• Title/Summary/Keyword: Water turbine

Search Result 543, Processing Time 0.028 seconds

Waste Heat Utilization of Melted slags at Pyrolysis, Gasification and Melting System (열분해 가스화 용융시스템에서 용융슬래그의 폐열 활용)

  • Lee, Ho-Seok;Sung, Sang-Chul;Oh, Myung-Do
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.1237-1242
    • /
    • 2008
  • A study on waste heat utilization of melted slags at pyorlysis, gasification and melting system was performed. Researchers studied heat balance of substances that flow and flow out to the system which is consisted of melting furnace, combustion chamber, and waste heat boiler, then they calculated melting slags' quantity of heat by the first law of thermodynamics. If they use water cursh pit outflow which is gotten by quenching of melting slag as a energy for heating and cooling system, steam of waste heat boiler would be delivered to a steam turbine, making energy, then they will get 67,671,000 won of profit a year. It will take 3 years to repossess the cost that they invested for building it. And, if we predict durability of trash burner is 20 years, we will get approximately 1,150,407,000 won of profits in 17 years without the period when we repossess the building costs.

  • PDF

The Analysis on Exergy Loss and its Reduction Methods in Steam Desuperheating and Depressurizing Process (증기의 감온·감압과정에서의 엑서지 손실 및 저감방안 분석)

  • Yi, Joong Yong;Lee, Chan
    • The KSFM Journal of Fluid Machinery
    • /
    • v.18 no.6
    • /
    • pp.19-26
    • /
    • 2015
  • The present paper presented and applied an exergy analysis method to evaluate the magnitudes and the locations of exergy losses in the conventional desuperheating and depressurizing process of high pressure and temperature steam delivery system. In addition, for the reduction of exergy losses occurred in conventional process, the present study proposed new alternative processes in which the pressure reducing valve and the desuperheater of conventional process are substituted with steam turbine and heat exchanger, and their effects on exergy loss reduction and exergy efficiency improvement are theoretically investigated and compared. From the present analysis results, the total exergy loss caused in conventional desuperheating and depressurizing process accounted for 66.5% of exergy input and 85% of the total exergy loss was due to the mixing between steam and cold water(e.g desuperheating). However, it was shown from the present analysis results that the present alternative processes can additionally reduce exergy loss by maximum 92.7% of the total exergy loss in conventional process, and can also produce additional and useful energy, the electricity of 220.6 kWh and the heat of 54.3 MJ/hr.

Analysis of Flow through High Pressure Bypass Valve in Power Plant (발전소용 고압 바이패스 밸브 내부 유동해석)

  • Cho, An-Tae;Kim, Kwang-Yong
    • The KSFM Journal of Fluid Machinery
    • /
    • v.10 no.6
    • /
    • pp.17-23
    • /
    • 2007
  • In the present work, flow analysis has been performed in the steam turbine bypass control valve (single-path type) for two different cases i.e., case with steam only and case with both steam and water. The numerical analysis is performed by solving three-dimensional Reynolds-averaged Navier-Stokes (RANS) equations. The shear stress transport (SST) model and $k-{\varepsilon}$ model are used to each different case as turbulence closure. Symmetry condition is applied at the mid plane of the valve while adiabatic condition is used at the outer wall of the cage. Grid independency test is performed to find the optimal number of grid points. The pressure and temperature distributions on the outer wall of the cage are analyzed. The mass flow rate at maximum plug opening condition is compared with the designed mass flow rate. The numerical analysis of multiphase mixing flow(liquid and vapor) is also performed to inspect liquid-vapor volume fraction of bypass valve. The result of volume fraction is useful to estimate both the safety and confidence of valve design.

Spray Characteristics of the Simplex Atomizer with Working Fluids (작동 유체에 따른 단순 압력식 연료노즐의 분무특성)

  • Choi, Chea-Hong;Lim, Byeong-Jun;Choi, Seong-Man
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.13 no.6
    • /
    • pp.41-47
    • /
    • 2009
  • This paper presents the spray characteristics of the simplex fuel nozzle with different working fluids for the gas turbine engine. Spray characteristics can be changed with viscosity, surface tension and density. In this research, water and test fluid type 2 which has similar characteristics of the kerosene are used as a working fluid. Spray visualization was performed by using ND-Yag laser and droplet size was measured by using PDPA(Phase doppler particle analyzer) system. The test results show that spray shapes and SMD distributions of two working fluids are similar at main spray region.

Operational Strategy for a BESS-based Microgrid (BESS 기반 마이크로그리드 운영전략)

  • Lee, Ha-Lim;Chun, Yeong-Han
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.12
    • /
    • pp.1666-1672
    • /
    • 2015
  • Small islands are quite adequate places where microgrid system with renewable sources can replace diesel engines as operation costs of diesel engine in most small islands are very high. To get the large amount of renewable energy, the microgrid system has very large capacity of renewable sources. The system with large capacity of renewable sources can meet the case when supplied energy is greater than the load and the fluctuation of source output is very large. The battery energy storage system can be a solution to stabilize the system with large capacity of renewable sources. In this case, BESS can be utilized as a master source for the synchronous operation of all sources including diesel engine, wind turbine and PV. The diesel generators can be used as a backup in case the BESS SOC goes below a certain level. In this paper, we suggest a novel unit commitment of diesel generators and operation schedule of pump for water supply service with the information of wind forecast, PV forecast, and load forecast. The proposed methods has been implemented and tested at the test bed in Gasa-Island.

