• Title/Summary/Keyword: Water supply plan

Search Result 220, Processing Time 0.025 seconds

A Study on Typical Rates of Water-use for Primary School, Middle School and High School Facilities (초.중.고등학교 시설의 급수 사용량에 대한 연구)

  • Kim, Kyu-Saeng
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.12
    • /
    • pp.802-807
    • /
    • 2008
  • A Study on Typical Rates of Water-use for School Facilities has been carried out in this work. Water supply system is given much weight in school facilities. Therefore, it set up a basis efficiency using of water sources to calculate typical rates of water use. The results are summarized as follows; 1) On the whole, typical rates of water-use was founded out 15 L/stu. d in pirmary school, 10 L/stu. d in middle school and 30 L/stu. d in high school smaller than the existing it. It was rate of water-use change as season and Max. Rates of water-use was July. 2) I deem that school hours are 5 hour's in primary school, 7 hour's in middle school and 8 hour's in high school. It the concept of 1 hour that is lesson time 40 minutes and resting time 10 minutes in primary school, lesson time 45 minutes and resting time 10 minutes in middle school and lesson time 50 minutes and resting time 10 minutes in high school. 3) It is desired that we calculate the volume of pump and water tank throughout this concept and the size of water tank should be 1.5 times with taking peak load into consideration by this study on typical rate of water-use. 4) The amount of using water increases in gradually and I consider the life cycle of facilities is more than 10 years. As a result, I can forecast that the size will be insufficiency but I deem that if we devise a plan about parallel pumping on water tank space, we can cope with it. Also, it is expected that we can cut back the transport energy by controlling pump volume.

Economic analysis of irrigation facilities for securing water for field crops

  • Hyung Jin Shin;Jae Young Lee;Jae Nam Lee;Han Na Lee;Sang Hyeon Park;Bum Soo Shin;Sang Sun Cha;Se Myung Kwon;Jung Il Seo;Chan Gi Park
    • Korean Journal of Agricultural Science
    • /
    • v.50 no.4
    • /
    • pp.785-798
    • /
    • 2023
  • Considering irrigation facilities are currently insufficient and drought vulnerability due to climate change is high, efficient measures are required to secure water supply for field crops. This study, therefore, calculated the water shortage to secure water for representative field crops. An economic analysis was further conducted by comparing the production income to the input cost for each method. Here, five distinct regions were selected to represent each crop-Cheongyang-gun for chili peppers, Yesan-gun for apples, Dangjin-si for cabbages, Seosan-si for garlic, and Goesan for beans. The regions with insufficient water supply were estimated by calculating the water requirements and the supplied water from public groundwater wells for each area. A comprehensive set of four scenarios was presented as a strategy to ensure water security and manage irrigation facilities. These scenarios comprised the maintenance of existing groundwater wells, the construction of new water storage tanks, the installation of additional groundwater wells, and the utilization of surface water. B/C (benefit/cost) analysis was conducted for each scenario. As a result, the construction of water storage tanks was selected as a facility and water management plan in Cheongyang-gun, Dangjin-si, and Seosan-si. The analysis additionally indicated the economic viability of installing surface water utilization facilities in Yesan-gun and developing water storage tanks and groundwater (aquifer) wells in Goesan-gun. The results of this study are considered to serve as foundation data that may be utilized in the selection of water management plans for drought-prone areas in the future.

Development of a Long-slope Water Harvesting System in Natural Channel for Drought Mitigation in Upland (밭작물 가뭄피해 경감을 위한 소류천 유출수 저수 시스템 개발)

  • Kim, Youngjin;Choi, Yonghun;Lee, Sangbong;Kim, Minyoung;Jeon, Jonggil
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.62 no.6
    • /
    • pp.111-118
    • /
    • 2020
  • This study developed a rainwater harvesting system for the irrigation of upland on sloping area. The assessment of water supply capacity was evaluated in farm field experience. This system consists of a water catchment device and a collapsible storage tank. The water catchment device was designed to collect runoff water in natural channel of 500 mm width into a pipe of 50 mm inner diameter. The device has funnel-shaped plan and cross-section of square. The storage capacity of the collapsible water tank was caculated to meet the water demand for irrigation in 30 a cultivated land for 10-year frequancy drought. The tank has a cuboid shape with a capacity of 30 ㎥, 5 m in width and length, 1.2 m in height. This system can supply 92% of the water required for drop irrigation of red pepper and 88% of the water required for drop irrigation of onions in 30 a cultivation land during the month of May and June. In the case of 16-dry days of 10-years frequency, this system is capable to irrigate 100% of required water for red pepper and onion, 76.7% of required water for Omija (Schisandra chinensis), and 51.5% of required water for autumn kimchi cabbage.

