Decommissioning efforts are underway at the reactor where the accident occurred, namely the damaged Tokyo Electric Power Company (TEPCO) Fukushima Daiichi Nuclear Power Plant (FDNPP). However, a large amount of groundwater flowing into the site has become contaminated with radioactive substances and is stored in tanks on site, which has hampered the decommissioning work. Although the inflow of groundwater has been greatly reduced through measures such as the construction of frost walls, approximately 170 ㎥ of water treated by the Advanced Liquid Processing System (ALPS) is being stored in tanks, each day. The tanks used to store this treated water are expected to become full by around the summer of 2022. It is not easy to get people to understand the efforts of all concerned parties, and providing clear information to these concerned parties is also a challenge. Questions have also been raised regarding whether other alternatives have been fully explored in the ALPS subcommittee. Some people have commented that the answers to the questions raised regarding the biological effects of tritium transmutation are inadequate. Some suspect that the answers are too detailed and incomprehensible, and that the respondents may be manipulating the public with some malicious intent. In any case, each possible plan presents both advantages and disadvantages, depending on the people who are involved. That makes it an ethical and vexing issue that can sway decisions, as perspectives change. While the environmental release plan is scientifically safe, it may represent a painful alternative. On the other hand, a more careful and imaginative approach to the idea of continued storage in tanks or other forms of storage may reveal some troublesome hidden disadvantages. Under these circumstances, experts must be prepared to answer people's questions in a comprehensive and robust manner.
In this study, safety devices for ammonia tanks of a company in Ulsan petrochemical industrial complex were studied. The type of a tank is cylindrical and this tank was originally designed to store propylene in 1972. Due to the changes of the production schedule according to market environments, the usage of this tank has been changed to store ammonia. Despite of the changes of materials, there is no scientific information or reviews for guaranteeing the safety. Therefore, in this study, the current status of this tank is investigated to confirm that the operational conditions are complying with safety conditions. Moreover, the safety devices such as an ammonia absorbing system and water curtains are analyzed how they mitigate the impact of an accident. In addition, consequence analysis is performed to provide a proper emergency response plan. Throughout these analysis, it is confirmed that installed safety devices effectively mitigate the impact of accidents, and the necessary time for an emergency response plan is suggested when ammonia release.
This study aims at the effective estimation of water supply capacity of small scale reservoir and the proposal of the data which is necessary to establish the water resources management plan of down stream area of the reservoir in the future by comparison and examination about reservoir operation technique for the security of agricultural water in small scale reservoir. The result of flow calculation by Tank model is used for the input data as the inflow data which is needed for the analysis of water supply capacity. Stochastic method, simulation method, and optimization method are used to examine the water supply capacity, and water security amount is compared with each method. From the analyses of water supply capacities by each method, slightly different results are shown in spite of the effort to compare them equally using input data such as inflow data under equal conditions, and the comparison of water supply capacities by each method are as follows; linear planning method, simulation method, and transition probability matrix method in the order of amount from the largest. It is thought that the simulation method in which comparatively reasonable application of the inflow data is possible and is simulated in successive time series dam operation of the three methods used in this study thus, simulation model is proper to estimate the water supply capacity of agricultural small scale reservoir. And it is judged that the heightening of efficiency of water resources utilization according to the development of downstream area of dam may be possible using the upward readjusted water supply amount of $55.18{\tiems}10^6ton$ and $63.7{\times}10^6ton$ at 95% and 90% supply reliability respectively which are above the planning water supply amount of $50.0{\times}10^6$ton when the simulation method is introduced as the standard.
The Ministry of the Environment conducts a water environment management plan and TMDL(Total Maximum Daily Load) for integrated watershed management, and determines whether the target water quality is achieved using water quality monitoring data. The concentration of monitoring points located in the downstream of the watershed is the outcome of complicated mechanisms such as influx of pollutants from the tributaries of the watershed and self-purification of river water. The purpose of this study is to analyze the effect of main stream and tributary water quality on the target water quality point using the water pollution source tracking and exceedance rate of watershed. In this study, FDC and exceedance rate analysis were performed on six water quality items including BOD and T-P, which are the targets of TMDL. Water quality items and points affecting the target water quality point were derived from flow rate. In this study, the pollution source tracking through FDC analysis and exceedance rate analysis will be able to establish more efficiently the water quality management strategy for each branch to achieve the target water quality.
This study aims at a proposal of the plan that can improve raw water quality by an experimental study using influent water of Nak-dong river, which has been used as raw water for drinking in U-city, through the establishment of the submerged biofilter process PILOT PLANT of media packing channel method. From the analysis of removal efficiency for each water quality item of the collected sample, following results are obtained. First of all, the removal rate of suspended material, BOD, COD, T-N, TOC, turbidity, and $NH_3$ -N appear 82%, 78%, 42%, 15%, 57%, 43%, 54%, and 55% respectively and it is known that the submerged biofilter process of media packing channel method takes effects on water quality improvement from the above analysis results of water treatment efficiency. And the analyzed results for water temperature, residence time, and activities of microorganism, which can be the factors affect on water quality improvement, are as follows. 1) The removal rate variation of SS, BOD, and COD attendant on water temperature change is examined and it is known that the removal rate increases at $13^{\circ}C$ or above. 2) The removal rate of SS, BOD, and COD attendant on residence time is most active in the range of 0~18hr, 0~1.8hr, 0~2.7hr respectively, so it is found that the removal rate becomes smaller after 2.7hr. 3) From the examination of microorganism activity with the abundance of normal bacteria, it is found that the floating bacteria decrease as the flow distance from raw water inflow point of PILOT PLANT increases, and the adhesive bacteria have no concern with the flow distance. And it its known that the biomass of fine algae decreases as the flow distance from the raw water inflow point of PILOT PLANT increases from the examination with Chl-a.
