• Title/Summary/Keyword: Water Quality and Flowrate Monitoring

Search Result 13, Processing Time 0.02 seconds

Use of Tributary Water Quality and Flowrate Monitoring Data for Effective Implementation of TMDL (수질오염총량관리제의 효율적인 시행을 위한 지류하천 수질.유량모니터링 자료의 활용)

  • Kim, Young-Il;Jeong, Woo-Hyeok;Kim, Hong-Su;Yi, Sang-Jin
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.34 no.2
    • /
    • pp.119-125
    • /
    • 2012
  • The tributary water quality and flowrate monitoring result, which is fundamental data for the establishment of the water environmental policy, is used as very important data for the implementation of TMDL. This study introduced how to use the tributary water quality and flowrate monitoring data for the analysis of the watersheds, the satisfactory assessment of water quality standards in the watersheds, the selection of watersheds for the establishment of the implementation plan, and the selection of the tributary catchments for improving the water quality using a stream grouping method. According to the analytical results of tributary catchment using water quality and flowrate monitoring data of thirty-seven tributaries in the Geum-River watershed at Chungcheongnam-do, the value of flowrate in the tributaries, which is located in the middle-lower Geum-River watershed, was greater than the other areas and the concentration of the water pollutants regardless of water quality parameters in the tributaries at Nonsancheon catchment was relatively higher than the other areas. The problems, which have the determination of satisfaction of water quality standards and selection of target watersheds for establishment of the implementation plan regardless of the water quality of tributary in the watershed due to the water quality and flowrate monitoring results of the main river, were improved use of the results of tributary water quality and flowrate monitoring. Also, the tributary catchments for improving the water quality, according to stream grouping method based on the results of tributary water quality and flowrate monitoring, were selected. In the Geum-River watershed at Chungcheongnam-do, the tributary in the Nonsancheon, Byeongcheoncheon, Seokseongcheon, Jocheon catchments, which has a large flow and a high concentration of water pollutants, should be preferentially selected for improving the water quality of the tributary in accordance with the reduction of the source of pollution.

Selection Priority of Tributary Catchments for Improving Water Quality using Stream Grouping Method (하천그룹화 방법을 이용한 수질개선 하천유역의 우선순위 선정)

  • Cho, Byungwook;Choi, Jeongho;Yi, Sangjin;Kim, Youngil
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.1
    • /
    • pp.18-25
    • /
    • 2012
  • For effective watershed management, it is very important to select the tributaries through selection and concentration of targeted tributary catchments for improving water quality within the limited financial conditions. This study introduced the selection and diagnosis procedure of tributary catchments for improving water quality at Chungcheongnam-do based on water quality and flowrate monitoring, stream grouping method. The tributaries with high value of water quality and flowrate were selected for improving water quality according to stream grouping method. The diagnosis of selected tributaries for improving water quality was performed with analysis of the pollution load (generated, discharged, delivered) and point source discharged pollution load density. The plans for improving water quality of tributaries were suggested thorough various diagnosis of tributary catchments. For improving water quality of tributaries in Chungcheongnam-do, the tributary catchments in the Dangjin, Asan, Yesan, Cheonan, Hongseong area should be preferentially considered. The water quality improving plans for those tributary catchments, in accordance with the reduction of sources of pollution by population and livestock, should be established.

Temporal and Spatial Analysis of Flowrate and Water Quality of Major Tributaries for Implementation of TMDL in Sapgyo-reservoir Watershed at Chungcheongnam-do (충청남도 삽교호수계 수질오염총량관리제 시행을 위한 주요하천 유량 및 수질의 시.공간적 특성 분석)

  • Park, Sang-Hyun;Moon, Eun-Ho;Cho, Byung-Wook;Choi, Jeong-Ho;Jeong, Woo-Hyeok;Kim, Hong-Su;Yi, Sang-Jin;Kim, Young-Il
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.1
    • /
    • pp.107-113
    • /
    • 2013
  • The major tributaries in Sapgyo-reservoir watershed at Chungcheongnam-do were monitored for flowrate and water quality in order to analyze the characteristics of watershed and to prepare for implementation of total maximum daily load (TMDL). According to the analytical results of flowrate and water quality monitoring data of sixteen tributaries, the tributaries with the value of flowrate over $0.5m^3/s$ were 62.5% among the monitored tributaries and the value of flowrate in the Cheonancheon, Namwoncheon, Shinyangcheon except Gokgyocheon, Muhancheon, Sapgyocheon was relatively greater than the other tributaries. However, 37.5% of the tributaries were exceeded the water quality standards of Sapgyocheon sub-basin ($BOD_5$ 5 mg/L and/or below) and the concentration of water pollutants regardless of water quality parameters in Cheonancheon, Maegokcheon, Oncheoncheon including Gokgyocheon located in Gokgyocheon catchment were relatively higher than the other tributaries. The tributaries for improving the water quality, according to stream grouping method based on the results of flowrate and water quality monitoring data, were selected. In the Sapgyo-reservoir watershed, the tributaries for improving water quality, which has a large flowrate and a high concentration of water pollutants, were selected at Cheonancheon, Gokgyocheon, Maegokcheon, Namwoncheon, Oncheoncheon. The various water quality improving plans for those tributaries, in accordance with the reduction of point source pollution by population and livestock, should be established and implemented.

