• 제목/요약/키워드: Water Source Heat Pump

검색결과 270건 처리시간 0.025초

생태도시에서의 자원활용에 관한 연구 -하수 에너지 활용을 위한 보유열량 평가- (Study on Utilizing Resources in Ecopolis -Evaluation of the Potential Heat Capacity of Sewage For Utilizing as Sewage Energy-)

  • 정용현
    • 한국환경과학회지
    • /
    • 제12권6호
    • /
    • pp.583-591
    • /
    • 2003
  • The research on potential energy was conducted to conserve the high-exergy energy like primary energy and utilize waste heat from sewage. From the Point of view in using the waste heat, the energy Potential of waste water from the model house was simulated. From the results, when the heated water was supplied to the model house side in order to put unused energy to Practice use, heated water had higher energy Potential than unheated water, which was due to the discharge of most of unused energy. The possessing heat capacity of sewage from heated water was increased to 40-70 percents in comparison with that from the unheated water. Therefore, it can be used as energy source for improving coefficient of performance of heat pumps. By adopting the multiple heat pump into a model house, It showed that the possessing heat capacity of sewage was reduced. It was also found that the heat was recovered as energy source fur multiple heat pump in a model house.

공기열원 2중히트싱크 열펌프의 성능해석 (Performance Analysis of Heat Pump System with Air Source Evaporator and Single Unit Dual Sink Condenser)

  • 우정선;이세균;이재효;박효순
    • 태양에너지
    • /
    • 제18권4호
    • /
    • pp.11-22
    • /
    • 1998
  • Floor panel heating system using hot water is the primary heating system of domestic residential building. This paper presents the results of performance analysis of the heat pump system with air source evaporator and single unit dual sink(SUDSk) condenser. The heat exchanger combines two separated condensers into a single condenser and the object of the SUDSk condenser is to release energy to dual sinks, i.e. air for air heating system and water for panel heating system in one single unit. Simulation program is developed for single unit dual source(SUDS) SUDSk heat pump system and some experimental data are obtained and compared with simulation results. Differences of heating capacity and COP in dual source operating mode are 7% and 8% respectively. Simulation results are in good agreement with test results. Therefore, developed program is effectively used for design and performance prediction of dual source dual sink heat pump system with SUDS evaporator and SUDSk condenser.

  • PDF

열원 및 부하조건에 따른 물-공기 히트펌프 시스템의 성능분석 (Performance Analysis of Water-to-Air Heat Pump System under Water Temperature and Load Ratio)

  • 조용;이동근
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 춘계학술대회 초록집
    • /
    • pp.194.2-194.2
    • /
    • 2011
  • Heating and cooling performance has been analyzed for the water-source heat pump system using raw water from Daechung reservoir. During heating operation from March to May, water temperature is not good condition for a heat source due to the higher atmospheric temperature. Avearged heating load ratio is only 14.3%, and the averaged unit COP and system COP are estimated to be 2.46 and 2.15 respectively. The COP is affected considerably by the water temperature, and the unit COP is increased from 2.16 at $5^{\circ}C$ to 2.95 at $11^{\circ}C$. Cooling performance is analyzed with the measured data from June to August. During cooling operation, raw water has lower temperature by 4. $5^{\circ}C{\sim}4.7^{\circ}C$ than the atmosphere. The load ratio is 39.2%, and the averaged unit COP and system COP are estimated to be 7.25 and 6.13 respectively. The heating COP is affected by the load ratio rather than water temperature. The COP is increased for 20%~40% load ratio, while is decreased for 40%~60% load ratio. It is estimated that the compressor operation combination for 3 (two constant speed and one inverter) compressors is changed for the load ratio.