In this study, the pollutants contained in water and soil samples taken from the explosive demolition site were examined to investigate the effects on environment, and management plan of non-point source pollution in the demolition site was suggested through characterizing the movement of the pollutant with time. As results, pH value of the water and soil samples after the demolition work was 8.5~9.3 which exceeds the Korean environmental criterion of water and soil range due to calcium hydroxide compounds in the concrete. The concentration level of heavy metals caused by the explosive demolition doesn't exceed the environmental criterion of water and soil doesn't exceed the environmental criterion of water and soil quality, and the influence of water and soil pollution on the environment was not considered. The concentration of the heavy metals was analyzed and that of Cr, Cu, Zn and Hg among the heavy metals increased after the drilling and explosive demolition. This says that concentration of the heavy metals during explosive demolition works needs to be monitored. The most pollutants with time or rain dilution into the demolition site decreased and this means that the pollutants caused by the explosive demolition might have influenced to vicinity of the demolition sites as non-point pollution.
At present, the development in rainwater management approach is still insufficient due to the numerous adverse effects of urbanization. Storm water management is being developed to restore the natural state of water cycle undergoing several processes which were hindered such as infiltration and evapotranspiration. Low Impact Development (LID) was established in order to reduce the negative effects of urbanization to our environment. These developments can be used to respond to the effects of climate change such as heat island phenomenon. The effects of the development of new town in the district plan with application of LID facilities were studied and reported. Typically, LID facilities were applied in small scale development and were rarely used in large-scale development. Most of studies, however, did not assessment the effects of large-scale development projects with LID application to the natural water cycle. This study was conducted to simulate the urban hydrologic cycle simulation on Asan-Tangjeong in Korea. This study may be used in urban hydrologic cycle simulation and establishment of an urban water management plan in the future. Lastly, this study generated a model using the recently updated SWMM5 which determined the hydrologic cycle simulation after installation of LID facilities.
Journal of Korean Society for Geospatial Information Science
/
v.16
no.1
/
pp.75-81
/
2008
This study purpose is an industrial complex environmental improvement and trust management organization of waste water insurance for transparency of the GIS Application a waste water trust management system about extermination plan. A industrial waste water management system is a waste water management and trust management an input device and the trust a note of confirmation for printer trust management system, of manager by time, by work, a waste water by classify, by organization the trust volume will be the statistics analyze system and trust organization of waste water spacial information and a waste water trust volume and of a waste water volume a distribution chart furnish the citizens information WebGIS system. The has be Extermination a waste water trust management system is a waste water a point of start let's solve this project is grasp. And by computerization work the a time and an economy loss reduce. Be on controling trust and a waste water is distribution controling and citizens about environmentalism will be inspiration by WebGIS.
The development of new energy has attracted consideration attention due to the high oil price and environmental problems. In advanced country, they have tried to carry out a long range plan for energy. We need to develop new energy for Low Carbon Green Growth in Korea. The building is 30% among ratio of energy consumption in Korea. And in the past, heating energy was high ratio for energy using at home. But recently, the demand for cooling energy keeps growing due to rising average temperature on the earth and improvement of life quality. In this situation, the energy of lake water and ocean water has studied to utilize in advanced country because of low temperature at underwater. But the study for deep water is still a lot left to do. In this study, we analyzed district cooling system and the present condition. Analyzing the deep lake water cooling system in Toronto, we found an application of district cooling system using deep ocean water. Deep lake water uses heat source for district cooling and water source for city in Toronto. So reducing the initial cost, this city had economic effect. When DLWC was applied at existing building, the heat exchanger was installed instead of cooling tower and refrigerator. And the heat exchanger used to connect main pipe with cool water on city. System using deep ocean water can be applied as a similar way to supply cool water from lake to building.
When the Juam multipurpose dam which is connected with existing large water supply facilities is finished, water environment is changed from stream to lake. The changed quality of water should be examined. In this study, the result of water quality forecasting is analysed and an effective management plan of water quality is presented. Tn this study, the WASPS model that is a dynamic water quality simulation model was selected to forecast the water quality. This model forecasts movement of change of pollutants. For an application of the model, the subject areas were divided into seventeen sub-areas by considering change temperature depending measuring points and on depth of water. Meteorological data collected by the meteorological observatory and data about quality measured by the Korea Water Resources Development Corporation were used for an operation of the model. As a result of quality examination through quality data and estimated pollutant loading, the water quality environment criterion was grade II and the nutritive condition was measured as meso-graphic grade. In this study, an effective management was planned to improve water quality by reducing pollution load. According to the result of examination, when more than 30% of BOD was reduced it was recorded that the environment standard of water quality was improved to the second grade.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.