• Title/Summary/Keyword: Water supply plan

Search Result 220, Processing Time 0.027 seconds

The Plan of Safety for Pump Station through Hydraulic Transient Analysis & Demonstration (과도수리현상 해석과 실증을 통한 펌프장 안정성 확보방안)

  • Ra, Beyong-pil;Kim, Jin-man;Park, Jong-ho;Kim, Kyung-yup
    • 유체기계공업학회:학술대회논문집
    • /
    • 2004.12a
    • /
    • pp.199-207
    • /
    • 2004
  • Water supply facilities are recently getting larger according as domestic waterworks become multi regional water supply system. Large water supply facilities generally consist of the intake pumping station, water treatment station and water supply & distribution facilities. Although pumping stations and pipeline systems are used to pump up water, it often happens pipeline damage and flooding accident by the water hammer. As a result of this study, a pumping station is guaranteed by the computer simulation and field test analysis. Therefore these are contributed safety operation in pumping station through adjustment of the pumping station safety plan, air valve and valve closing time.

  • PDF

Development of Water Supply System under Uncertainty

  • Chung, Gun-Hui;Kim, Tae-Woong;Kim, Joong-Hoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.2179-2183
    • /
    • 2009
  • As urbanization is progressed, the network for distributing water in a basin become complex due to the spatial expansion and parameter uncertainties of water supply systems. When a long range water supply plan is determined, the total construction and operation cost has to be evaluated with the system components and parameter uncertainties as many as possible. In this paper, the robust optimization approach of Bertsimas and Sim is applied in a hypothetical system to find a solution which remains feasible under the possible parameter uncertainties having the correlation effect between the uncertain coefficients. The system components to supply, treatment, and transport water are included in the developed water supply system and construction and expansion of the system is allowed for a long-range period. In this approach, the tradeoff between system robustness and total cost of the system is evaluated in terms of the degree of conservatism which can be converted to the probability of constraint violation. As a result, the degree of conservatism increases, the total cost is increased due to the installation of large capacity of treatment and transportation systems. The applied robust optimization technique can be used to determine a long-range water supply plan with the consideration of system failure.

  • PDF

An Irrigation Reliability Assessment of Agricultural Reservoir to Establish Response Plan of Future Climate Change Adaptation (기후변화 대응방안 수립을 위한 농업용 저수지 이수안전도 평가)

  • Kwon, Hyung-Joong;Nam, Won-Ho;Choi, Gyeong-Suk
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.62 no.2
    • /
    • pp.111-120
    • /
    • 2020
  • This study assessed the reliability of the agricultural water supply based on future climate change scenarios, and suggested plans to improve the reliability in order to promote the adaptability of irrigation water in agricultural reservoirs to climate change. The assessment of agricultural water supply reliability was performed on reservoirs which had a lower water quantity than their design basis and which had recently been subject to drought. In other words, from the irrigation districts of main intake works among the reservoirs managed by the Korea Rural Community Corporation, 1~2 districts in each province-that is, a total of 13 districts -that were recently designated as a district for securing agricultural water (drought prevention district) were selected. Climate change scenarios were applied to the selected districts to analyze their future water supply reliability compared to the current level. All districts selected showed a drought frequency of 4 years or shorter, which demonstrated the need to establish climate change response plans. As plans for responding to climate change, a plan that utilizes supplemental intake works to reduce the area of the irrigation districts of main intake works, and another one that increases the capacity of main intake works were adopted to reanalyze their water supply reliability. When the area of the irrigation districts of main intake works was reduced by about 30~40%, the drought frequency dropped to more than 10 years, securing the reliability of water supply. To secure the reliability by increasing the capacity of main intake works, it was calculated that about 19,000~2,400,000 tons need to be added to each reservoir. In addition, climate change response plans were suggested to improve the reliability of the water supply in each district based on the results of economic analysis.

Development of a Concentration Prediction Model for Disinfection By-product according to Introduce the Advanced Water Treatment Process in Water Supply Network (고도정수처리에 따른 상수도 공급과정에서의 소독부산물 농도 예측모델 개발)

  • Seo, Jeewon;Kim, Kibum;Kim, Kibum;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.5
    • /
    • pp.421-430
    • /
    • 2017
  • In this study, a model was developed to predict for Disinfection By-Products (DBPs) generated in water supply networks and consumer premises, before and after the introduction of advanced water purification facilities. Based on two-way ANOVA, which was carried out to statistically verify the water quality difference in the water supply network according to introduce the advanced water treatment process. The water quality before and after advanced water purification was shown to have a statistically significant difference. A multiple regression model was developed to predict the concentration of DBPs in consumer premises before and after the introduction of advanced water purification facilities. The prediction model developed for the concentration of DBPs accurately simulated the actual measurements, as its coefficients of correlation with the actual measurements were all 0.88 or higher. In addition, the prediction for the period not used in the model development to verify the developed model also showed coefficients of correlation with the actual measurements of 0.96 or higher. As the prediction model developed in this study has an advantage in that the variables that compose the model are relatively simple when compared with those of models developed in previous studies, it is considered highly usable for further study and field application. The methodology proposed in this study and the study findings can be used to meet the level of consumer requirement related to DBPs and to analyze and set the service level when establishing a master plan for development of water supply, and a water supply facility asset management plan.

