• Title/Summary/Keyword: Water resources facility improvement project

Search Result 7, Processing Time 0.019 seconds

Decision Support Model for Selection Water Resources Facility Improvement Projects (수리시설개보수사업 선정을 위한 의사결정지원모델)

  • Nam, Song Hyun;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.449-459
    • /
    • 2021
  • More than 80 % of agricultural reservoirs are old facilities over 50 years old, and safety and function declines occur. As a result, safety accidents such as the collapse of the reservoir have occurred. Precise safety diagnosis is conducted in advance to prevent accidents such as reservoir collapse, and Water resources facility improvement project are implemented based on priority. However, the priority of the business is selected based on the subjective judgment of the facility manager. In this study, we set 80 hypotheses based on the results of precision safety diagnosis and decision-making examples of existing Water resources facility improvement project and selected 45 variables using correlation analysis and significance test. Using logistic regression analysis, the final 21 variables were selected and a decision support model was presented, and the classification accuracy of the model was 86.8 %. In this research, the part that presented the quantitative index for decision support when selecting the Water resources facility improvement project has important significance.

Recycling of a discarded septic tank as a rainwater management system and it's economic feasibility analysis (폐정화조를 재활용한 다목적 빗물관리시스템 구상 및 경제성 분석)

  • Kim, Mikyeong;Kwak, Donggeun;Han, Mooyoung;Yang, Jichung
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.5
    • /
    • pp.647-654
    • /
    • 2009
  • Since the end of the 1990s, sewer pipe improvement works have been going on: most septic tanks have been thrown away and discarded. These discarded septic tanks amounts up to 370,000 based on the project plan 2005-2008: it is a serious squander of nation's resources, a contaminating means that buries toxins under soil, and a cause of a expensive waste. Research on recycling of discarded septic tank as a new resource is in urgent need. This research suggests plans to recycle discarded septic tank as a rainwater management facility, solutions to water cycle recovery in the limelight, and economic analysis of the plan. In the case of a recycling discarded septic tank as a rainwater management facility will socially benefit to support economical adequacy, discard cost saving of septic tank and water supply and sewage cost reduction will come out. Consequently a rainwater management facility converted from a discarded septic tank leads to decentralization of the rainwater management system, which anticipates a positive effect on recovery of urban water cycle.

A Study on the Effect to Reduce the Greenhouse Gas with a Pump Scheduling System in Water Supply Plant : Energy Efficiency Improvement CDM Project in Paldang Pumping Station(III) (펌프 스케쥴링 시스템을 적용한 수도사업장의 온실가스 저감효과 분석 : 팔당3 취수장 에너지효율향상 CDM 사업을 중심으로)

  • Kim, Min Su;Lee, Hyung Muk;Park, Min Su;Gwon, Gi Beom
    • Journal of Climate Change Research
    • /
    • v.4 no.1
    • /
    • pp.63-75
    • /
    • 2013
  • The purpose of this study is to analyze the green-house gas emission reduction of the pump scheduling system applied to the water-supply facilities in all objectivity with AMS-II.C/Version 13 in CDM methodology. To calculate the baseline and project emission in Paldang Pumping Station (III) the data about water flow, water level, electricity consumption, etc. before and after the implementation of project was used. This study considers internal facility (mostly for lighting) electricity consumption and grid loss in order to get more accurate emission reductions. The methodology used in this study will be able to apply to different energy improvement techniques to calculate emission reductions in water supply facilities.

Estimation of Water Quality Improvement Benefit Using Replacement Cost Approach (대체비용법을 이용한 하천 수질개선편익 산정)

  • Yeo, Kyu-Dong;Yi, Choong-Sung;Kim, Gil-Ho;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.4
    • /
    • pp.343-353
    • /
    • 2009
  • The objective of this study is to evaluate the effect of the water quality improvement by water discharge through dams and to provide a benefit estimation methodology, taking domestic situation into consideration, by the replacement cost approach analyzed with a sewage treatment plant instead of an alternative dam. To this end, facility that alternates a dam must have same functions of the discharged water from the dam and the two facilities must be able to be compared objectively. To estimate the benefit, estimation methodology of alternative facility's cost is established and criteria of cost.benefit analysis that are duration period and ratio of large scale repairing expense was presented. As a case study, the water quality improvement benefit of Song-Li-Won dam was evaluated, which is planned to be built on Nae-Sung stream in Nak-Dong River system. The results of applying this methodology to Song-Li-Won dam are 644,006 million won of the annual average discharge and 1,351,526 million won of maximum discharge. The usage of the framework in this study is expected for estimation of water quality improvement benefit in case water quality improvement project is performed.

