Water supply reliability for a dam is defined with a concept of probabilistic reliability. An evaluation procedure of the water supply reliability is shown with an analysis of long term firm yield reliability. The water supply reliabilities of Soyanggang Dam and Chungju Dam were evaluated. To evaluate the water supply reliability, forty one sets of monthly runoff series were generated by SAMS-2000. HEC-5 model was applied to the reservoir simulation to compute the firm yield from a monthly data of time series. The water supply reliability of the firm yield from the design runoff data of Soyanggang Dam is evaluated by 80.5 % for a planning period of 50 years. The water supply reliability of the firm yield from the historic runoff after the dam construction is evaluated by 53.7 %. The firm yield from the design runoff is 1.491 billion $m^3$/yr and the firm yield from the historic runoff is 1.585 billion $m^3$/yr. If the target draft Is 1.585 billion $m^3$/yr, additional water of 0.094 billion $m^3$ could be supplied every year with its risk. From the similar procedures, the firm yield from the design runoff of Chungju Dam is evaluated 3.377 billion $m^3$/yr and the firm yield from the historic runoff is 2.960 billion $m^3$/yr. If the target draft is 3.377 billion $m^3$/yr, water supply insufficiency occurs for all the sets of time series generated. It may result from overestimation of the spring runoff used for design. The procedure shown can be a more objective method to evaluate water supply reliability of a dam.
Identifying the available water resources amount is an essential process in establishing a sustainable water resources management plan. Dam facility is a major infrastructure storing and supplying water during the dry season, and the water supply yield of the dam varies depending on dam inflow conditions or operation rule. In South Korea, water supply yield of dam is calculated by reservoir simulation based on observed historical dam inflow data. However, the water supply capacity of a dam can be underestimated or overestimated depending on the existence of historical drought events during the simulation period. In this study, probabilistic inflow data was generated and used to estimate the appropriate range of the water supply yield of hydropower dams. That is, a method for estimating the probabilistic dam inflow that fluctuates according to climatic and socio-economic conditions and the range of water supply yield for hydropower dams was presented, and applied to hydropower dams located in the Han river in South Korea. It is expected that the understanding water supply yield of the hydropower dams will become more important to respond to climate change in the future, and this study will contribute to national water resources management planning by providing potential range of water supply yield of hydropower dams.
Kim, Hyeong-Su;Park, Seung-Gi;Jeong, Chan;Baek, Geon-Ha;Won, I-Jeong;Shin, Heung-Seop
Proceedings of the Korean Society of Soil and Groundwater Environment Conference
/
2002.04a
/
pp.93-97
/
2002
This research introduces some preliminary results of bank filtering intake method adopted in Dalseo area, Nakdong River. This intake method has been planned to supply water resources of 41,000 ㎥/day to Goryeong-Gun and Seongju-Gun in 2016. It is believed that the bank filtering intake method can afford to supply 41,000 ㎥/day amount of water resources and that the raw water quality using the method has more advantages in water treatment than direct surface water intake. Even though the safety yield about individual vertical well is roughly estimated to about 2,000 ㎥/day, it is desirable to decrease the safety yield to about 1,000 ㎥/day in the consideration of long term and simultaneous well pumpings and other unknown factors. Ongoing study will give basic data and new techniques to solve the problems appearing in application of bank filtering method as well.
For a basin with existing reservoirs, the necessity of additional water demands has been proposed, as well as a reevaluation of existing reservoir yield has been proposed. The objective of this study is to reevaluate a multipurpose reservoir yield and to assess the possibility of additional water supply according to increase of downstream water demands. Andong and Imha Reservoirs are selected for reevaluation. The standard reservoir operation rule model and the HEC-ResSim model were used for reservoir simulation for 30 years (1979~2008). In this study, water supply reliability was set up as 96.7% and 95.0% with yearly and monthly evaluating unit. In case of 95% water supply reliability with yearly evaluating unit, water supply capability of Andong reservoir was evaluated as 893MCM and water supply capability of Imha reservoir was evaluated as 382MCM, and that results showed that water yields for both reservoirs are less than the original designed yields.