  • PDF

중온 지열수를 이용한 고온제조 열펌프 시스템 해석 및 설계 (Design of a High Temperature Production Heat Pump System Using Geothermal Water at Moderate Temperature)

  • 김민성;백영진;박성룡;장기창;이영수;나호상
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2008년도 춘계학술대회 논문집
    • /
    • pp.638-641
    • /
    • 2008
  • Geothermal water at moderate temperature in a range between 30 to $50^{\circ}C$ exists sparse in surroundings. Mostly they are utilized as heat or water source at spar zones in Korea. However, a large portion of used water is discarded due to its poor recovery quality and inferior application technologies. In this research, an innovative heat pump system based on the hybrid concept that combinate compression cycle and absorption cycle was investigated mathematically. The hybrid heat pump aims to recycle various kind of the heat sources at moderate temperature including geothermal water effectively. The prime objective of the simulation is to design a compression/absorption hybrid heat pump system which can make high temperature above the level of $90^{\circ}C$ and low temperature of $20^{\circ}C$ as well at the same using $50^{\circ}C$ geothermal heat water. As a result, primitive data was provided as a basis to design a prototype 3 RT class hybrid heat pump.

  • PDF

해수열원 히트펌프 시스템의 운전특성 (The Operation Characteristics of a Sea Water Source Heat Pump System)

  • 장기창;백영진;나호상;김지영;이재훈
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.1353-1357
    • /
    • 2008
  • A sea water source cascade heat pump was designed and tested in this study. The system was designed to perform a single stage operation in summer, as well as a cascade operation in winter to ensure the high temperature lift. A steady-state simulation model was developed to analyze and optimize its performance. The simulation results show that the R717 exhibits best performance among combinations considered in this study. A R410A also exhibits the highest performance among HFCs with the smallest compressor displacement. A 15-RT R410A-R134a pilot system was installed in the 5-story commercial building at Samcheok City by the East Sea. A scroll type R410A compressor, a reciprocating type R134a compressor, plate type condenser/ evaporator/ cascade heat exchanger and two electronic expansion valves were used to build a pilot. A titanium plate type heat exchanger is also used for the heat exchanging with a sea water. The heat source/sink water is supplied from the well below the seashore in the depth of 5 m. In the initial test of the system, supply water temperature was rising up to $67^{\circ}C$ using a sea water heat source of $9^{\circ}C$, while an ambient temperature was $4.5^{\circ}C$.

  • PDF

해수열원 히트펌프 시스템의 설계 및 운전 (A Design and Test of a Sea Water Source Heat Pump System)

  • 이재훈;김지영;백영진;장기창;나호상;신광호
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.1273-1278
    • /
    • 2008
  • A sea water source cascade heat pump was designed and tested in this study. The system was designed to perform a single stage operation in summer, as well as a cascade operation in winter to ensure the high temperature lift. A steady-state simulation model was developed to analyze and optimize its performance. The simulation results show that the R717 exhibits best performance among combinations considered in this study. A R410A also exhibits the highest performance among HFCs with the smallest compressor displacement. A 15-RT R410A-R134a pilot system was installed in the 5-story commercial building at Samcheok City by the East Sea. A scroll type R410A compressor, a reciprocating type R134a compressor, plate type condenser/ evaporator/ cascade heat exchanger and two electronic expansion valves were used to build a pilot. A titanium plate type heat exchanger is also used for the heat exchanging with a sea water. The heat source/sink water is supplied from the well below the seashore in the depth of 5 m. In the initial test of the system, supply water temperature was rising up to $67^{\circ}C$ using a sea water heat source of $9^{\circ}C$, while an ambient temperature was $4.5^{\circ}C$.

  • PDF

학교 건물에 설치된 지열원 열펌프 시스템의 실사용을 통한 냉난방성능 연구 (Cooling and Heating Performance Under the Actual Operating Condition of a Ground Source Heat Pump System in a School Building)

  • 김의영;정영만;송재도;이재근;김인규;이동혁
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.586-589
    • /
    • 2009
  • This paper presents the performance of a water-to-refrigerant type ground source heat pump (GSHP) system installed in a school building in Korea. For analyzing the performance of the GSHP system, we monitored various operating conditions, including the outdoor temperature, the ground temperature, and the input power of the GSHP system. The average cooling coefficient of performance (COP) of the heat pump was found to be 8.5 at 60% partial load condition, while the overall system COP was found to be 5.9. The average heating COP of the heat pump was found to be 6.5 at 45% partial load condition, while the overall system COP was found to be 5.0.

