• Title/Summary/Keyword: Water Plan

Search Result 1,687, Processing Time 0.029 seconds

Estimation for Reclamation of Public Waters Demand Using Time-series Analysis (시계열 분석을 통한 공유수면 매립 수요 예측)

  • Shin, Chul-Oh;Choi, Eun Chul;Yoon, Sung-Soon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.7
    • /
    • pp.918-923
    • /
    • 2021
  • The Korean government is developing a 10-year master plan pertaining to the Public Waters Management and Reclamation Act. However, it was observed that implementation of the reclamation project through frequent changes would occupy a significant proportion. Thus, questions are being raised about the effectiveness of the master plan. In view of this, the need for a trend analysis on long-term reclamation demand is growing. Accordingly, in this study, a trend analysis of reclamation demand was carried out using the annual reclamation performance data. The results of the analysis indicate that the demand for reclamation of public waters continued to decline, and the trend has been particularly evident since the 1990s, when it was converted into a reclamation master plan. In addition, the total demand for reclamation during 2021-2030 was calculated to be at a maximum of 13.8 km2 and minimum of 1.7 km2.

Application Load Duration Curve for Evaluation of Impaired Watershed at TMDL Unit Watershed in Korea (수질오염총량 단위유역의 유량조건별 수체 손상 평가를 위한 부하지속곡선 적용성 연구)

  • Hwang, Ha-Sun;Yoon, Chun-Gyeong;Kim, Ji-Tae
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.6
    • /
    • pp.903-909
    • /
    • 2010
  • The purpose of this study was evaluated on the applicability of Load Duration Curve Method (LDC Method) using HSPF watershed model and sampling data for efficient TMDLs in Korea. The LDC Method was used for assessment pollutant characteristics in watershed and water quality variation in each water flow level. Load Duration Curve is applied for judge the level of impaired water-body and can be estimated the impaired level by pollutant, such as BOD, T-N, and T-P in this study depending on variation of stream flow. As a result, BOD, T-P was usually exceed the standard value at low flow and dry hydrologic period. Improvement of effluent concentration from WWTP and riparian buffer protection zone are effective to improve the water quality. T-N showed the worst condition at mid-range hydrologic period and moist hydrologic period. Therefore, soil erosion control program and BMPs for non-point source pollution control is effective for recovery the water quality, which can be useful method for management of water quality in the plan of recovery water quality spontaneously. Applicability of LDC Method was evaluated in the Nakbon A watershed. However, we need to consider more detailed and accumulated data set such as accurate GIS data and detail pollution data, and WWTP discharge water quality data for accurate evaluation of watershed. Overall, The LDC Method is adequate for evaluation of watersheds characteristics, and its application is recommended for watershed management and TMDL Implementation.

Development of Management System for a Drainage Basin using Spatial Information (공간정보를 이용한 유역 관리시스템 개발)

  • Shin, Sha-Chul;Kim, Seong-Joon;Chae, Hyo-Sok;Kwon, Gi-Ryang;Lee, Yun-Ah
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.5 no.3
    • /
    • pp.33-44
    • /
    • 2002
  • The water resources information system of a watershed should be set up to understand the water management problems with reflecting basin characteristics for the effective water use. This study is to develop a watershed management system to be operated in water resources and water quality management. In order to promote effective utilization of this system, the various kinds of information data are collected, and this system could be utilized as a valuable tool for maximum uses of them. The information system developed in this study is constructed with GUI(graphic user interface) system using Arc-View and Visual Basic at the circumstances based on the PC. The integrated GIS and Remote Sensing based system is directed to the need for more detailed information on watershed management. The ability to present system clearly provides an indispensable tool for a river basin development and water management plan.

  • PDF

Element Technology and Strategy of Digital Twin in the Water Treatment (수처리공정의 디지털 트윈 요소기술과 추진 전략)

  • Young-Man Cho;Yong-Jun Jung
    • Journal of Wetlands Research
    • /
    • v.25 no.4
    • /
    • pp.284-290
    • /
    • 2023
  • Domestic water supply and sewage facilities are rapidly aging and maintenance difficulties such as aging of operation and management personnel are overlapping, so Digital Twin technology is attracting attention as an intelligent means of process management. Digital twin projects for domestic water treatment processes include the smart sewage treatment project promoted by the Ministry of Environment, projects independently promoted by some local governments, and digital twin purification plant projects promoted by K-water. However, the content of digital twin promotion is different for each institution. Therefore, in the water treatment process, technological standardization and step-by-step implementation methods for digital twins must be preceded to reduce trial and error in future business promotion. This study aims to provide an efficient promotion plan by prescribing the digital twin element technology and composition method in the water treatment process and reviewing the contents currently being promoted by the Ministry of Environment, local governments, and K-Water individually.