Improvement of Procedures for Reasonable Implementation of TMDL (수질오염총량관리제의 합리적인 시행을 위한 시행절차 개선방안)

  • Kim, Young-Il;Yi, Sang-Jin
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.8
    • /
    • pp.617-622
    • /
    • 2011
  • The policy of total maximum daily load (TMDL) was introduced to manage wasteload within the loading capacity to achieve water quality standards in the watershed. While the TMDL was implemented, the institutional and technical correction for the improvement of procedure was accomplished even though there were various problems and basically through the process of trial & error. However, a fundamental improvement of this policy is needed to implement the TMDL. This study has come up with a new viewpoint on improving this procedure for reasonable implementation of TMDL. First of all, the water quality and flowrate monitoring of the tributaries should be implemented. This should be done through the establishment of a monitoring system which will include standards of scope, a set time period, water quality parameters and frequency follow ups for the implementation of TMDL. The basic plan in all of the watersheds should be developed based on the establishment of water quality parameters and standards for water use and ecological purposes according to the results of the water quality and flowrate monitoring in the watersheds. The implementation plan for water quality improvement should be established in the watersheds where exceeds the targeted water quality standards. The performance assessment of TMDL should be conducted every year to meet the satisfaction assessment of water quality standards in the watersheds. Finally, if the water quality standards in the watersheds can not be attained or the water quality parameters and standards should be changed, the implementation procedure will be performed according to the iterative process. On the contrary, the policy of TMDL in the watersheds where the water quality standards have been met the goal will be finished.

Improvement of Water Quality and Streamflow Monitoring to Quantify Point and Nonpoint Source Pollutant Loads (점오염원과 비점오염원 부하량 정량화를 위한 수질 유량 모니터링 개선)

  • Jang, Ju-Hyoung;Lee, Hyung-Jin;Kim, Hyun-Koo;Park, Ji-Hyoung;Kim, Ji-Ho;Rhew, Doug-Hee
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.5
    • /
    • pp.860-870
    • /
    • 2010
  • Long term monthly monitoring data showed that the water quality of streams flowing into Lake Paldang has been improved by various strategy for water. However, the effect of quality on Lake Paldang is still insufficient because of nonpoint source from watershed. In order to evaluate quantifying methods for pollution source and make a suggestion on improvements, Storm Water Management Model (SWMM) was constructed by using data set from the water quality and streamflow monitoring network in the Kyoungan watershed for Total Maximum Daily Loads (TMDLs). Load duration curve (LDC) based on the result of the Kyoungan watershed SWMM indicated that the water quality criterion on $BOD_5$ was often exceeded in up-stream than down-stream. From flowrate-load correlation curve, SS load significantly increased as streamflow increases. 75.3% of streamflow and 62.1% of $BOD_5$ loads is discharged especially in the zone of high flows, but monitoring data set didn't provide proper information about the conditions and the patterns associated with storm events. Therefore, it is necessary to acquire representative data set for comparing hydrograph and pollutograph through monitoring experimental watershed and to establish methods for quantifying point and nonpoint source pollutant loads.

A Study on Dynamic Water Quality Change for Gate Operation in Seonakdong River (서낙동강 수문 운영에 따른 동적 수질 변화 연구)

  • Kim, Jung Min;Kim, Young Do
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1401-1411
    • /
    • 2013
  • The inflow from Daejeo gate and the outflow from Noksan gate in Seonakdong river, which is a reservoir-like river with the characteristics of stagnant water, is very important for TMDLs (Total Maximum Daily Load) of Nakbon N unit watershed. However, there are very few measured data for calculating base flow. The operating data is much different from the actual measured data because the probable maximum flowrate is used for gate operation. In this study, the operating flowrate data of Daejeo and Noksan gates are compared with the monthly water quality data from Ministry of Environment monitoring station. The dynamic change of the flowrate and the water quality is also measured for the operation of Daejeo and Noksan gates. The flowrate of Seonakdong river is measured, which is affected by the gate operation, the water elevation difference of Nakdong river and Seonakdong river, and the tidal elevation. The results of this study can be used for establishing the water quality improvement measures by the optimal gate operation.

Establishment of Role Between Central and Local Government for Implementation of Total Maximum Daily Load (수질오염총량관리제 시행에 있어서 중앙정부와 지방자치단체 간 역할정립)

  • Yi, Sang-Jin
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.5
    • /
    • pp.378-383
    • /
    • 2011
  • The policy of total maximum daily load (TMDL) was adopted to manage water pollutants so as to keep the total amount of pollutants in the watersheds within established target water quality. While the TMDL was implemented in all four major river basins, various problems occurred. Even though the corrections for problems were conducted, the role between central and local government was not established exactly. This study was presented to suggest a role between central and local governments for effective implementation of TMDL. When the central government establishes the environmental criteria with water quality standards and pollutants in the main rivers, the local government should establish the level of target pollutants in the watershed. Also, the local government should be continuously implementing the water quality and flowrate monitoring of the tributaries to find out the degree of water quality improvement in the tributaries. Especially, the basic plan of TMDL for the whole watershed should be established by the river basin environmental office at the central government. The local government should be established the implementation plan of TMDL for the watershed where exceeds the established target water quality. The performance assessment of TMDL should be implemented every year to the water quality and flowrate monitoring of the tributaries for satisfaction assessment of target water quality in the watershed by the lower-lever government. The performance assessment report of TMDL included with an analysis of causes for the excess water quality in the watershed should be submitted to the river basin environmental office at the end of the TMDL planning period.