  • PDF

외기 온도 제어 방식을 적용한 지열 히트펌프 시스템의 냉방 성능 분석 (Cooling Performance Analysis of Ground-Source Heat Pump System with Capacity Control with Outdoor Air Temperature)

  • 손병후
    • 한국지열·수열에너지학회논문집
    • /
    • 제17권4호
    • /
    • pp.68-78
    • /
    • 2021
  • In order to solve the increasing deterioration of the energy shortage problem, ground-source heat pump (GSHP) systems have been widely installed. The control method is a significant component for maintaining the long-term performance and for reducing operation cost of GSHP systems. This paper presents the measurement and analysis results of the cooling performance of a GSHP system using capacity control with outdoor air temperature. For this, we installed monitoring equipments including sensors for measuring temperature, flow rate and power consumption, and then monitored operation parameters from July 9, 2021 to October 2, 2021. From measurement results, we analyze the effect of capacity control with outdoor air temperature on the cooling performance of the system. The average performace factor (PF) of the heat pump was 6.95, while the whole system was 5.54 over the measurement period. Because there was no performance data of the existing GSHP system, it was not possible to directly compare the existing control method and the outdoor air temperature method. However, it is expected that the performance of the entire system will be improved by adjusting the temperature of cold water produced by the heat pump, that is, the temperature of cold water on the load side according to the outside air temperature.

지중열원 열펌프시스템의 성능해석 (A Study on the Performance of Ground Source Heat Pump System)

  • 이세균;우정선;노정근
    • 한국태양에너지학회 논문집
    • /
    • 제25권4호
    • /
    • pp.69-76
    • /
    • 2005
  • The performance of water-to-water heat pump system coupled with the ground source vertical heat exchanger is presented in this paper. The CAP program of Florida Heat Pump Co. is used to predict the heat pump performances while the EED program calculates the borehole fluid temperature. It is shown that COPH increases with decreasing the temperature of output water for the operation of heating mode and COPR increases with increasing temperature of output water for the operation of cooling mode. The value of specific heat extraction rate must be moderate to insure the reasonable installation cost of borehole system. With $1^{\circ}C$decrease of $T_{wo}$ the average COPH increase is estimated as about $0.06/^{\circ}C$(for $T_{wo}\;=\;45{\sim}60^{\circ}C$ range) while with $1^{\circ}C$ increase of $T_{wo}$ the estimation of COPR increase is about $0.13/^{\circ}C$(for $T_{wo}\;= \;5{\sim}11^{\circ}C$ range) at the specific heat extraction rate of 30W/m.

하수열원 열펌프 시스템의 성능 시뮬레이션 (A Characteristics Simulation of Heat Pump System for Sewage Water as a Heat Source)

  • 박일환;장기창;이영수;윤형기;백영진
    • 설비공학논문집
    • /
    • 제20권4호
    • /
    • pp.280-286
    • /
    • 2008
  • In this study, characteristics simulation of heat pump system is investigated for heating and cooling using sewage water as a heat source. A simulation program for preestimate operation characteristics of heat pump system is developed. The performance of this system is resolved by several variables and the characteristics which is based on actual air and sewage temperature data. The simulation results agree well with the experimental values of COP. In the analysis of system characteristics, the COP is changed between $3\sim5$ in winter season for heating load, $4\sim6$ in summer season for cooling load. As the results of Life Cycle Cost analysis over a 15 year life cycle, the energy cost could be reduced by 250 million won if a heat pump system was used instead of a conventional boiler and an absorbtion refrigerator on the office building.