• Title/Summary/Keyword: Waterproofing layer

Search Result 93, Processing Time 0.017 seconds

Performance Evaluation of Stress Absorbing Membrane Interlayer Using Epoxy Asphalt Binder (에폭시 아스팔트 바인더를 이용한 응력흡수층의 성능평가)

  • Jo, Shin Haeng;Lee, Bong Lim;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.6
    • /
    • pp.1043-1051
    • /
    • 2017
  • Asphalt overlay on deteriorated concrete pavement has a problem of early damage due to reflective cracking. There is a need for a new method capable of reducing reflection cracking and ensuring the durability of pavement. The purpose of this study was to obtain durability of asphalt overlay with stress absorbing membrane interlayer (SAMI) using epoxy asphalt binder. The tensile performance, durability, water resistance and bonding performance of Epoxy-SAMI were evaluated by various tests. As a result of tests, Epoxy-SAMI meets the quality standard of the bridge waterproofing material. The repeated direct tensile test was carried out to investigate the effect of reflective cracking reduction. When the Epoxy-SAMI was applied, it had 1.2~1.56 times higher reflective cracking resistance than PSMA asphalt concrete with the thickness of 10cm even if the section thickness decreased. 4-point bending beam test results showed the number of fatigue failures increased 7.5 times when Epoxy-SAMI was applied. The Epoxy-SAMI was found to be effective in improving the durability of the asphalt pavement overlay because it serves to prevent reflective cracking, increase lifespan, and function as a waterproof layer.

Material Properties Evaluation of Cement Mortar Mixed with Organic/Inorganic Combined Water-repellent (유/무기 복합 발수제를 혼입한 모르타르의 재료특성 평가)

  • Kim, Wan-Su;Yoon, Chang-Bok;Cho, In-Sung;Lee, Han-Seung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.6
    • /
    • pp.50-58
    • /
    • 2020
  • When the concrete surface layer is damaged, The method of impregnating the concrete surface with a water repellent cannot secure the expected durability. Recently, various waterproofing and water-repellent materials were mixed into concrete or mortar to secure water repellency even inside cracks, but compressive strength was greatly reduced. In order to overcome the decrease in compressive strength, there has not yet been a study using the merits of organic and inorganic materials at the same time, so in this study, the physical properties and water repellency performance were evaluated by mixing an organic/inorganic composite water repellent appropriately mixed with an organic and inorganic material into the mortar. When mixed with organic/inorganic water repellent, the flow and air content were reduced by about 10% and 50% compared to the Liquid specimen. In the case of the P6L1 specimen, it was confirmed that the compressive strength decreased by about 3.5% compared to the non-mixed mortar at 39.5 MPa, the same as the existing water repellent, Powder. Water-repellent performance The organic-inorganic composite water repellent mixture specimen confirmed higher water repellency than the existing water repellent mixture powder, and the chloride penetration resistance evaluation result showed that the organic-inorganic composite water repellent mixture specimen reduced the passing charge by about 45% compared to the non-mixed mortar. In summary, it is judged that the P5L1 organic/inorganic composite water repellent mixed with a powder water repellent and a liquid water repellent in a ratio of 5:1 is the most reasonable to prevent the decrease in compressive strength and secure water repellency.

무령왕릉보존에 있어서의 지질공학적 고찰

  • 서만철;최석원;구민호
    • Proceedings of the KSEEG Conference
    • /
    • 2001.05b
    • /
    • pp.42-63
    • /
    • 2001
  • The detail survey on the Songsanri tomb site including the Muryong royal tomb was carried out during the period from May 1 , 1996 to April 30, 1997. A quantitative analysis was tried to find changes of tomb itself since the excavation. Main subjects of the survey are to find out the cause of infiltration of rain water and groundwater into the tomb and the tomb site, monitoring of the movement of tomb structure and safety, removal method of the algae inside the tomb, and air controlling system to solve high humidity condition and dew inside the tomb. For these purposes, detail survery inside and outside the tombs using a electronic distance meter and small airplane, monitoring of temperature and humidity, geophysical exploration including electrical resistivity, geomagnetic, gravity and georadar methods, drilling, measurement of physical and chemical properties of drill core and measurement of groundwater permeability were conducted. We found that the center of the subsurface tomb and the center of soil mound on ground are different 4.5 meter and 5 meter for the 5th tomb and 7th tomb, respectively. The fact has caused unequal stress on the tomb structure. In the 7th tomb (the Muryong royal tomb), 435 bricks were broken out of 6025 bricks in 1972, but 1072 bricks are broken in 1996. The break rate has been increased about 250% for just 24 years. The break rate increased about 290% in the 6th tomb. The situation in 1996 is the result for just 24 years while the situation in 1972 was the result for about 1450 years. Status of breaking of bircks represents that a severe problem is undergoing. The eastern wall of the Muryong royal tomb is moving toward inside the tomb with the rate of 2.95 mm/myr in rainy season and 1.52 mm/myr in dry season. The frontal wall shows biggest movement in the 7th tomb having a rate of 2.05 mm/myr toward the passage way. The 6th tomb shows biggest movement among the three tombs having the rate of 7.44mm/myr and 3.61mm/myr toward east for the high break rate of bricks in the 6th tomb. Georadar section of the shallow soil layer represents several faults in the top soil layer of the 5th tomb and 7th tomb. Raninwater flew through faults tnto the tomb and nearby ground and high water content in nearby ground resulted in low resistance and high humidity inside tombs. High humidity inside tomb made a good condition for algae living with high temperature and moderate light source. The 6th tomb is most severe situation and the 7th tomb is the second in terms of algae living. Artificial change of the tomb environment since the excavation, infiltration of rain water and groundwater into the tombsite and bad drainage system had resulted in dangerous status for the tomb structure. Main cause for many problems including breaking of bricks, movement of tomb walls and algae living is infiltration of rainwater and groundwater into the tomb site. Therefore, protection of the tomb site from high water content should be carried out at first. Waterproofing method includes a cover system over the tomvsith using geotextile, clay layer and geomembrane and a deep trench which is 2 meter down to the base of the 5th tomb at the north of the tomv site. Decrease and balancing of soil weight above the tomb are also needed for the sfety of tomb structures. For the algae living inside tombs, we recommend to spray K101 which developed in this study on the surface of wall and then, exposure to ultraviolet light sources for 24 hours. Air controlling system should be changed to a constant temperature and humidity system for the 6th tomb and the 7th tomb. It seems to much better to place the system at frontal room and to ciculate cold air inside tombs to solve dew problem. Above mentioned preservation methods are suggested to give least changes to tomb site and to solve the most fundmental problems. Repairing should be planned in order and some special cares are needed for the safety of tombs in reparing work. Finally, a monitoring system measuring tilting of tomb walls, water content, groundwater level, temperature and humidity is required to monitor and to evaluate the repairing work.

  • PDF