Analysis of Operating and Maintenance Parameters for Agricultural Pipeline System Using EPANET (EPANET을 이용한 농업용 관수로 시스템의 운영 및 유지관리 인자 분석)

  • Kim, Nam Do;Kim, Sun Joo;Kwon, Hyung Joong;Kim, Phil Shik;Park, Hyun Jun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.4
    • /
    • pp.17-26
    • /
    • 2017
  • In this study, EPANET model which is using on the pipe network analysis was applied to Haenam irrigation district has provided irrigation water by pipeline system about 1,125ha and then have built pipe network to study area and supply performance evaluation of existing structure was analyzed by SPA (Single Period Analysis) in EPANET. As model results of simulation average ratio of maximum supply quantity/irrigation water requirements(base demand) was analyzed by 2.63. It means also that was analyzed as being capable of ensuring the water supply capacity. It was provided the necessary information for the maintenance facility through analyzed hydraulic behaviors in the pipeline inside such as flow velocities, pressures and hydraulic grade lines. It was satisfied with the allowable design criteria that was compared analyzed results with presented allowable design standards at agricultural production infra improvement project planning and design (Pipeline design standard). In order to analyze efficiency promotions of irrigation water, using Extended Period Simulation it was compared supply quantity with irrigation water requirements while pumps set operating pattern in 24 hours, then efficiency promotions of irrigation water was determined through analyzed oversupply water quantity and occurrence time by branch lines. According to results for oversupply quantity in Haenam district by time and end of branch lines efficiency promotions of irrigation water was suggested from 0.33 % to 37.59 %. To draw reasonable operating rules for water use and through this research, it is expected to be helpful for efficient water use and operational management of agricultural pipeline system to the current agricultural irrigation.

Cause Analysis for Reduced Effect of Sewer Pipe Improvement Project Based On Investigation of Interceptor Sewers (차집관로의 조사 및 분석을 통한 하수관로정비 사업의 효과 감소 원인 분석)

  • Chae, Myungbyung;Bae, Younghye;Kim, Hungsoo
    • Journal of Wetlands Research
    • /
    • v.20 no.3
    • /
    • pp.219-226
    • /
    • 2018
  • Interceptor sewer is installed underground near to the river side mostly ofstate-owned land and the management efficiency of public sewage disposal facilities is decreasing as too much infiltration/inflow(I/I) and river flow to interceptor sewer are caused by broken or deteriorated sewer. This also affects the sewer pipeline project and decreases its efficiency. Therefore, the aim of this study is to investigate interceptor sewer which has influence on the reduction of the project effect. The investigation were performed for three study areas. The study includes the investigation of current condition of interceptor sewer(sewer extension, pipe diameter, pipe type, installed year, installed locations, etc), investigation of inside of sewer by CCTV accompanied by pumping and dredging works where required, investigation of inside of manholes by eyes, calculation of pollutant load using the results of investigation of flow quantity and quality. Multipoint investigations were simultaneously performed for flow quantity at confluence area and other investigations were also performed for flow quantity and BOD for interceptor sewer and comparison of pollutant load, investigation of infiltration/inflow(I/I) caused by deterioration of interceptor sewer. As the result of the study, a main reason for reduced effect of sewer pipe improvement project was analyzed as the low-density sewage and I/I in public seweage treatment Facility due to deteriorated and unmanaged interceptor sewers.

A Study on the Site Selection Method for the Creation of a Flood Buffer Section Considering the Nature-based Solution - Case Study from Upstream of Daecheong Dam to Downstream of Yongdam Dam (자연성기반기술의 홍수완충구간 조성을 위한 입지 선정 방법에 관한 연구 - 대청댐 상류부터 용담댐 하류구간 사례 연구)

  • Ji, Un;Jang, Eun-kyung;Bae, Inhyeok;Ahn, Myeonghui;Bae, Jun
    • Ecology and Resilient Infrastructure
    • /
    • v.9 no.3
    • /
    • pp.131-140
    • /
    • 2022
  • The magnitude and frequency of extreme floods are increasing owing to the effects of climate change. Therefore, multipurpose flood management techniques incorporating nature-based solutions have been introduced to mitigate the limitations of flood management and river design methods relying on existing observation data. Nature-based solutions to prepare for such extreme flooding events include ways to retreat the embankment, expand the floodplain, and reduce flood damage. To apply these technologies, adopting appropriate location selection methods based on various evaluation factors, such as flood damage reduction effects, sustainable ecological environments, river connectivity, and physical channel structure enhancements, should be prioritized. Therefore, in this study, the optimal location for implementing the multipurpose floodplain construction project was determined by selecting the location of the floodplain expansion with objectivity in the river waterfront area upstream of Daecheong Dam to downstream of Yongdam Dam. Through the final location determination, the Dongdaeje and Jeogokje sections were included in the optimal location considering both flood damage reduction and water environment improvement.