Magazine of the Korean Society of Agricultural Engineers
/
v.8
no.2
/
pp.1193-1199
/
1966
More stable and higher yields in rice paddy depend mainly upon an adequately balanced supply of water for higher yield. Rice paddy is supplied naturally by rainfall but inevitably requires artificial supplenental irrigation for higher yields. Even though it may be true that the water requirement of rice plants is generally higher than those of other crops, the submerged condition is not necessarily required for rice. The moisture requirements of rice vary according to its growing stages and it is possible to increse the irrigation efficiency by means of lessening the loss due to percolation and evapolation in the field. This experiment was conducted on the effect of the various amount of water supply and different irrigation periods for yield and yield components, and was carried out to find out the most suitable irrigation method and to increase the irrigation efficiency for higher yields in rice paddy. Randomized block design with 3 replications was employed where the 3 levels of the amount of irrigation water; (120% moisture contents), unirrigated (90~100%) and more un irrigated candition (80~90% moisture content), and levels of the various irrigation periods; usual, initial, intermediate and final periods, being treated. The results obtained in this experiment are as follows: 1. As for the physical and chemical and soil properfies, and other characteristics, there are no differences among the treatments enough to be effective for the growth of rice plants. 2. Culm length was measured after harvest as shown in table 2. 3. Difference of the amount of irrigation water did not change the culm length and ear length, however it also indicated more apparent increase in final treatment plots thatn that of usual. 3. No difference in the number of ears and number of ears pers per hill was founded treatments both in the difference of water supply and in the various irrigation periods. 4. There is no difference in the maturing rate and 1000 grains weight. 5. The number of panicles and grains and more increased in 80~100% moisture contents soil than those of 120%. and it shows in un irrigated plots, more irrigated plots and control plots in turn. Other wise according to the period\ulcorner of irrigation the trend is appeared in turn initial, usual, final and intermediate treatments.6. Yield as shown in table 7. 8 was more increased in unirrigated plots(90~IOO% moisture content) than the control plots (120% moisture content) by up to 8.2% and also 3. 2% in more unirrigated plots than that of control by periods is shown: usual plots final, initial, inter mediate treatment plots in turn. 7. The above resutts lead to the conclusion that no remarkable, differences in yields and soil properties are made by the unirrigation. However, it is apparent that this treatment has .some advantages in the points that one could spare the amount of water supply for irrigation with more increase in yield. In addition, a higher temperature and a brisk oxygen supply would be possible throug h this treatments. Accordingly, these treatment would be a more reasonable and economical cultivation method of rice for the better harvest.
KSCE Journal of Civil and Environmental Engineering Research
/
v.40
no.5
/
pp.477-484
/
2020
Reservoir operation affects the sustainability of a water supply. However, the increase in the temporal and spatial variability of rainfall, attributed to climate change, has led to severe droughts and increased difficulty in maintaining a sustainable discharge at certain locations in a reservoir system operation. In this study, water yield was evaluated using reservoir simulation with varied water supply. Three reservoir system models were simulated for nine reservoirs in the Han River basin. The time-based reliability, volumetric reliability, and resiliency were used to evaluate the results. Each case was simulated by applying firm supply, deficit supply, and deficit supply with historical power release of the Hwacheon Reservoir. As a result of the simulation, all indexes were increased when the deficit supply was applied. In particular, the time-based reliability increased by more than 30%, and the supply reliability increased by about 4%. The result showed that the water supply of the entire water system could be increased when all reservoirs in the water system were operated to supply water and maintain sustainable discharge at the same downstream point. The deficit supply was an efficient reservoir operation method for responding to climate change, especially increased rainfall variability.