A Study on the Development of Optimal Renewal Planning Model in Water Supply Facilities Connected to Future Financial Plan of Water Providers (수도사업자의 장래 재정계획과 연계한 상수도시설의 최적 개량계획 수립 모델 개발 연구)

  • Lim, Sanghyun;Shin, Hwisu;Seo, Jeewon;Kim, Kibum;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.2
    • /
    • pp.149-159
    • /
    • 2017
  • It is considered necessary to renewal a considerable number of water supply facilities in Korea because they began to be intensively buried in the period of rapid economic growth. Accordingly, local water providers are required to take measures against this situation, but they have currently been caught in a vicious circle of the lack of budget spent in renewing water supply facilities because county-based small-scale local water supply cannot afford to cover annual expenditures with their revenues from water rates. Therefore, this study developed an optimal renewal planning model capable of achieving a balance of financial revenue and expenditure in local water supply using nonlinear programming and furthermore of minimizing the total cost incurred during the analysis. To this end, this study selected the water supply area located in County Y as a research area to build the financial revenue and expenditure and used Solver function provided by Microsoft Excel to use nonlinear programming. As a result, this study developed an optimal renewal planning model minimizing incurred costs in consideration of 6 items in the financial revenue and expenditure. The optimal renewal plan was modeled according to the available annual budget. As a result, this study proposed SICD, a scenario to minimize total costs from the perspective of water suppliers, and SITS, a scenario to minimize the increase in water rates from the perspective of consumers. It can be said that the method proposed in this study is the core of the optimal financial and renewal plans as a final stage of asset management for water supply facilities. Therefore, it is considered possible for local water providers to use the method proposed in this study according to circumstances for the asset management of water supply facilities.

A Study on the Index of Drought and Drought Management Considering Reservoir Storage (저수용량을 고려한 가뭄지수 산정과 가뭄관리에 관한 연구)

  • Cho, Hong Je;Park, Han Ki;Kim, Su Hyun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.12 no.4
    • /
    • pp.97-105
    • /
    • 1998
  • The goal of the present research was to develop a mean to determine indices of drought warning and emergency necessary to manage drought and establish water supply contingency plan for the municipal and industrial water supply system in urban areas. To do this, we worked on the Sayun catchment which is the main water source of Ulsan and used measured hydrologic data (storage, inflow, supply, outflow) from 1980 to 1996. The indices of drought calculated by the method of Phillips drought index based only on monthly precipitation do not pertinently represent drought phenomena in case water supply is from dam or reservoir in an urban area. Therefor, we developed the drought index technique including inflow, storage, outflow and supply which are the chief factors of drought management. The result showed that the method of Phillips drought index considering the capacity of water supply was excellent when applied to practical drought phenomena.

  • PDF

Pressure restricted water supply method during drought using a computer simulation and daily water supply analysis (시뮬레이션과 1일 급수량 분석을 이용한 갈수기 감압에 의한 제한급수 방법)

  • Nam, Youngwook;Kim, Kyungsu;Hyun, Inhwan;Kim, Dooil
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.34 no.5
    • /
    • pp.335-344
    • /
    • 2020
  • Due to global climate change, mega-droughts have occurred frequently. Since long-term droughts make it difficult to secure the water resources, water supply needs to be restricted in a reasonable manner. In the event of limited water supply, the waterworks need to develop a restricted water supply strategy. This study showed that analyzing daily water supply could be used to respond to the first stage of a drought. According to an analysis of Korea's major water authorities, there was about 7~21% of room for daily minimum water supply in case of a drought. Restricting the water supply by lowering pressure is a good strategy for local water authorities with high water leakage rate since leakage is inversely dependent with pressure. For this method, it is necessary to quantify water deficiency and pressure at each node using a simulation. Since DDA-based software is not possible to predict changes in demand at nodes with pressure reduction, WaterGEMS, a PDA software, was used to quantitatively predict water shortages and pressures at each node. Locations where water is deficient need to install booster pumps or to be dispatched with water tank truck and bottled water. Without these support, lowering pressure could not be an option for water works. This paper suggests a method for waterworks to plan a drought by lowering pressure to restrict water supply using daily water supply analysis and PDA based simulation.

Evaluation for conjunctive operation of multi-regional water supply system through risk analysis (위기대응 취약성 분석을 통한 광역상수도 연계운영 평가)

  • Hwang, Jinsoo;Choi, Taeho;Hong, Gonghyun;Lee, Doojin;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.33 no.4
    • /
    • pp.269-279
    • /
    • 2019
  • This study would present a risk analysis method to evaluate stable tap water supply in a multi-regional water supply system and propose a measure for the evaluation of the effect of the conjunctive operation of the multi-regional water supply system using this. Judging from the vulnerability for the crisis response of the entire N. multi-regional water supply system, as compared to the result of Scenario 1 in which no conjunctive pipes were operated, it was found that in Scenario 2, in which conjunctive pipes were partially operated, the vulnerability of crisis response decreased by about 30.6%, and as compared to Scenario 3, the vulnerability of crisis response decreased by 86.2%. In setting a plan for stable tap water supply in N multi-regional water supply system, using the estimated value and the method for the evaluation of the vulnerability of crisis response by pipe, by interval and by line, it is judged that this can be utilized as a basis for the judgment of the evaluation of the operation or the additional installation of conjunctive pipes.

Optimal Conjunctive Use of Surface and Ground Water (지표수와 지하수의 최적 연계운영)

  • Yi, Jae-Eung
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.4 s.129
    • /
    • pp.367-374
    • /
    • 2002
  • Water supply plan by optimal conjunctive use of surface and ground water is studied to prepare expected water deficit in near future. The optimization model for conjunctive use of surface and ground water is developed using discrete differential dynamic programming technique to maximize net benefit by water supply. As a result of applying the model to Namdaechun river located in Yangyang, it is found that water supply reliability using optimal conjunctive use of surface and ground water is much higher than reliability using surface water alone.