Park, Yoonkyung;Lee, Jae Kwan;Kim, Jeongsook;Kim, Sangdan
Journal of Korean Society on Water Environment
/
v.34
no.6
/
pp.591-601
/
2018
Optimized BMP plans for controlling water quality using the Pareto trade-off surface curve in upper basin of Namgang Dam is proposed. The proposed alternatives consist of BMP installation scenarios in which the reduction efficiency of non-point pollutants is maximized in a given budget. The multi-objective optimization process for determining the optimal alternatives was performed without direct implementation of a watershed model such as SWAT analysis, thereby reducing the time taken. The shortening of the calculation time further enhances the applicability of the multi-objective optimization technique in preparing regional water quality management alternatives. In this study, different types of BMP are applied depending on the land use conditions. Fertilizer input control and vegetative filter strip are considered as alternatives to applying BMP to the field but only control of fertilizer input can be applied to rice paddies. Fertilizer input control and vegetative filter strip can be installed separately or simultaneously in a hydrologic response unit. Finally, 175 BMP application alternatives were developed for the water quality management of the upper river basin of Namgang dam. The proposed application alternative can be displayed on the map, which has the advantage of clearly defining the BMP installation location.
Proceedings of the Korea Water Resources Association Conference
/
2008.05a
/
pp.754-758
/
2008
This study establishes management plan for water quantity and quality using PCSWMM and alternative evaluation index (AEI). PCSWMM can consider combined sewer overflows (CSOs) and simulate not only the flowrate but aslo the pollutant of BOD, SS, TN and TP for the effectiveness analysis of alternatives. Indicators of AEI are selected using sustainability evaluation concept, driver-pressure-state-impact-response (DPSIR) model and calculated by weighted summation method. These were applied for the Mokgancheon watershed which has many combined sewers. This result will be effective to the integrated watershed management for sustainability.
The variation of stream flow is the one of the most important factors which influence on that of water quality in the unit watershed. The target water quality goal is established and permissible load is allotted in the base of the standard flow condition along with its water quality for the management of Total Maximum Daily Loads (TMDLs). A standard flow selected could cause problems in the load allotment if it was not properly arranged. This study reviewed the acquisition of water quality data, the self-variation and the retainability in water quality on the specific flow conditions. This study also proposed the median and the adjusted average flow condition out of general flow conditions as alternative standard flow conditions. It is considered that the alternatives can make the water quality data easily acquired and the water quality representativeness more enhanced on the standard flow conditions.
Water quality of Chongju and Daejeon Water Intake Tower Region, embayments in Daechong Reservoir was found to be worse than that of main lake after analysis of water which were sampled during April, July, October in 1993. Concentration of COD and SS at those two water intake tower sites were 2.8-5.6 mg/l and 2.2-3.2 mg/l, higher than that of main lake. T-N concentration of those two sites was 1.1-1.9 mg/l similar to that of main lake, and T-P concentration of those two sites was 0.14-0.18 mg/l, higher than that of main lake. This study used water quality model of embayment which can analyse pollutant loads from stream and surrounding land use, advection, decay, and diffusion transport between embayment and main lake. The model can predict water quality of embayment according to the change of pollutant load, water elevation of embayment, quantity of water intake in order to suggest water quality management. This study suggests embayment water quality management alternatives, 1) construction of waste water treatment facilities at embayment and main lake for the decrease of pollutant loading, 2) water intake at main lake less polluted or eutrophicated than embayment, and 3) outflow elevation selection for polluted hypolimnion water outflow during stratification.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
2001.10a
/
pp.403-407
/
2001
For the water quality management of stream and lake, it is important to estimate and control nonpoint source loading to meet the water quality standard. So, integrated watershed management is required. BASINS is a multipurpose environmental analysis system for use by regional, state, and local agencies in performing watershed and water quality based studies. BASINS was developed by the USEPA to facilitate examination of environmental information, to support analysis of environmental systems and to provide a framework for examining management alternatives. BASINS contains HSPF which is one of the watershed runoff model. By using HSPF, nonpoint source loading from upper stream watershed was estimated. As a result, the simulated runoff was in a good agreement with the observed data and indicated reasonable applicability for whole watershed.