Recently, uncertainty in predicting available water resources is gradually increasing due to climate change and extreme weather conditions. Social interest in water management such as flood and drought prevention is also increasing, and after the unification of water management implemented in 2018, domestic water management is facing a major turning point. As part of such strengthening of water management capabilities, various studies are being conducted to utilize a hydropower dam for flood control and water supply purposes, which was mainly operated for hydroelectric power generation. However, since the dam evaluation methods developed based on a multi-purpose dam are being applied to hydropower dams, an additional evaluation approach that can consider the characteristics of hydropower dams is required. In this study, a new water supply capacity evaluation method is presented in consideration of the operational characteristics of hydropower dams in terms of water supply, and a connected reservoir simulation method is proposed to evaluate the comprehensive water supply capacity of a dam group operating in a river basin. The presented method was applied to the hydropower dams located in the Bukhan River basin, and the results of the water supply yield of individual dams and multi-reservoir systems were compared and analyzed. In the future, the role of hydropower dams for water supply during drought is expected to become more important, and this study can be used for sustainable domestic water management research using hydropower dams.
Recently, the extreme drought is often occurred due to the global warming and the serious weather changes. Also, the problems of the water pollution In the developed areas, the oppositions from people in the upper stream area and water concession from the local governments affect the national request to get more clean water resources in upper stream of the undeveloped areas. It also brings on the necessity of recognition for water supply managements. Therefore, as the water demand is rapidly changes in the metropolitan areas, the capability of water supply from the north Han river basin dams should be appropriately investigated. In this study, we developed a simulation system using STELLA (equation omitted) software environment, a shared vision model, to analyze the possibility of the stable water supply from north Han river basin dams. Also, three different rules are applied on this model by dividing the water level to minimum(Rule 1), medium(Rule 2) and maximum(Rule 3). Using the rules, the safety yield changes are analyzed for dam rule curve of the reservoir and hydropower release.
This paper presents the evaluation of the impact of climate change on water resources and yield capacity of Asa and Kampe reservoirs. Trend analysis of mean temperature, runoff, rainfall and evapotranspiration was carried out using Mann Kendall and Sen's slope, while runoff was modeled as a function of temperature, rainfall and evapotranspiration using Artificial Neural Networks (ANN). Rainfall and runoff exhibited positive trends at the two dam sites and their upstream while forecasted ten-year runoff displayed increasing positive trend which indicates high reservoir inflow. The reservoir yield capacity estimated with the ANN forecasted runoff was higher by about 38% and 17% compared to that obtained with historical runoff at Asa and Kampe respectively. This is an indication that there is tendency for water resources of the reservoir to increase and thus more water will be available for water supply and irrigation to ensure food security.
Bastola, Shiksha;Seong, Yeon Jeong;Lee, Sang Hyup;Jung, Younghun
Journal of Korea Water Resources Association
/
v.52
no.9
/
pp.637-645
/
2019
Among various ecosystem services provided by the basin, this study deals with water yield (WY) estimation in the Bagmati basin of Nepal. Maps of where water used for different facilities like water supply, irrigation, hydropower etc. are generated helps planning and management of facilities. These maps also help to avoid unintended impacts on provision and production of services. Several studies have focused on the provision of ecosystem services (ES) on the basin. Most of the studies have are primarily focused on carbon storage and drinking water supply. Meanwhile, none of the studies has specifically highlighted water yield distribution on sub-basin scale and as per land use types in the Bagmati basin of Nepal. Thus, this study was originated with an aim to compute the total WY of the basin along with computation on a sub-basin scale and to study the WY capacity of different landuse types of the basin. For the study, InVEST water yield model, a popular model for ecosystem service assessment based on Budyko hydrological method is used along with ArcGIS. The result shows water yield per hectare is highest on sub-basin 5 ($15216.32m^3/ha$) and lowest on sub-basin 6 ($10847.15m^3/ha$). Likewise, built-up landuse has highest WY capacity followed by grassland and agricultural area. The sub-basin wise and LULC specific WY estimations are expected to provide scenarios for development of interrelated services on local scales. Also, these estimations are expected to promote sustainable land use policies and interrelated water management services.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.