A Study on Objective Functions for the Multi-purpose Dam Operation Plan in Korea (국내 다목적댐 운영계획에 적합한 목적함수에 관한 연구)

  • Eum, Hyung-Il;Kim, Young-Oh;Yun, Ji-Hyun;Ko, Ick-Hwan
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.9 s.158
    • /
    • pp.737-746
    • /
    • 2005
  • Optimization is a process that searches an optimal solution to obtain maximum or minimum value of an objective function. Many researchers have focused on effective search algorithms for the optimum but few researches were interested in establishing the objective function. This study compares two approaches for the objective function: one allows a tradeoff among the objectives and the other does not allow a tradeoff by assigning weights for the absolute priority between the objectives. An optimization model using sampling stochastic dynamic programming was applied to these two objective functions and the resulting optimal policies were compared. As a result, the objective function with no tradeoff provides a decision making process that matches practical reservoir operations than that with a tradeoff allowed. Therefore, it is more reasonable to establish the objective function with no a tradeoff among the objectives for multi-purpose dam operation plan in Korea.

Site Plan of High-enthalpy Plasma Research Center in Chonbuk National University (전북대학교 고온플라즈마응용연구센터 Site Plan)

  • Kim, Min-Ho;Choi, Seong-Man;Seo, Jun-Ho;Choi, Chea-Hong;Hong, Bong-Guen
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2010.11a
    • /
    • pp.764-767
    • /
    • 2010
  • The high enthalpy plasma research center in Chonbuk national university is under construction for MW class plasma wind tunnel. Four types of plasma equipment will be installed in the research center. The equipments are 1set of 0.4 MW class enhanced Huels type plasma equipment, 1 set of 2.4 MW class enhanced Huels type plasma equipment, 1 set of 60 kW RF plasma equipment and 1 set of 200 kW RF plasma equipment. And electrical, water and gas utilities to assistant plasma equipments are under construction. The research center consists of experiment building, research building, power supply building, air supply building, cooling tower foundation.

  • PDF

Comparative analysis of linear model and deep learning algorithm for water usage prediction (물 사용량 예측을 위한 선형 모형과 딥러닝 알고리즘의 비교 분석)

  • Kim, Jongsung;Kim, DongHyun;Wang, Wonjoon;Lee, Haneul;Lee, Myungjin;Kim, Hung Soo
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.spc1
    • /
    • pp.1083-1093
    • /
    • 2021
  • It is an essential to predict water usage for establishing an optimal supply operation plan and reducing power consumption. However, the water usage by consumer has a non-linear characteristics due to various factors such as user type, usage pattern, and weather condition. Therefore, in order to predict the water consumption, we proposed the methodology linking various techniques that can consider non-linear characteristics of water use and we called it as KWD framework. Say, K-means (K) cluster analysis was performed to classify similar patterns according to usage of each individual consumer; then Wavelet (W) transform was applied to derive main periodic pattern of the usage by removing noise components; also, Deep (D) learning algorithm was used for trying to do learning of non-linear characteristics of water usage. The performance of a proposed framework or model was analyzed by comparing with the ARMA model, which is a linear time series model. As a result, the proposed model showed the correlation of 92% and ARMA model showed about 39%. Therefore, we had known that the performance of the proposed model was better than a linear time series model and KWD framework could be used for other nonlinear time series which has similar pattern with water usage. Therefore, if the KWD framework is used, it will be possible to accurately predict water usage and establish an optimal supply plan every the various event.

