• Title/Summary/Keyword: Water supply and demand

Search Result 405, Processing Time 0.031 seconds

A Study on the Analysis of the Water Quantity of the Rainwater Detention System based on the Planning Simulation in the Wonheungs' ecological park (모의실험에 의한 청주S(3)택지개발지구 원흥이생태공원일대 우수저류시설의 빗물저류효과 분석 연구)

  • Kim, Gi-Soo;Lee, Tae-Gu;Hwang, Hee-Yeun
    • KIEAE Journal
    • /
    • v.7 no.2
    • /
    • pp.25-30
    • /
    • 2007
  • The purpose of this research is to analyze the water quantity of the rainwater detention system based on the Planning Simulation in Residential Areas. The contents of this research consists of two main parts. The first part is to calculate the supply water quantity of the rainwater detention system and the demand water quantity of the Wonheungs' ecological park. The second part is to analyze the difference between demand and supply of water quantity, based on the Planning Simulation, in the rainwater detention system. This research will contribute to the establishment of the environment-friendly site planning methods which increase the quality of residential environment in apartment housing.

Network Modeling of Paddy Irrigation System using ArcHydro GIS - ANGO Agricultural Water District - (ArcHydro를 이용한 GIS기반의 관개시스템 네트워크 모델링 - 안고농촌용수구역을 대상으로 -)

  • Park, Geun-Ae;Park, Min-Ji;Jang, Jung-Seok;Kim, Seong-Joon
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.10 no.1
    • /
    • pp.73-83
    • /
    • 2007
  • Network modeling of irrigation system that links irrigation facilities with stream is necessary to establish complicated rural water management system and to manage agricultural water effectively. This study attempted a network modeling for an agricultural water district called "ANGO" located in Anseongcheon watershed by connecting ArcHydro Model developed to control geographical information data in the field of water resources and AWDS(Agricultural Water Demand & Supply Estimation System) developed by KRC (Korea Rural Community & Agriculture Corporation). Network modeling was embodied by build topology between spatial objects of total 70 agricultural irrigation facilities (24 reservoirs, 18 pumping stations, 28 weirs) and stream network using ArcHydro Model. In addition, new menus were added in ArcGIS system for query and visualization of text-based AWDS outputs such as irrigation facilities information, water demand and supply analysis.

  • PDF

A Study on the Performance Evaluation of Recirculation System for Individual Hot Water Supply System in Residential Buildings (주거건물의 개별급탕방식 환탕배관 적용에 따른 급탕성능 평가에 관한 연구)

  • Cha, Min-Chul;Yeo, Myoung-Souk;Seok, Ho-Tae
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.19 no.12
    • /
    • pp.857-864
    • /
    • 2007
  • In the current residential building, hot water supply system consumes the second largest energy in order to make the thermal comport condition of residential space. The more residential environment improves the more the demand for hot water and water consumption is increasing gradually. So this study examines the possibility of applying the recirculation for individual hot water supply system compared with the existing method for waiting time for hot water, wasted water and energy consumption. The results are as follows. (1) In case of recirculation system method the waiting time for hot water can be reduced up to $69\sim85%$ in spring and fall period and so dose up to $77\sim85%$ in winter period. (2) The total wasted water has a little change compared with the existing method which can make the total wasted water reduced about $77\sim86%$. (3) The efficiency of hot water supply system can be improved, if the method which blocks the inflow of cold water is applied, when return pump is operated to recirculate hot water in recirculation system.

Assessment of Irrigation Efficiency and Water Supply Vulnerability Using SWMM (SWMM 모형을 활용한 평야부 관개효율 및 용수공급 취약성 평가)

  • Shin, Ji-Hyeon;Nam, Won-Ho;Bang, Na-Kyoung;Kim, Han-Joong;An, Hyun-Uk;Lee, Kwang-Ya
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.62 no.6
    • /
    • pp.73-83
    • /
    • 2020
  • Agricultural drought is a natural phenomenon that is difficult to observe and quantitatively express, and agricultural water use is high and usage patterns are diverse, so even if there is a lack of rainfall. The frequency and severity of agricultural drought are increased during the irrigation period where the demand for agricultural water is generated, and reasonable and efficient management of agricultural water for stable water supply is required. As one method to solve the water shortage of agricultural water in an unstructured method, it is necessary to analyze the appropriate supply amount and supply method through simulation from the intake works to the canals organization and paddy field. In this study, irrigation efficiency was analyzed for irrigation systems from April to September over the past three years from the Musu Reservoir located in Jincheon-gun, Chungcheongbuk-do and Pungjeon Reservoir located in Seosan-si, Chungcheongnam-do. SWMM (Storm Water Management Model) was used to collect agricultural water, and irrigation efficiency analysis was conducted using adequacy indicators, and water supply vulnerability. The results of the agricultural water distribution simulation, irrigation efficiency and water supply vulnerability assessment are thought to help the overall understanding of the agricultural water supply and the efficient water management through preliminary analysis of the methods of agricultural water supply in case of drought events.