Use of Tributary Water Quality and Flowrate Monitoring Data for Effective Implementation of TMDL (수질오염총량관리제의 효율적인 시행을 위한 지류하천 수질.유량모니터링 자료의 활용)

  • Kim, Young-Il;Jeong, Woo-Hyeok;Kim, Hong-Su;Yi, Sang-Jin
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.34 no.2
    • /
    • pp.119-125
    • /
    • 2012
  • The tributary water quality and flowrate monitoring result, which is fundamental data for the establishment of the water environmental policy, is used as very important data for the implementation of TMDL. This study introduced how to use the tributary water quality and flowrate monitoring data for the analysis of the watersheds, the satisfactory assessment of water quality standards in the watersheds, the selection of watersheds for the establishment of the implementation plan, and the selection of the tributary catchments for improving the water quality using a stream grouping method. According to the analytical results of tributary catchment using water quality and flowrate monitoring data of thirty-seven tributaries in the Geum-River watershed at Chungcheongnam-do, the value of flowrate in the tributaries, which is located in the middle-lower Geum-River watershed, was greater than the other areas and the concentration of the water pollutants regardless of water quality parameters in the tributaries at Nonsancheon catchment was relatively higher than the other areas. The problems, which have the determination of satisfaction of water quality standards and selection of target watersheds for establishment of the implementation plan regardless of the water quality of tributary in the watershed due to the water quality and flowrate monitoring results of the main river, were improved use of the results of tributary water quality and flowrate monitoring. Also, the tributary catchments for improving the water quality, according to stream grouping method based on the results of tributary water quality and flowrate monitoring, were selected. In the Geum-River watershed at Chungcheongnam-do, the tributary in the Nonsancheon, Byeongcheoncheon, Seokseongcheon, Jocheon catchments, which has a large flow and a high concentration of water pollutants, should be preferentially selected for improving the water quality of the tributary in accordance with the reduction of the source of pollution.

An Analysis of Process-oriented Design in the Invited Entries of International Competition for the Master Plan of the Yongsan Park, Korea (용산공원 설계 국제공모 출품작에 나타난 프로세스적 설계 분석)

  • So, Jin;Sung, Jong-Sang;Pae, Jeong-Hann
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.2
    • /
    • pp.11-26
    • /
    • 2013
  • Designing large parks such as Yongsan Park requires the open-ended process-oriented design approach in complex layers rather than the conventional self-completed master plan method. This study aims to examine the characteristics of process-oriented design in the eight invited entries of "International Competition for the Master Plan of the Yongsan Park, Korea"(2012). For this purpose, it analyzed each entry according to three criteria: objects of process-oriented approach, time factor and its features of phasing plan, and presentation method of the process. This analysis can not only critically review the current level of the process-centered design methodology but also suggest strategic future directions for Yongsan Park. The objects of process-oriented design in the eight works were order of physical space development, restoration process of ecosystem, recovering process of publicity, and economic operation and management. Main considerations in the objects were connections to adjacent urban fabrics, links to regional green and water system, reuse of existing buildings and infrastructures in the site. The temporal criteria of the phasing plan had two aspects. One was planning a certain time and period, and the other was just establishing an order of phases. Most of the presentation method of process was the phasing plan, but some of the entries suggested a scenario plan. The eight works of "International Competition for the Master Plan of Yongsan Park" did not attempt process-oriented designs entirely and completely. Rather, they tried to introduce the phasing plan as part of a process-centered design. Also, they took an eclectic approach between master plan and process-oriented design instead of rejecting the conventional master plan approach.

Using a Choice Experiment to Measure the Non-market Value of Sea Water Quality with a Focus on the Incheon Special Area Management Plan (선택실험법을 이용한 해역수질 속성의 비시장적 가치 추정: 인천특별관리해역을 중심으로)

  • Jin, Se-Jun;Park, So-Yeon;Yoo, Seung-Hoon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.24 no.4
    • /
    • pp.451-458
    • /
    • 2018
  • The coast of Incheon reaches Incheon itself, Gimpo, Siheung, and Ansan of Gyunggi-do. Because this area has been seriously polluted, the Ministry of Oceans and Fisheries has established the Incheon Special Area Management Plan (SAMP) to preserve sea water quality as a marine environment asset. However, there is concern that actions taken in this area may change the surrounding marine ecology, being effected by farms, via a river that flows from waste lands, abandoned fishing activities and fishing nets, etc. Given this background, this study estimates the value of SAMP sea water quality using a choice experiment (CE). A CE survey of 1,000 households was undertaken, investigating trade-offs involving price and four attributes for selecting a preferred alternative to obtain a marginal willingness to pay (MWTP) estimate for each attribute. The estimation results showed that MWTP for a 1 %p improvement in sea water quality, the diversity of fauna species, the diversity of flora species, and a 1 %p reduction in marine litter as a result of conserving Incheon coastal sea water quality are estimated to be KRW 75, 135, 309 and 72 per household per year, respectively. All estimation results were statistically significant at the 1 % level. These findings can provide policy makers with useful information for evaluating and planning marine environmental management policies.