Element Technology and Strategy of Digital Twin in the Water Treatment (수처리공정의 디지털 트윈 요소기술과 추진 전략)

  • Young-Man Cho;Yong-Jun Jung
    • Journal of Wetlands Research
    • /
    • v.25 no.4
    • /
    • pp.284-290
    • /
    • 2023
  • Domestic water supply and sewage facilities are rapidly aging and maintenance difficulties such as aging of operation and management personnel are overlapping, so Digital Twin technology is attracting attention as an intelligent means of process management. Digital twin projects for domestic water treatment processes include the smart sewage treatment project promoted by the Ministry of Environment, projects independently promoted by some local governments, and digital twin purification plant projects promoted by K-water. However, the content of digital twin promotion is different for each institution. Therefore, in the water treatment process, technological standardization and step-by-step implementation methods for digital twins must be preceded to reduce trial and error in future business promotion. This study aims to provide an efficient promotion plan by prescribing the digital twin element technology and composition method in the water treatment process and reviewing the contents currently being promoted by the Ministry of Environment, local governments, and K-Water individually.

Estimation on an Amount of the Groundwater Demand and Supply for Applying the Well-network System (WNS) to a Frequent-drought Area (관정연계이용 기술 적용을 위한 상습가뭄지역 지하수 수요-공급량 평가)

  • Lee, Byung Sun;Jeong, Chanduck;Lee, Gyusang;Ha, Kyoochul;Lee, Jong-Hwa;Song, Sung-Ho
    • Journal of Soil and Groundwater Environment
    • /
    • v.27 no.2
    • /
    • pp.24-35
    • /
    • 2022
  • This study was conducted to estimate groundwater demand and supply for agricultural activities in a frequent-drought area that requires implementation of optimal distribution plan utilizing the well-network system (WNS). The WNS has been considered as a viable strategic way of supplying groundwater to farmlands by connecting groundwater wells physically or virtually. The study area heavily relied on groundwater resources for irrigation up to 53% due to a lack of surface water resources. Two kinds of methods, HOMWRS software and FAO approach, were used for estimating irrigation water requirements for paddy and upland fields, respectively. During the latest 10 years (2010~2019), the water requirements was estimated to be 1,106 m3/day. The requirements notably increased to 1,121~4,004 m3/day during active farming season (May to September), which exceeded the total yield capacity of pre-existing groundwater wells (2,356 m3/day) in the area. Detailed and definite determination for groundwater demand and supply helped to determine optimal scale parameters of WNS. The WNS has achieved more balanced distribution of groundwater resources for irrigation over the study area.

A Study on Analysis of Defects cause for Rotor in the High Voltage Induction Motors (고압유도전동기의 회전자 결함요인 분석에 관한 연구)

  • Lee, Eun-Chun;Byun, Doo-gyoon;Chae, Ji-Seog;Byun, Ill-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.655-656
    • /
    • 2015
  • In this paper, diagnosis for 85 high voltage induction motors which have operated for more than 20 years in 18 wide area water supply offices were applied and the results of diagnosis were analysed. Furthermore, main factors that would be affecting rotor defects were selected and correlations between dependent variables which was magnitude for sideband frequency on current during operation and independent variables such as starting characteristic, operating time, number of operation, load factor, maker, rotation speed, capacity were analysed. It was clear that factors including starting characteristic, number of operation, maker, rotation speed caused break by correlation analysis. From this, regression equation was deduced through regression analysis. Based on suggested regression equation, it is applied usefully that we can estimate the condition of rotor without onsite diagnosis and plan the schedule of diagnosis.

  • PDF

The System Improvement of the Individual Sewage Treatment System (개인하수처리시설의 제도개선에 관한 연구)

  • Jang, Hyo-Ju;Lee, Jang-Hown;Kang, Seon-Hong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.1
    • /
    • pp.33-40
    • /
    • 2010
  • Individual sewage treatment system is classified into a sewage treatment system which treats all the domestic sewage and a water-purifier tank which treats only effluent flushing from the toilet. The number of registered manufacturers has increased rapidly since 2001. As a result, price competition has increased among the manufacturers and has caused the problems such as the inappropriate production of individual sewage treatment system, the unreasonable permit for building completion and the shortage of the professional technology of the community's public officials in charge. This study collected the problem cases that are related with existing individual sewage treatment system and operation. Efficient improvement plan for the stable supply, installation, maintenance of individual sewage treatment system were suggested.