Proceedings of the Korea Water Resources Association Conference
/
2007.05a
/
pp.1008-1013
/
2007
The objectives of the paper were to identify appropriate best management practices (BMPs) for reducing nonpoint source (NPS) pollutant loadings and to simulate the effects of the application of the several BMP scenarios on the study watershed using Agricultural Nonpoint Source (AGNPS) model. AGNPS model was calibrated and validated for runoff, sediment yield, and nutrient components using the observed hydrologic and water quality data. The simulated runoff, sediment, and nutrient components were well agreed with observed data. The validated AGNPS was applied to estimate the NPS pollution removal efficiency for BMP scenarios which were selected considering the pollutant characteristics of the study watershed.
This study analyzes the effect of alternatives and estimates alternatives evaluation index (AEI) using PCSWMM and weighted summation method. PCSWMM considering combined sewer overflows (CSOs) in the Mokgamcheon watershed was used and effectiveness analysis of alternative was conducted to develop not only flowrate but also the pollutant of BOD and SS. Indicators of AEI are selected using sustainability evaluation concept, driver-pressure-state-impact-response (DPSIR) framework and calculated by weighted summation method. After estimating AEI, alternatives was classified into three groups G (Good), A (Acceptable) and P (Poor) grade. As a results, it is analyzed that alternatives applied to Oryucheon were G grade and those of Yeokgokcheon were P grade and the remainings were 'A' grade. This result will be effective to the integrated watershed management for sustainablility.
Journal of Korean Society of Environmental Engineers
/
v.22
no.4
/
pp.699-712
/
2000
Juam lake is a major water resource for the industrial and agricultural activities as well as the resident life of Kwangju and Chonnam regions. However, the water quality of the lake is getting worse due to a large quantity of pollutant inflowing to the lake. Thus, the strategy for achieving the water quality goal of the lake should be developed as soon as possible. When there are various alternatives that can be used as the strategy, several criteria based on the achievement degree of water quality goal, the applicability of technique and social environment, and the reasonableness of the cost required are made to evaluate and rank the alternatives. However, it is difficult to make a decision when there are multiple criteria and conflicting objectives and specifically the estimated values of criteria contain elements of uncertainty. The uncertainty stems from the lack of available information, the randomness of future situation, and the incomplete knowledge of expert. As the degree of uncertainty is higher, the decision becomes more difficult. In this study, a fuzzy decision-making method is presented to assist decision makers in evaluating various alternatives under uncertainty. The method allows decision makers to characterize the associated uncertainty by applying fuzzy theory and incorporate the uncertainty directly into the decision making process for selecting the "best" alternative so decisions can be made that are more appropriate and realistic than those made without taking uncertainty in account.
This study developed and calculated alternative evaluation index (AEI) from the effectiveness analyses of alternatives for rehabilitation of distorted hydrologic cycle. The feasible alternatives for the poor-conditioned region in the Anyangcheon watershed were proposed and quantitatively analyzed using continuous water quantity/quality simulation model, Hydrological Simulation Program-Fortran (HSPF). The effectiveness analyses include 355th flow and 275th flow of flow duration curve and number of increased days to satisfy the target monthly flow for water quantity and BOD average concentration, total daily loads and number of increased days to satisfy the target concentration and total daily loads. The feasible alternatives are restoration of covered stream, prevention of streamflow loss through sewers, redevelopment of existing reservoir, reuse of treated wastewater, use of groundwater collected by subway stations and construction of small wastewater treatment plant. Therefore, alternative priority ranking was derived from AEIs. It will be effective to make an integrated watershed management for sustainable development.
Journal of the Korean Society of Environmental Restoration Technology
/
v.7
no.1
/
pp.97-109
/
2004
The disposal of stormwater is one of the major problems in urban water management. One method of reducing peak runoff rates and other detrimental impacts of stormwater is detention storage. Detention ponds as a water quality control alternatives have been investigated by a number of researchers. Recognizing multiple roles such as flood peak attenuation, pollution removal and aesthetic enhancement, the design and management of detentions ponds deserve more research. The purpose of this research is to establish design criteria wet detention ponds to improve water quality. Water quality in detention pond discharge might be improve with physical, chemical and biological alterations. Physical alteration was focused in this study. There are several methods for estimating the suspended solid control capability of wet detention ponds. Existing models of suspended solids removal are based on sedimentation and gravity settling theory. The pollutant trap efficiency of pond is a function of several interrelating factors. Detention time is the most important factor, because it determine gravity settling quantities of pollutants. Desirable modification of physical factors for improvement of water quality in wet detention ponds are volume ratio, area ratio, length to width ratio, depth, out let location, bottom soil type. In order to apply design procedure in actual site, Namak new town development area was selected.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.