Management Plan of Whooper Swan(Cygnus cygnus) Habitat Using Causal Loop Analysis : Focused on Eulsukdo (인과순환구조 분석을 통한 큰고니 서식환경 유지방안 -을숙도를 중심으로-)

  • Choi, Yun Eui;You, Soojin;Kang, Sung-Ryong;Choi, Byoungkoo;Chon, Jinhyung
    • Korean Journal of Environment and Ecology
    • /
    • v.29 no.3
    • /
    • pp.353-367
    • /
    • 2015
  • The goal of this study is to analyze the feedback structure of habitat changes of the Whooper Swan in Eulsukdo using system thinking to suggest a management plan for ecosystem health. Using the causal loop diagrams of population changes between Whooper Swan and other bird species in Eulsukdo, we found that the environmental changes in the roosting and foraging area affect the Whooper Swan's population. The causal loop diagrams of the Whooper Swan's roosting area indicated that the environmental changes (e.g., water level, noise, bird watching, and other experience activities) may influence their population density variation. In addition, the casual loop diagrams of the Whooper Swan's foraging area showed that the Whooper Swan's population was affected by various variables that included area factors such as surface area of freshwater, frozen water, salinity, and density of Scirpus planiculmis. Furthermore, through the integrated causal loop diagram, cumulative discharge of Nakdong estuary weir and building activities were identified as the variables that affect the population of the Whooper Swan. Thus, we selected this area as the strategic point to establish a management plan for the Whooper Swan's habitat. The results of this study will help in decision making of a long-term management plan for sustaining the environmental health of the ecosystem in Eulsukdo.

Strategic Management of the Policy for Seoul City's Hangang Renaissance (네트워크 분석적 의사결정방법(ANP)을 이용한 서울시 한강르네상스 정책의 전략적 관리방안)

  • Cho, Se-Hwan;Jeong, Gwang-Seop;Kim, Sang-Won;Won, Jai-Mu
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.1
    • /
    • pp.1-10
    • /
    • 2011
  • This study was performed for the purpose of reviewing the strategic management direction and ideas of the policy for Seoul City's Hangang Renaissance. In order to accomplish this, levels were established for each step of the policy and the policy priority by level was derived. The policy priority by level was analyzed by a decision making model through the Analytic Network Process(ANP) and the priority would be the standard to judge the order of priority. The analysis results showed that there was not a big difference between the priorities of two basic concepts: restoration and creation. The fourth level, detail plan of the third level, showed priority that development by type for waterside city in case of reorganizing city space and diversification of land utilization, utilization of riverside space in water front town for public and composit purpose, establishment of comprehensive plan on constructions in case of improving the landscape of Hangang and unified design plan rose to important element in case of forming Hangang park with the me. Based on the results of priority analysis, we would like to propose for the direction about the policy on Hangang Renaissance project, the policies forming Hangang Park with theme through unified design plan and reorganizing city space have to be proceed preferentially and connected with other plans.

Case Study of Investment Adequacy Analysis After Implementing Master Plan on Sewerage Rehabilitation (하수도정비기본계획 시행 후의 투자적정성 분석에 관한 사례 연구)

  • Park, Kyoo-Hong;Kang, Byong-Jun;Lym, Byeong-In;Knag, Man-Ok;Park, Joo-Yang;Kim, Sung-Tae;Park, Wan-Kyu
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.4
    • /
    • pp.503-510
    • /
    • 2015
  • The objective of this study is to analyze the investment adequacy of the projects implemented according to the master plan on sewerage rehabilitation at Seoul. The planned and actually implemented ratio of invested money on sewage treatment plants (STPs) to sewers were compared in two temporal periods. Though the planned ratio of investment on STPs to sewers was 50:50 (in 2009-2020), the actual implemented ratio in 2009-2013 was 34:66. Until 2020, the greater investment ratio on STPs to sewers should be made considering the necessity of coping with stricter legal compliance on advanced treatment, stormwater treatment and so on. The priority of the planned and partially implemented projects among four STPs and at each STP was evaluated. Considering only the performance indicator of reduced load of BOD, T-N, T-P per the capacity of each STP facility, the performance among four STPs was shown as Jung-Rang>Tan-Cheon>Seo-Nam>Nan-Ji. The reverse order of the performance results in the past may be considered for future investment priority, but the efficiency of operation implemented at each STP, deteriorated status of each STP, investment in the past and so forth should also be considered. As for the priority of projects conducted within each STP, projects related to legal compliance (such as advanced tertiary treatment, stormwater treatment, etc.) have highest priority. Odor-related project and inhabitant-friendly facility related projects (such as building park on STPs, etc.) has lower priority than water quality related projects but interactivity with end-users of sewerage should also be important.