Characteristics of Pollution Loads from the Combined Sewer during Dry Season (무강우시 합류식 하수관거의 오염부하 특성)

  • Won, Chul-Hee;Choi, Yong-Hun;Park, Woon-Ji;Shin, Min-Hwan;Choi, Joong-Dae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.6
    • /
    • pp.137-144
    • /
    • 2011
  • We have examined the pollutant load of combined sewer in dry days. Two monitoring sites (C-1, C-2) were equipped with an flowmeter. Monitoring was conducted from September 2004 to April 2006 for 20 months during dry days. Flowrate and concentration of pollutants are lowest from 3 to 6 o'clock, and it is high at 9, 12 and 21 o'clock. Most of organic matters exist in the dissolved state. The results show that pollution loads in C-2 area were 4.5-7.2 times higher than in C-1. Pollutant loads were high on Saturdays. Pollutant loads (kg/ha/day) of C-2 were 1.1-3.1 times higher those of C-1. However there was no significant difference in winter. Analysis of correlation coefficient of water quality parameter indicates that besides of flowrate all items in C-1 site have tight relationship respectively (p<0.01). In C-2 site, correlation coefficient of TP-SS, TP-TN, TP-flowrate, BOD-flowrate, BOD-SS and TN-TP are statistically significant (p<0.01).

Flow Rate·Water Quality Characteristics of Tributaries and a Grouping Method for Tributary Management in Nakdong River (낙동강 지류·지천의 유량·수질 특성 및 하천관리를 위한 등급화 방안 연구)

  • Na, Seungmin;Lim, Tae Hyen;Lee, Jae Yun;Kwon, Heongak;Cheon, Se Uk
    • Journal of Wetlands Research
    • /
    • v.17 no.4
    • /
    • pp.380-390
    • /
    • 2015
  • In this study, the major 38 tributaries in Nakdong River were monitored for flow rate and water quality in order to understand the characteristics of the watershed and to find improvement plan. The flow rate and water quality for each target tributary were evaluated based on the monitoring data in 2013~2014 using a statistical package SPSS-22.0. In addition, the tributary grouping method was conducted using a $BOD_5$ concentration/flowrate and TP concentration/flowrate monitoring data. The average values of $BOD_5$, $COD_{Mn}$, TP and TOC concentrations in Gumicheon, Gyeonghocheon, Jincheoncheon, Gisegokcheon, Yonghacheon and Yonghocheon located at Nakdong Waegwan and Nakdong Goryung watershed were high and in the grade of III or IV (5~8 mg/L). The Pearson correlation coefficients of TOC with $BOD_5$, $COD_{Mn}$, and TP were greater (r=0.8, p<0.01) than those of the other water quality parameters (12 species). The tributaries with high values of water quality parameters ($BOD_5$ > 3.0 mg/L, TP > 0.1 mg/L) and flowrate (Q > $0.1m^3/sec$) were selected for improving water quality according to the stream grouping method. Five tributaries (Gumicheon, Gisegokcheon, Yonghacheon, Yeongsancheon, Mijeoncheon and Yonghocheon) were classified as Group I, which require polices and plans for water quality improvement.

Watershed Management Plan through Water Quality Monitoring for Main Branches of 4 Water Systems in Chungcheongnamdo (충청남도 4대수계 주요 지류하천 수질 모니터링을 통한 유역 관리 방안)

  • Park, Sanghyun;Kim, Hongsu;Cho, Byunguk;Moon, Eunho;Choi, Jinha
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.2
    • /
    • pp.163-172
    • /
    • 2016
  • This study aimed to develop a plan for effective performance of a watershed through correct identification of a river watershed by using the flowrate of the river and water quality data, which is the basis for the establishment of the water environment policy. The target river for water quality improvement was selected based on the monitoring result for 4 water systems in Chungcheongnamdo province in the recent 3 years. The result of analysis for the distribution of discharge capacity by a pollution source group for the water quality improvement target river showed that most of the target river has a high discharge capacity in the water system for living and livestock. Analysis for the density of the total discharge capacity of the whole watershed of Chungcheongnamdo indicated that the river that needs water quality improvement has high BOD concentration and high discharge load density at the point that this river is located. Thus, for efficient watershed management through selection and concentration, Chungcheongnamdo needs to improve the target river in priority. Stepwise planning is also required to establish and execute the water quality improvement in order to satisfy said target water quality, and establish the index for the water improvement rate for its evaluation.