Loss of a Main Feedwater Pump Test Simulation Using KISPAC Computer Code

  • Jeong, Won-Sang;Sohn, Suk-Whun;Seo, Ho-Taek;Seo, Jong-Tae
    • Nuclear Engineering and Technology
    • /
    • v.28 no.3
    • /
    • pp.265-273
    • /
    • 1996
  • Among those tests performed during the Yonggwang Nuclear Power Plant Units 3 and 4 (YGN 3&4) Power Ascension Test period, the Loss of a Main Feedwater Pump test at l00% power is one of the major test which characterize the capability of YGN 3&4. In this event, one of the two normally operating main feedwater pumps is tripped resulting in a 50% reduction in the feedwater flow. Unless the NSSS and Turbine/Generator control systems actuate properly, the reactor will be tripped on low SG water level or high pressurizer pressure. The test performed at Unit 3 was successful by meeting all acceptance criteria, and the plant was stabilized at a reduced power level without reactor trip. The measured test data for the major plant parameters are compared with the predictions made by the KISPAC computer code, an updated best-estimate plant performance analysis code, to verify and validate its applicability. The comparison results showed good agreement in the magnitude as well as the trends of the major plant parameters. Therefore, the KISPAC code can be utilized for the best-estimate nuclear power plant design and simulation tool after a further verification using other plant test data.

  • PDF

Corrosive Characterisics of 12Cr Alloy Steel and Fatigue Characteristics of the Artificially Degraded 12Cr Alloy Steel (12Cr 합금강의 부식특성 및 인공열화된 12Cr합금강의 피로특성)

  • Jo, Sun-Young;Kim, Chul-Han;Bae, Dong-Ho
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.25 no.6
    • /
    • pp.965-971
    • /
    • 2001
  • To estimate the reliability of 12Cr alloy steel, the material of turbine blade in the steam power plant, Its corrosion susceptibility and fatigue characteristics in NaCl and Na$_2$SO$_4$solution with the difference of concentration and temperature was investigated. The polarization tests recommended in ASTM G5 standard for corrosion susceptibility in the various corrosive solutions was estimated. It showed that the higher temperature, the faster corrosion rates and corrosion rates were the fastest in 3.5 wt.% NaCl and 1M Na$_2$SO$_4$solution. From these results, the degradation conditions were determined in distilled water, 3.5 wt.% NaCl and 1M Na$_2$SO$_4$solution at room temperature, 60$\^{C}$ and 90$\^{C}$ during 3, 6 and 9 months. Its surface had a few pits for long duration. But, it was not susceptible in sulfide and chloride condition of several temperatures. If the degraded 12Cr alloy steel and non-degraded one were compared with fatigue characteristics, Any differences were not found regardless of temperature and degradation period.

Experimental Study on Combined Ocean Thermal Energy Conversion with Waste Heat of Power Plant

  • Jung, Hoon;Jo, Jongyoung;Chang, Junsung;Lee, Sanghyup
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.3
    • /
    • pp.215-222
    • /
    • 2019
  • This work is experimental study of 10 kW specialized Combined Ocean Thermal Energy Conversion. We propose a C-OTEC technology that directly uses exhaust thermal energy from power station condensers to heat the working fluid (R134a), and tests the feasibility of such power station by designing, manufacturing, installing, and operating a 10 kW-pilot facility. Power generation status was monitored by using exhaust thermal energy from an existing power plant located on the east coast of the Korean peninsula, heat exchange with 300 kW of heat capacity, and a turbine, which can exceed enthalpy efficiency of 45%. Output of 8.5 kW at efficiency of 3.5% was monitored when the condenser temperature and seawater temperature are $29^{\circ}C$ and $7.5^{\circ}C$, respectively. The evaluation of the impact of large-capacity C-OTEC technology on power station confirmed the increased value of the technology on existing power generating equipment by improving output value and reducing hot waste water. Through the research result, the technical possibility of C-OTEC has been confirmed, and it is being conducted at 200 kW-class to gain economic feasibility. Based on the results, authors present an empirical study result on the 200 kW C-OTEC design and review the impact on power plant.

The Study on the Effects of Breakwater Energy Conversion System by Horizontal Plate Installation (수평판 설치에 따른 방파제형 파력 발전 시스템의 영향에 대한 연구)

  • Jung, Sung-Young;Oh, Jin-Seok
    • Journal of Navigation and Port Research
    • /
    • v.38 no.1
    • /
    • pp.39-44
    • /
    • 2014
  • Due to the oil price is increasing continuously, active researches on sources of renewable energy has been invigorated. Above all, ocean energy has high-usability because of ocean current has high density and large quantity compared to the wind energy. In this paper, efficiency enhancement of the wave power generation was described through horizontal plate installation at the break water wave power generation system that converts the ocean energy into electricity. The power-conversion efficiency can be improved by horizontal plate installation at existing system, but there has been insufficient studies domestically. The purpose of this paper is to analyze about the effects of the horizontal plate installation on the breakwater wave power generation system by wave basin experiment and to propose a position of horizontal plate installation.

The Feasibility Analysis for PungDo Tidal Current Power Generation using SeaGen 1.2MW(600kW×2) Turbine (SeaGen 1.2MW(600kW×2)급 터빈을 이용한 풍도조류발전 타당성 분석)

  • Park, Tae-Young;Kim, Han-Sung;Kim, Yun-Wan;Park, Joo-Il;Kim, Kyung-Su
    • Journal of Energy Engineering
    • /
    • v.22 no.4
    • /
    • pp.386-393
    • /
    • 2013
  • An feasibility analysis is performed for the tidal current power generation with the examination of the sea water speed distribution at Pungdo. In this analysis, the water speed distribution which is the key issue was obtained from the actual speed distribution data and results in "the annual current tidal power". Due to the lack of cost information, we applied EPRI data from the internet site instead of the actual information. The result could be used as a base data for the construction of current tidal power plant in the near future. And it is expected to provides good data for the Energy policy.