Comparison of Water Supply Reliability by Dam Operation Methods (댐 운영방식에 따른 이수안전도의 비교)

  • Choi, Si Jung;Lee, Dong-Ryul;Moon, Jang Won
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.6
    • /
    • pp.523-536
    • /
    • 2014
  • A water supply reliability is mainly influenced by water demand, reservoir storage, and inflow change caused from drought. The water supply reliability can vary depending on the method of dam operation. In Korea, the deficit-supply method which complements water deficit as water shortage occurs in downstream areas has been used for the national water resources master plan using K-WEAP, but the prime flow method, an alternative approach, would show different results of water supply reliability in comparison to the deficit-supply method. The objective of this research is to compare and analyze differences in water supply reliability according to dam operation methods. These results can be used to re-evaluate water supply reliability of dam in a circumstance considering steady dam release for instreamflow in downstream and hydroelectric power generation.

Analysis of Flow and Economic Benefit Through Water Leakage Detection and Repair (누수탐사에 의한 유량분석 및 보수의 경제적 효과)

  • Lee, Seung-Chul;Lee, Sang-Il
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.19 no.1
    • /
    • pp.8-15
    • /
    • 2005
  • Field measurement data on water leakage are not readily available and it causes inaccurate assessment of water demand and poor supply planning. In this study, the procedure for leakage detection and unaccounted water calculation is proposed and applied to a city. The city has suffered from the significant amount of leak water and the financial loss as a result. Measurements were made for pressure and flow at 18 locations before and after the repair. Repair of the leakage increased pressure up to $2.0kgf/cm^2$ and saved 17.1% of water supply from distribution reservoirs. Monetary value of annual water savings for the entire city amounts to 1 billion won. It is believed that leakage detection and data analysis conducted in this study will contribute to the change of current practice and to the establishment of better water supply management system.

Development of a Hydrologic System for Simulating Daily Water Storage in an Estuary Reservoir

  • Noh, Jae-Kyoung
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.7
    • /
    • pp.1-10
    • /
    • 2003
  • In order to analyze the water supply capacity in an estuary reservoir, a system composed of daily water balance model and daily inflow model was developed. The agricultural water demands to paddy fields, domestic water demands to residential areas, and industrial water demands to industrial complexes were considered in this daily water balance model. Likewise, the outflow volume through sluice gates and inside the water level at the start of the outflow was initially conditioned to simulate estuary reservoir storage. The DAWAST model (Noh, 1991) was selected to simulate daily estuary reservoir inflow, wherein return flows from agricultural, domestic, and industrial water were included to simulate runoff. Using this system, the water supply capacity in the Geum River estuary reservoir was analyzed.

Water Demand and Supply Stability Analysis Using Shared Vision Model (Shared Vision 모형을 이용한 용수수급의 안정성 분석)

  • Jeong, Sang-Man;Lee, Joo-Heon;Ahn, Joong-Kun
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.7
    • /
    • pp.569-579
    • /
    • 2004
  • Recently, the extreme drought is often occurred due to the global warming and the serious weather changes. Also, the problems of the water pollution In the developed areas, the oppositions from people in the upper stream area and water concession from the local governments affect the national request to get more clean water resources in upper stream of the undeveloped areas. It also brings on the necessity of recognition for water supply managements. Therefore, as the water demand is rapidly changes in the metropolitan areas, the capability of water supply from the north Han river basin dams should be appropriately investigated. In this study, we developed a simulation system using STELLA (equation omitted) software environment, a shared vision model, to analyze the possibility of the stable water supply from north Han river basin dams. Also, three different rules are applied on this model by dividing the water level to minimum(Rule 1), medium(Rule 2) and maximum(Rule 3). Using the rules, the safety yield changes are analyzed for dam rule curve of the reservoir and hydropower release.

A Study on the Optimization of Power Transformer in Apartment Housing (아파트의 동력변압기 용량 최적화 연구)

  • 이기홍;성세진
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.15 no.1
    • /
    • pp.78-83
    • /
    • 2001
  • To establish the optimized capacity of power transformer, this paper proposed the total demand factor of power supply facility. For this purpose, it was measured and analysed the operating pattern of power supply acility Installed in the apartment. As a result, it is found that the demand factor of each facility is following that : i) In case of [Xlwer water suwly facility ; 47[%], ii) In case of waste water facility ; 44[%]. Also, it was analysed that the optimized total demand factor of power load is proper 42[%1 than 52[%] to lead the efficiency operation.ration.

  • PDF

Analysis of the Affecting Factors to the Peak Factor in Water Supply Facilities (우리나라 상수도시설의 첨두부하 영향요소 분석)

  • Hyun, In-hwan;Lee, Che-in
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.18 no.1
    • /
    • pp.49-58
    • /
    • 2004
  • This study is to analyze the affecting factors to the peak factor in the drinking water supply Facilities. The peak factor is a very important element to determine the capacity of the water supply facllities. Several factors such as Population served, average day water demand, ratio of domestic water use, ratio of affairs & business water use and water use per capital per day were selected as the affecting factors in this study. In this study, peak factor characteristics for Korean facilities were compared with those for Japanese ones. As a result, non-exceedance probability was suggested as the designing method for the peak factor. Also, the 50% non-exceedance probability values and the 90% values based on the 1998-1999 data were suggested in this study.