed by a PDA with a GPS device and a digital camera. Man power allocation for tourist garbage disposal management can be done in an integration of GIS and GPS. Monitoring of water quality and quantity at WRATB can be done on Internet and by a PDA.

  • PDF

The Regional Characteristics of Nonpoint Source Pollutant Loads in Mid-stream of Nakdong River (낙동강 중류유역의 지역별 비점오염 특성)

  • Son, Seong-Ho;Choe, Gyeong-Suk
    • KCID journal
    • /
    • v.14 no.2
    • /
    • pp.181-193
    • /
    • 2007
  • The characteristics of non-point source pollutant loads in middle-stream of Nakdong River Were studied through analysis of pollutant loads of 8 sub-watersheds divided based on administrative district. The pollutant concentration of each sub-watershed was collected from Nakdong-River Water Research Institute and Daegu Regional Environmental Office, respectively. Pollution items analysed in this study were BOD, SS, T-N and T-P. High degree of non-point pollution was observed from Gumi, Goryeong, Gyeongsan, Daegu and Sungju, and pollution was usually increased during rainy season. This result indicates that a given pollution condition within the watershed can be more sensitive than location factor to the level of water quality. The main sources of non-point pollution were population and livestock, as well as landuse factor, and were found to significantly contribute to the water pollution. Alternative solutions for controlling pollution sources, therefore, should be provided to meet target levels of water quality in this region.

  • PDF

Selection of Best Management Practices for Urban Watershed Corresponding to the Runoff Characteristics from Non-point Pollution Sources (도시지역의 비점오염유출특성을 고려한 도시하천 적정관리방안)

  • Chi, Hong-Jin;Shin, Gwy-Am
    • Journal of Environmental Science International
    • /
    • v.25 no.1
    • /
    • pp.31-40
    • /
    • 2016
  • The purpose of this study was to analyse the runoff characteristics of non-point pollution sources in an urban watershed and determine the effectiveness of newly installed riverwater treatment system to reduce water pollution caused by storm runoff in the urban watershed. The results of this study showed that the levels of BOD5 and suspended solid were highly influenced by first-flush effect and the pollutant load of those two parameters were also very high in the urban watershed. Meanwhile, the effectiveness of riverwater treatment system to reduce the levels of BOD5 and suspended solid was relatively high, but those to reduce the levels of T-N and T-P was low, which needs some additional unit treatment process such as filtration and coagulation. Nonetheless, the riverwater treatment system tested was relatively simple in installation and operation, effective in removing many water pollutants and, most importantly, does not require much space as other treatment systems, so it could be an attractive alternative option to reduce riverwater pollution caused by storm runoff in urban watersheds.

Estimation of Pollution Loads from the Yeongsan River Basin using a Conceptual Watershed Model (개념적 유역모델을 이용한 영산강 유역 오염부하 유출량의 시공간적 분포평가)

  • Park, Min-Hye;Cho, Hong-Lae;Koo, Bhon-Kyoung
    • Journal of Korean Society on Water Environment
    • /
    • v.30 no.2
    • /
    • pp.184-198
    • /
    • 2014
  • For estimating discharge and pollution loads into the Yeongsan lake, a conceptual watershed model HSPF(Hydrological Simulation Program - Fortran) was applied to the Yeongsan River Basin. Various spatial data set including DEM, watershed boundaries and land uses were used to set up the model for the Yeongsan River Basin that was divided into 45 sub-basins. The model was calibrated and validated for the river discharges, SS, BOD, TN and TP concentrations against the data observed in 2011 at several monitoring stations. The simulation results show good agreement with the observed water flows($R^2$ = 0.46 - 0.97, NSE = 0.70 - 0.96). The simulated concentrations of SS, BOD, TN and TP are also in good agreement with the observed. The total freshwater discharge to the Yeongsan lake is estimated $2,406{\times}10^6m^3/year$ which the Jiseok and Hwangryoung stream contribute as much as 19%, 17% respectively. It is estimated that the total discharges to the Youngsan lake is SS 152,327 ton/year, BOD 15,721 ton/year, TN 10,071 ton/year, TP 563 ton/year. Both water and pollution loads are high in summer, particularly in July, when the monsoon season arrives at the Korean peninsula.

Excessive State of Pollutant Load Allocation and Penalty Application Schemes based on Pollutant Reduction Plan Types for Solving Excessive Problem of Allocation (오염할당부하량의 초과현황 및 초과해소를 위한 삭감계획 유형에 따른 페널티 적용방안)

  • Park, Jae Hong;Park, Bae Kyoung;Oh, Seung Young;Hwang, Ha Sun;Lee, Jae Kwan
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.1
    • /
    • pp.66-73
    • /
    • 2013
  • Total Maximum Daily Loads (TMDLs) system was introduced to manage pollution load of watershed and to improve water quality of unit watershed so that it is possible to protect dringking water soureces. Load allocation observation is the most important factor in TMDLs system. Because if load allocation is not observed, it is difficult to achieve water quality goal of unit watershed. Also it is impossible to improve water quality of the drinking water sources. Therefore it is necessary to apply some kind of sanctions (penalty) in case of excess of load allocation. The sanctions have to be, however, applied differently based on various reduction plan types, i.e., using the reduction load planed in 2nd phase, delay the completion, additional reduction in 2nd phase, error of the pollution sources, etc. Moreover, the penalty load should be properly imposed, lest it should be overburden the provence. The reduction load trade inter province must be restrictively permmitted only the same unit watershed.

Acquisition of Watershed-based Pollution Source Information using Spatial Distributed Geo-Information (분포형 공간정보를 이용한 유역단위 오염원정보 구축)

  • Bae, Myoung-Soon;Ha, Sung-Ryong
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.9 no.4
    • /
    • pp.215-223
    • /
    • 2006
  • The Total Maximum Daily Load(TMDL) Act just implemented as a new tool of watershed based water quality management, in Korea. Thus, there are a number of pending questions to resolve for successful settlement of the TMDL. The allocation of pollution source is a exceedingly sensitive issue on local development planning. The simple area-based allocation (SAA) is conventional method to allocate the administrational pollution information to watershed based information. The SAA has a limitation that it can't consider the characteristics of spatial distribution of pollution source and it has caused more uncertainty of TMDL. This study was performed to reduce the uncertainty of watershed-based pollution information using the spatial distribution-based allocation(SDA). In the specific area where pollution source is concentrated such as urbanized region, it has been certified that SDA could reduce a tolerance of pollution information dramatically. As a result of study, SDA is expected a effective tool for TMDL and to solve the conflict between development and protection.

  • PDF